11114584nk.wordpress.com 11114584nk.wordpress.com

11114584nk.wordpress.com

11114584nk « The Development of my PN4105 Model Motorbike

The Development of my PN4105 Model Motorbike

http://11114584nk.wordpress.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR 11114584NK.WORDPRESS.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

January

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Sunday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 4.0 out of 5 with 11 reviews
5 star
4
4 star
5
3 star
1
2 star
0
1 star
1

Hey there! Start your review of 11114584nk.wordpress.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.4 seconds

FAVICON PREVIEW

  • 11114584nk.wordpress.com

    16x16

  • 11114584nk.wordpress.com

    32x32

CONTACTS AT 11114584NK.WORDPRESS.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
11114584nk « The Development of my PN4105 Model Motorbike | 11114584nk.wordpress.com Reviews
<META>
DESCRIPTION
The Development of my PN4105 Model Motorbike
<META>
KEYWORDS
1 post navigation
2 larr;
3 older posts
4 the end
5 end 🙂
6 1 comment
7 posted in
8 uncategorized
9 hindsight
10 painting 3
CONTENT
Page content here
KEYWORDS ON
PAGE
post navigation,larr;,older posts,the end,end 🙂,1 comment,posted in,uncategorized,hindsight,painting 3,thanks mate,the painting 2,the painting,leave a comment,the dream realised,the blades,recent posts,recent comments,on the end,on hindsight,eugemurphy
SERVER
nginx
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

11114584nk « The Development of my PN4105 Model Motorbike | 11114584nk.wordpress.com Reviews

https://11114584nk.wordpress.com

The Development of my PN4105 Model Motorbike

INTERNAL PAGES

11114584nk.wordpress.com 11114584nk.wordpress.com
1

The painting(2) « 11114584nk

https://11114584nk.wordpress.com/2013/12/03/the-painting2/comment-page-1

The Development of my PN4105 Model Motorbike. Starting with that frame, after all the P38 was grinded off the entire thing was re-primed with household white primer of all the things in the world, she stuck on very well: this was an endeavour of sunday morning. Now on tuesday I continue, thus far I have painted the frame glossy white too. It should it also be observed that the shield was welded on saturday morning:. Next came, the swords. They were given the bloody treatment:. Painting (3) →.

2

The End « 11114584nk

https://11114584nk.wordpress.com/2013/12/06/the-end

The Development of my PN4105 Model Motorbike. And so at last I have reached the end of this great journey, my bike is completed:. All be it the red is much darker in reality, there are a few issues with the bike. The Blades can literally take 20 minutes to stick on! 3 Hours a week is just not enough. This entry was posted in Uncategorized. One comment on “ The End. December 6, 2013 at 3:24 am. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:.

3

Hindsight « 11114584nk

https://11114584nk.wordpress.com/2013/12/05/hindsight

The Development of my PN4105 Model Motorbike. Now that the bike is finished there is one thing I want to draw to peoples attention: the bike has no way of standing on its own. This could very well be a serious issue. I have also learned that paints can have chemical reactions with one another as demonstrated when my frame developed cracks and imperfections. This entry was posted in Uncategorized. The End →. One comment on “ Hindsight. December 6, 2013 at 3:09 am. Leave a Reply Cancel reply.

4

September « 2013 « 11114584nk

https://11114584nk.wordpress.com/2013/09

The Development of my PN4105 Model Motorbike. Monthly Archives: September 2013. The seat had been bothering me for quite some time as regards what to do with it. Would I use a generic seat? As mentioned earlier, the Blades of Chaos are attached via chains seared to the users flesh. That gave me another idea, for this to authentic, I reckon some chains need to be added to the bike in some form or shape, they could be attached to the frame in some way, the handlebars, anywhere really. While thinking in the...

5

Hindsight « 11114584nk

https://11114584nk.wordpress.com/2013/12/05/hindsight/comment-page-1

The Development of my PN4105 Model Motorbike. Now that the bike is finished there is one thing I want to draw to peoples attention: the bike has no way of standing on its own. This could very well be a serious issue. I have also learned that paints can have chemical reactions with one another as demonstrated when my frame developed cracks and imperfections. This entry was posted in Uncategorized. The End →. One comment on “ Hindsight. December 6, 2013 at 3:09 am. Leave a Reply Cancel reply.

