The House Extension and New Garage

This is an overview of our house extension and new garage which started in early September 2009. This 26 week project ran until the end of April 2010 and, allowing for 4 weeks of weather hold-ups, it finished on time; this included the laying of the entire paved patio, paths, and driveway, which was not originally taken into consideration. Please use the links on the right to see the earlier months of the project. Incidentally, if you click on any photos, they will enlarge in a new window.

http://agparkin.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR AGPARKIN.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

September

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Tuesday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 3.6 out of 5 with 14 reviews
5 star
4
4 star
5
3 star
3
2 star
0
1 star
2

Hey there! Start your review of agparkin.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.2 seconds

FAVICON PREVIEW

  • agparkin.blogspot.com

    16x16

  • agparkin.blogspot.com

    32x32

  • agparkin.blogspot.com

    64x64

  • agparkin.blogspot.com

    128x128

CONTACTS AT AGPARKIN.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
The House Extension and New Garage | agparkin.blogspot.com Reviews
<META>
DESCRIPTION
This is an overview of our house extension and new garage which started in early September 2009. This 26 week project ran until the end of April 2010 and, allowing for 4 weeks of weather hold-ups, it finished on time; this included the laying of the entire paved patio, paths, and driveway, which was not originally taken into consideration. Please use the links on the right to see the earlier months of the project. Incidentally, if you click on any photos, they will enlarge in a new window.
<META>
KEYWORDS
1 the summary
2 posted by
3 samp
4 no comments
5 i did it
6 older posts
7 followers
8 about me
9 blog archive
10 october
CONTENT
Page content here
KEYWORDS ON
PAGE
the summary,posted by,samp,no comments,i did it,older posts,followers,about me,blog archive,october
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

The House Extension and New Garage | agparkin.blogspot.com Reviews

https://agparkin.blogspot.com

This is an overview of our house extension and new garage which started in early September 2009. This 26 week project ran until the end of April 2010 and, allowing for 4 weeks of weather hold-ups, it finished on time; this included the laying of the entire paved patio, paths, and driveway, which was not originally taken into consideration. Please use the links on the right to see the earlier months of the project. Incidentally, if you click on any photos, they will enlarge in a new window.

INTERNAL PAGES

agparkin.blogspot.com agparkin.blogspot.com
1

The House Extension and New Garage: Building Project - End of Wk 29

http://agparkin.blogspot.com/2010/04/building-project-end-of-wk-29.html

The House Extension and New Garage. Sunday, 18 April 2010. Building Project - End of Wk 29. On Monday Gary, the proprietor, and I had a meeting to discuss outstanding work that was needed, and on Tuesday there was a big push to clear some of these items, which included. Finishing the blockwork near the house,. The steps outside the rear hall and lounge doors,. The skirting boards in the kitchen,. And boxing in the pipework in the new loo. Subscribe to: Post Comments (Atom). View my complete profile.

2

The House Extension and New Garage: April 2010

http://agparkin.blogspot.com/2010_04_01_archive.html

The House Extension and New Garage. Thursday, 29 April 2010. Building Project - Wk 31 and The End. On Monday Gary tiled the kitchen walls between the work sufaces and the upper cupboards and. On Tuesday he did the grouting to finish the job to give this wonderful final appearance. James was back from his volcano extended holiday, and the second pair of gate posts rose rapidly. On Tuesday all was done, and a final brushing of the cement saw the job completed with a topping off on both pairs of gate posts.

3

The House Extension and New Garage: March 2010

http://agparkin.blogspot.com/2010_03_01_archive.html

The House Extension and New Garage. Monday, 29 March 2010. Building Project - Wk 27 Day 1. Yesterday I mentioned the need to drop the kerb, and on cue today the contractors for Hampshire Highways arrived to remove the existing kerb and pavement. So it soon looked like this. The existing gateway kerb is being slightly widened, and now that they have seen the drain which has sunk they are going to sort that out too - later. In the new en-suite the bath went into place. Sunday, 28 March 2010. By the end of ...

4

The House Extension and New Garage: October 2009

http://agparkin.blogspot.com/2009_10_01_archive.html

The House Extension and New Garage. Thursday, 29 October 2009. Building Project - Wk 8 Day 4. This is the first garage wall corner to be topped off with the same detail as on the house. When up on the scaffolding deck, this is the view down the 'loft' of the garage before the front upper wall is built. By the end of Thursday the back upper wall was in place. And the roofing felt was going on. Tuesday, 27 October 2009. Building Project - Wk 8 Day 2. This is the daylight version of yesterday's night shot.

