alamoartoo.blogspot.com alamoartoo.blogspot.com

ALAMOARTOO.BLOGSPOT.COM

Astromech Build

This is the progress log of my first Astromech Droid build. Monday, November 3, 2008. Frame Completion Getting Closer. I had the shoulder mounting plates re-cut last week. This time around there were NO problems with the dimentions. Also had the vertical UAC rails re-cut, this time I had the mounting holes drill on the router so that I wouldn't botch those pieces again. Purchased 12' of ¾" round rod to have the riser rods machined. Saturday, October 18, 2008. This weekend was Maker Faire. I had the utili...

http://alamoartoo.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR ALAMOARTOO.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

September

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Thursday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 3.7 out of 5 with 9 reviews
5 star
5
4 star
0
3 star
2
2 star
0
1 star
2

Hey there! Start your review of alamoartoo.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.5 seconds

FAVICON PREVIEW

  • alamoartoo.blogspot.com

    16x16

  • alamoartoo.blogspot.com

    32x32

  • alamoartoo.blogspot.com

    64x64

  • alamoartoo.blogspot.com

    128x128

CONTACTS AT ALAMOARTOO.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Astromech Build | alamoartoo.blogspot.com Reviews
<META>
DESCRIPTION
This is the progress log of my first Astromech Droid build. Monday, November 3, 2008. Frame Completion Getting Closer. I had the shoulder mounting plates re-cut last week. This time around there were NO problems with the dimentions. Also had the vertical UAC rails re-cut, this time I had the mounting holes drill on the router so that I wouldn't botch those pieces again. Purchased 12' of ¾ round rod to have the riser rods machined. Saturday, October 18, 2008. This weekend was Maker Faire. I had the utili...
<META>
KEYWORDS
1 skip to main
2 skip to sidebar
3 astromech build
4 posted by
5 no comments
6 maker faire
7 slow progress
8 vent frame
9 more frame parts
10 first parts made
CONTENT
Page content here
KEYWORDS ON
PAGE
skip to main,skip to sidebar,astromech build,posted by,no comments,maker faire,slow progress,vent frame,more frame parts,first parts made,1 comment,star wars,rebel legion,obi wan kenobi costumes,anakin skywalker costumes,astromech factory,blog archive
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Astromech Build | alamoartoo.blogspot.com Reviews

https://alamoartoo.blogspot.com

This is the progress log of my first Astromech Droid build. Monday, November 3, 2008. Frame Completion Getting Closer. I had the shoulder mounting plates re-cut last week. This time around there were NO problems with the dimentions. Also had the vertical UAC rails re-cut, this time I had the mounting holes drill on the router so that I wouldn't botch those pieces again. Purchased 12' of ¾" round rod to have the riser rods machined. Saturday, October 18, 2008. This weekend was Maker Faire. I had the utili...

INTERNAL PAGES

alamoartoo.blogspot.com alamoartoo.blogspot.com
1

Astromech Build: Frame Completion Getting Closer

http://alamoartoo.blogspot.com/2008/11/frame-completion-getting-closer.html

This is the progress log of my first Astromech Droid build. Monday, November 3, 2008. Frame Completion Getting Closer. I had the shoulder mounting plates re-cut last week. This time around there were NO problems with the dimentions. Also had the vertical UAC rails re-cut, this time I had the mounting holes drill on the router so that I wouldn't botch those pieces again. Purchased 12' of ¾" round rod to have the riser rods machined. Subscribe to: Post Comments (Atom). Star Wars related links.

2

Astromech Build: October 2008

http://alamoartoo.blogspot.com/2008_10_01_archive.html

This is the progress log of my first Astromech Droid build. Saturday, October 18, 2008. This weekend was Maker Faire. In Austin. This was the 2nd year it has been in Austin. It was great day weather wise and I took a very leisurely drive up. There were some very cool gadgets there, but I was hoping for a little more in robotics. They did have battle bots and that was very cool. Subscribe to: Posts (Atom). Star Wars related links. View my complete profile.

3

Astromech Build: More frame parts

http://alamoartoo.blogspot.com/2008/09/more-frame-parts.html

This is the progress log of my first Astromech Droid build. Wednesday, September 24, 2008. I had the utility arm carrier horizontal and vertical rails cut today. At the moment they are unfinished. Drilling and tapping are still needed. Pix coming soon. Subscribe to: Post Comments (Atom). Star Wars related links. View my complete profile.

4

Astromech Build: Vent Frame

http://alamoartoo.blogspot.com/2008/09/vent-frame.html

This is the progress log of my first Astromech Droid build. Monday, September 29, 2008. I had the vent frame cut today. Still need to drill and tap the #4-40 holes, but things are coming along nicely. Subscribe to: Post Comments (Atom). Star Wars related links. View my complete profile.

5

Astromech Build: Maker Faire

http://alamoartoo.blogspot.com/2008/10/maker-faire.html

This is the progress log of my first Astromech Droid build. Saturday, October 18, 2008. This weekend was Maker Faire. In Austin. This was the 2nd year it has been in Austin. It was great day weather wise and I took a very leisurely drive up. There were some very cool gadgets there, but I was hoping for a little more in robotics. They did have battle bots and that was very cool. Subscribe to: Post Comments (Atom). Star Wars related links. View my complete profile.