UPGRADE TO PREMIUM TO VIEW 12 MORE

TOTAL PAGES IN THIS WEBSITE

17

LINKS TO THIS WEBSITE

11114088gob.wordpress.com 11114088gob.wordpress.com

Finished tank | 11114088gob

https://11114088gob.wordpress.com/2013/12/04/finished-tank

December 4, 2013. The part I am most happy with about my bike is the Tank/ seat. To match the covering I initially planned to pant the tank a gloss black colour but seeing some of the other tanks in the product design lab I thought a mist of purple paint would look really nice. After Lacquering the tank it got a reflective gloss finish that I really liked. One thought on “ Finished tank. December 5, 2013 at 10:58 pm. Seat turned out class. Leave a Reply Cancel reply. Enter your comment here.

11114088gob.wordpress.com 11114088gob.wordpress.com

Resemblances | 11114088gob

https://11114088gob.wordpress.com/2013/12/06/resemblances

December 6, 2013. When showing my bike to a friend at home he suggested that it looked like a particular brand of bike from american, Victory Motorcycles. With the rear wheel covered in and the end coming to a point. I had no intention of this to happen but it was a happy coincidence. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public). You are commenting using your WordPress.com account. ( Log Out.

11151137moc.wordpress.com 11151137moc.wordpress.com

Exhaust construction and Engine paint. | 11151137moc

https://11151137moc.wordpress.com/2013/11/28/exhaust-construction-and-engine-paint

Exhaust construction and Engine paint. November 28, 2013. This was a complex job and required alot of think and rethinking. My design changed numerous times as I undertook this task due to the limited time I had to use. I started by measuring everything three times just to be sure! Any angles cut were done using the power hack saw set at 45 degrees. This allowed for 90 degree angles. November 28, 2013. Refining of the frame. Frame and Theme Decisions. Bike Completion. →. December 5, 2013 at 10:25 pm.

11114088gob.wordpress.com 11114088gob.wordpress.com

Covering with the rash vest | 11114088gob

https://11114088gob.wordpress.com/2013/12/04/covering-with-the-rash-vest

December 4, 2013. Covering with the rash vest. The frame was completed and it was time to cover it with the rash vest material. For the front part of the bike I found the back central section of the rash vest actually fitted the frame perfectly and only had to be sown along the existing seam which was a bonus. The back section posed a bit more trou ble but the front central section plus a small bit of the arm section covered it nicely and it all turned out very well. Leave a Reply Cancel reply.

11114088gob.wordpress.com 11114088gob.wordpress.com

Levelling the back axle. | 11114088gob

https://11114088gob.wordpress.com/2013/12/04/levelling-the-back-axle

December 4, 2013. Levelling the back axle. It was important to get the back axle aligned straight so to do this I welded on one of the mounts first then stuck a welding rod through it and the second mound. I then used a level to align it and made sure the rod was straight across the piece. Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public). You are commenting using your WordPress.com account. ( Log Out.

11114088gob.wordpress.com 11114088gob.wordpress.com

11114088gob | PN4105 Bike project | Page 2

https://11114088gob.wordpress.com/page/2

December 4, 2013. I decided to take a break from cutting and welding for one week and decided to get the suspension completed. The week after I finished the suspension I noticed it got a little rusty so i decided to sand it down with some emery paper and paint it with a zinc paint. December 4, 2013. Working with the rash vest. As I suspected the Rash vest was very easy to work with and I got it sown up pretty easily. December 4, 2013. December 4, 2013. Start of tear drop shape. December 4, 2013. When i g...

11114088gob.wordpress.com 11114088gob.wordpress.com

Finished product | 11114088gob

https://11114088gob.wordpress.com/2013/12/04/finished-product

December 4, 2013. I have finished the bike now and I must say I am very happy with how it turned out. The rash vest covering turned out brilliantly but I am most happy with the tank. If I was to change some things I would remake the handle bars so that the bar wouldn’t kink to do this I would use the hydraulic pipe benders as it would get a smoother bend. I would also choose a different colour paint for the handlebars as I feel the grey doesn’t really suit the black rash vest. December 4, 2013 at 10:11 pm.