5

The House Extension and New Garage: February 2010

http://agparkin.blogspot.com/2010_02_01_archive.html

The House Extension and New Garage. Friday, 26 February 2010. Building Project - All of Wk 22 (Pt 2). I suggest you scroll down and read Pt 1 first, and then come back to this. With plastering complete on the ground floor of the extension, the work started upstairs. With ceilings and floors now all in place, the only way to the extended bedroom was through the house. With this excellent end result. It was on Wednesday that Ian started screwing a metal plate to the wall of the breakfast room. Building Pro...

UPGRADE TO PREMIUM TO VIEW 10 MORE

TOTAL PAGES IN THIS WEBSITE

15

OTHER SITES

agpark.jp agpark.jp

AG Park | 青森県(弘前市)の駐車場

AG Park – 青森県 弘前市 の駐車場.

agpark.org agpark.org

主頁 - 基督教神召會欣榮堂

敬拜主領 羅振威弟兄 講員 何慶堯牧師. 2014 基督教神召會欣榮堂 版權所有 不得轉載.

agparkchurch.org agparkchurch.org

主頁 - 基督教神召會欣榮堂

請弟兄姊妹到 敬拜錄音 及 講道錄音 下載。 2016 基督教神召會欣榮堂 版權所有 不得轉載.

agparkes.com agparkes.com

My Site

This is my site description. Powered by InstantPage® from GoDaddy.com. Want one?

agparkin.blogspot.com agparkin.blogspot.com

The House Extension and New Garage

The House Extension and New Garage. Wednesday, 17 November 2010. This project has been a great success, and from our point of view, enjoyable too, as our dreams started to come true. This was particularly so because of the daily communication that Gary Douthwaite, the proprietor of GD and Sons, maintained with us throughout. We knew who was going to be on-site, and what the targets were for the coming days. Thursday, 29 April 2010. Building Project - Wk 31 and The End. On Tuesday all was done, and a fina...

agparks.com agparks.com

A.G. Parks

agparms.com agparms.com

AGP Arms - Innovative Products for the Firearms Industry

Loading. Please wait. Or Create an account. View Cart ( 0. AGP Arms 10/22 Handguard for Ruger Takedown. AGP Arms 10/22 Takedown Conversion. AGP Arms 10/22 Takedown Conversion Complete. AGP Arms Saiga-12 High Capacity Magazine. AGP Arms 10/22 Folding Stock Kit Gen2. AGP Arms 10/22 Handguard for Ruger Takedown. AGP Arms Folding Stock End Cap. AGP Arms 10/22 Takedown Conversion Hand Guard CF Micro Shroud. AGP Arms 10/22 Takedown Conversion Hand Guard CF Low Profile Long. Like Us on Facebook.

agparquitectes.com agparquitectes.com

inici - Arquitectura Genís Planelles

MARIONA GENÍS VINYALS. Arquitecta per l'ESTAB - UPC. Especialista en Restauració i Patrimoni. Coordinadora del Postgrau de Restauració d'Espais de l'Escola BAU, Universitat de Vic. Professora a l'ETSAB, UPC. Professora a l'Escola BAU, Universitat de Vic. Arquitecte per l'ESTAB - UPC. Especialista Construcció, Rehabilitació i Instal·lacions. Col·laborador Professional de l'ITeC. Coordinador del Postgrau de Rehabilitació d'Espais de l'Escola BAU, Universitat de Vic.

agparrott.com agparrott.com

Asphalt Paving Contractors :: A.G. Parrott Company :: Maryland

Elkridge, Maryland 21075. AG Parrott Company has served the Baltimore and surrounding areas as an asphalt paving contractor for over 60 years. From base locations in Howard and Carroll Counties, Parrott's geographical work area extends well into other areas of Baltimore, Montgomery, and Anne Arundel Counties. Whether your project is public or private, new or existing, commercial or residential, Parrott can accommodate all of your paving needs at a competitive price. Parrott work crews strive to perfo...

agpars.com agpars.com

آژیانه گستر پارس