UPGRADE TO PREMIUM TO VIEW 4 MORE

TOTAL PAGES IN THIS WEBSITE

9

OTHER SITES

alamoargentina.com.ar alamoargentina.com.ar

Alamo Rent A Car - Alquiler de autos en Argentina

Esta pà gina utiliza marcos, pero su explorador no los admite.

alamoarmsllc.com alamoarmsllc.com

Alamo Arms LLC

Sights / Lasers / Lights. Barrels / Choke Tubes. Grips / Pads / Stocks. The largest inventory from hundreds of manufacturers! Smith and Wesson 10048 Bodyguard 380 w/CT Laser DAO 380ACP 2.8" 6 1 Blk Poly Grip. ID: 153362 …. REG: $ 449.00. More like this →. Double Tap .45ACP 2 Round Aluminum Matte Black 3" Ported Barrel. ID: 39328 ¦. REG: $ 569.00. More like this →. Century Arms M92 Semi-automatic 7.62X39 10" Steel Black Black 30Rd. ID: 59371 ∴. REG: $ 675.70. More like this →. ID: 113859 …. ID: 98437 &mid...

alamoarmstexas.com alamoarmstexas.com

dlstorer_alamoarmstexas

Call Us (111) 234 - 5678. 21/B, London Campus, British Road, Birmingham, UK. THIS WOULD HAVE MADE A DIFFERENCE! The BlackBird Wordpress Theme is highly optimized to look Professional. So that your website looks great to your visitors. This BlackBird Wordpress Theme gives you the easiness of building your site without any coding skills required. Join Us On Facebook. Join Us On Twitter. Join Us On In.com. Subscribe to Our Blog. Dlstorer alamoarmstexas - Just another WordPress site.

alamoart.blogspot.com alamoart.blogspot.com

Alamo Art - a Series of paintings of the Alamo

Alamo Art - a Series of paintings of the Alamo. I have created a blog devoted to a series of paintings I am doing of San Antonio's Alamo, the "Cradle of Texas Liberty". Tuesday, September 11, 2012. Saturday, June 2, 2012. Oil on canvas, 11x14". Saturday, August 20, 2011. Sunday, July 17, 2011. Tuesday, February 1, 2011. Color pencil, 8x10". Forgot to post this one in December. Saturday, July 3, 2010. Thursday, June 17, 2010. Ink and watercolor pencil on foam core, 4x6". Subscribe to: Posts (Atom).

alamoartisans.com alamoartisans.com

Site is under construction

We are coming soon! Big news as we return from the holidays. Coming soon, our crack team of website gurus will be launching the AlamoArtisans.com website they have been preparing without sleep for many moons. We are proud to present a site with a simple look and state-of-the-art shopping experience. Enter your email to subscribe.

alamoartoo.blogspot.com alamoartoo.blogspot.com

Astromech Build

This is the progress log of my first Astromech Droid build. Monday, November 3, 2008. Frame Completion Getting Closer. I had the shoulder mounting plates re-cut last week. This time around there were NO problems with the dimentions. Also had the vertical UAC rails re-cut, this time I had the mounting holes drill on the router so that I wouldn't botch those pieces again. Purchased 12' of ¾" round rod to have the riser rods machined. Saturday, October 18, 2008. This weekend was Maker Faire. I had the utili...

alamoartsballet.org alamoartsballet.org

Alamo Arts Ballet Theatre - Home

San Antonio, TX 78213. Are you an experienced dancer who comes to life in front of an audience, or maybe you seek training and the opportunity to dance with professionals? Perhaps you’ve never set foot on stage but are passionate about ballet and want to be involved. If so, then Alamo Arts Ballet Theatre welcomes you. Coming Soon, words from our dancers. Proudly powered by Weebly.

alamoaruba.com alamoaruba.com

Welcome to Alamo Aruba

Esta página usa marcos, pero su explorador no los admite.

alamoasesores.com alamoasesores.com

Welcome

My site is launching soon.

alamoashrae.org alamoashrae.org

ASHRAE Alamo - Home Page

Please click below to be taken to the Member Login screen. Not a member yet? Click here to join. ASHRAE Student Chapters and Activities. March is already here? I can’t believe how quickly time passes. The next 2 months with be packed with great ASRHAE events; come enjoy! MEP engineer discussion, ice hockey, pool HVAC systems, golf, new SA code adoption, and a CRC are all in our future. Call ASHRAE what you want, but you can’t call it boring! First let’s reflect. Thursday, Feb 27. At 4:30 at the ATT Cente...

alamoasphalt.com alamoasphalt.com

Alamo Asphalt

Alamo Asphalt Company, Inc. San Antonio’s Most Reliable Commercial/Residential Pavement Maintenance Company. Please call or email for your FREE ESTIMATE. Phone: 210.344.0424. Fax: 210.344.1489.