11114088gob.wordpress.com 11114088gob.wordpress.com

Finished frame | 11114088gob

https://11114088gob.wordpress.com/2013/12/04/finished-frame

December 4, 2013. In about week 9 I got the frame fully finished and I was very happy with it. It was symmetrical and the welds were improving as I went along. 2 thoughts on “ Finished frame. December 4, 2013 at 9:21 pm. Cool shape. looks good. December 5, 2013 at 9:47 pm. Frame look very cool. I really like the enclosed wheel coming back to a point. Good job! Leave a Reply Cancel reply. Enter your comment here. Fill in your details below or click an icon to log in:. Address never made public).

11114088gob.wordpress.com 11114088gob.wordpress.com

October | 2013 | 11114088gob

https://11114088gob.wordpress.com/2013/10

Monthly Archives: October 2013. October 23, 2013. For the final frame design I firstly sketched it up on a sheet of paper. Next what did was draft that sketch as a drawing using dimensions that looked the best. Finally I made up a model of the frame on solidworks so that I could get dimensions for my teardrop shape that i could write onto the sheet and bring into the lab with me. October 23, 2013. First thing i did was:. 1 Design the tank shape and then. 2 Cut the amount of tank-cast material i needed.

11151137moc.wordpress.com 11151137moc.wordpress.com

Exhaust construction and Engine paint. | 11151137moc

https://11151137moc.wordpress.com/2013/11/28/exhaust-construction-and-engine-paint/comment-page-1

Exhaust construction and Engine paint. November 28, 2013. This was a complex job and required alot of think and rethinking. My design changed numerous times as I undertook this task due to the limited time I had to use. I started by measuring everything three times just to be sure! Any angles cut were done using the power hack saw set at 45 degrees. This allowed for 90 degree angles. November 28, 2013. Refining of the frame. Frame and Theme Decisions. Bike Completion. →. December 5, 2013 at 10:25 pm.

UPGRADE TO PREMIUM TO VIEW 11 MORE

TOTAL LINKS TO THIS WEBSITE

21

OTHER SITES

111144.net 111144.net

黄大仙11144 www.11144.com 黄大仙特码论坛 11144妙解玄机 黄大仙伯乐马经 11144新旺角码报

黄大仙11144 www.11144.com 黄大仙特码论坛 11144妙解玄机 黄大仙伯乐马经 11144新旺角码报. 黄大仙11144扯出戒刀,把索子都割断了,便扶起www.11144.com,叫 兄弟,俺自从和你买刀那日相别之后,洒家忧得你苦。 两个公人道 不敢拜问师父在那个寺里住持 智深笑道 你两个撮鸟问俺住处做甚么? Www11144.com问道 师兄,今投那里去 黄大仙11144道 ‘杀人须见血,救人须救彻’。 智深对www.11144.com道 兄弟,此去沧州不远了。 黄大仙11144又取出一二十两银子与www.11144.com,把三二两与两个公人道 你两个撮鸟! 接了银子,却待分手,黄大仙11144看着两个公人道 你两个撮鸟的头,硬似这松树么 二人答道 小人头是父母皮肉,包着些骨头。 三个人来到桥边,与庄客施礼罢,www.11144.com说道 相烦大哥报与大官人知道 京师有个犯人,送配牢城,姓林的求见。 Www11144.com道 不知几时回来 庄客道 说不定,敢怕投东庄去歇,也不见得。

111144.skyrock.com 111144.skyrock.com

111144's blog - Remi - Skyrock.com

Venez nombreux sur mon blog! J'espère qu'il vous plaira. Bonne visite à tous! 08/05/2008 at 11:43 PM. 22/11/2008 at 3:09 AM. Subscribe to my blog! Je les dans version perle niv 100. Don't forget that insults, racism, etc. are forbidden by Skyrock's 'General Terms of Use' and that you can be identified by your IP address (66.160.134.3) if someone makes a complaint. Please enter the sequence of characters in the field below. Posted on Saturday, 22 November 2008 at 3:12 AM. Add this video to my blog. Add th...

11114444.com 11114444.com

11114444.com域名出售,11114444.com可以转让,this domain is for sale

This domain name is for sale. 您正在访问的域名可以转让! Site=11114444.com&Menu=no" title="点击这里给我留言" target=" blank" class="bg". 数字域名应用案例 600086.com 东方金钰 300299.com 富春通信 300113.com 顺网 000520.com 金夫人 603001.com 奥康 300051.com 三五互联 600280.com 中央商场 002496.com 辉丰股份 16899.com 农一网 600654.com 中安消 601601.com 太平洋保险 600895.com 张江高科 600770.com 综艺集团 002195.com 二三四五 2345.com 二三四五 360.com 奇虎360 58.com 五八同城 10010.com 中国联通 10037.com 国美 189.cn 中国电信. 注 需要先注册成为易名中国(www.ename.cn)会员[ 注册帮助. 网站,登录ID账号,在 管理中心- 我的菜单- 域名管理- 模板管理 中添加模板。

111145.com 111145.com

111145.Com_新开石器时代私服_石器私服_非官方石器时代SF信息网

欢迎来到全球最大的石器时代私服信息网,本站提供最新石器时代资讯及玩家交流平台 请记住本站永久域名 WWW.111145.COM. 石器时代私服版本由1.0、2.0、2.5、3.0、4.0、5.0、6.0、7.0、8.0、8.5、9.0、9.5等等还有一些是由GM自创开发的各大版本。 如果您觉得本站不错,请记得收藏 WWW.111145.COM - 欢迎您常来看看经典石器,永恒回忆 尽在这里. 全球最大的石器时代私服信息发布网 - WWW.111145.COM - 固顶经典石器私服 - 石器时代私服排行榜 - 强力推荐区. Http:/ www.17495.com. 逆天来袭 人气火爆 团队运营 真正长久稳定品牌服. 吉鲁岛 吉鲁 岛 任务攻略 方. 吉鲁岛 吉鲁 岛 任务攻略. 吉鲁岛 吉鲁 岛 任务攻略 黄. 吉鲁岛 吉鲁 岛 任务攻略 矿. 全球最大的新开石器时代游戏私服 - WWW.111145.COM - 石器时代私服最新加入 - 审核发布区 加上本站链接即可显示在此. 大家都去新开F 7.5的版本找回大家自己最初的感觉 还记. 轩儀石器 没有最好的石器 只有更好的石器 微变9.7版.

1111456.com 1111456.com

n购物导航|团购网|团购网站大全|团购投诉|团购维权,最大的团购导航,北京团购网站大全zz

Domain on Sale(I am broker). Qq:780231698(晚19:00-24:00不定时在线3小时) Email: 2domain@163.com.

11114584nk.wordpress.com 11114584nk.wordpress.com

11114584nk « The Development of my PN4105 Model Motorbike

The Development of my PN4105 Model Motorbike. And so at last I have reached the end of this great journey, my bike is completed:. All be it the red is much darker in reality, there are a few issues with the bike. The Blades can literally take 20 minutes to stick on! 3 Hours a week is just not enough. Now that the bike is finished there is one thing I want to draw to peoples attention: the bike has no way of standing on its own. Next came, the swords. They were given the bloody treatment:. Once those fini...

111146.ccnpic.com 111146.ccnpic.com

111146-首页-CCN传媒(中国影像传媒)

我从事业余摄影10多年,喜欢拍摄生态,自然等题材的片子. 1971年出生,所用器材雅西卡FX-3super200028-80.

111146.com 111146.com

好运一点通|高手解玄机|香港六合彩开奖结果|香港正版挂牌|藏宝图|好运之家-独步天下!|www.222206.com

1976年7月2日, 香港政府奖券管理局 宣布开办 香港六合彩。 特码开彩的办法,是用摇球的方法粤语叫作 搅珠 ,把 49.

111147.com 111147.com

彩霸王|香港彩霸王|彩霸王平特论坛|彩霸王平特一肖|彩霸王精准免费平特一肖|彩霸王一肖中平特

111148.com 111148.com

四川合评律师事务所

中国银行金牛支行、锦江支行、武侯支行 中国农业银行蜀都支行 中国建设银行金河支行 中国工商银行东大街支行、高新支行 成都商业银行高新支行 招商银行双楠支行、高升桥支行 中保下属各支公司 中华联保各支公司等.