Project Management: Typical Electrical Standard (for my own reference only)
http://projectmanagement4.blogspot.com/2009/12/types-of-electrical-standard-for-my-own.html
Thursday, December 3, 2009. Typical Electrical Standard (for my own reference only). The design, specification, installation commissioning and testing of all systems, equipment and materials shall be in accordance with the following codes and standards. Any codes and standards proposed in place of or in addition to those specified should be added:. 60694 (2002-01) Common specifications for high-voltage switchgear and controlgear standards. IEC 62271-102 Corr.3 (2005-02) Corrigendum 3. Instrument transfor...
projectmanagement4.blogspot.com
Project Management: Minutes of Monthly Meeting
http://projectmanagement4.blogspot.com/2009/11/minutes-of-monthly-meeting.html
Thursday, November 19, 2009. Minutes of Monthly Meeting. Minutes of Project Progress Meeting No. Item Discussion Action By. 20 Confirmation of Previous Minutes Of Meeting. 30 Matters Arising From Previous Minutes of Meeting. 31 Site Organisation Chart. 32 Civil Work Programmes / Scheduling (CPM )- Amendment. 35 Safety and Health. 36 QA and QC Manual. 38 Monthly Progress Report. 381 Under item 2.1.2. Electrical Work: Design. 382 Under item 2.1.3 Electrical Works: site Works. 40 Any Other Business. FEATURE...
projectmanagement4.blogspot.com
Project Management: Construction project – Type of Drawings
http://projectmanagement4.blogspot.com/2009/11/construction-project-type-of-drawings.html
Friday, November 20, 2009. Construction project – Type of Drawings. Abbreviations, Symbols and General Information. Civil Specialties, Incl. Subsurface Investigation. Dredging, Bathymetry, Protection Works. Grading and Site Preparation. Land Acquisition, Lease, Easement, Zoning. Road Bridges and Railroads. Site Plans, Perspectives / Area Layouts. Slope Protection and Stabilizing Walls. Surfacing, Paving, Roads. Tunneling (incl. Culvert and Manhole Details). Abbreviations, Symbols and General Information.
projectmanagement4.blogspot.com
Project Management: Construction Project - Type of Documentation
http://projectmanagement4.blogspot.com/2009/11/construction-project-type-of.html
Friday, November 20, 2009. Construction Project - Type of Documentation. Certification Dossier (Quality Control Record Book). Data Sheets and Product Data Packs. Engineering and Field Sketches. Factory Acceptance Test (FAT). Functional and Performance Test. Inspection and Test Plan. Instrument Cable / Drum Schedule. Manufacturing Data Report Index. Method Statement / Engineering Guide. Operating and Maintenance Manual. Technical Report / Study. Technical Schedules (incl. Bar Bending). To help all the wor...
projectmanagement4.blogspot.com
Project Management: November 2009
http://projectmanagement4.blogspot.com/2009_11_01_archive.html
Friday, November 20, 2009. Construction Project - Type of Documentation. Certification Dossier (Quality Control Record Book). Data Sheets and Product Data Packs. Engineering and Field Sketches. Factory Acceptance Test (FAT). Functional and Performance Test. Inspection and Test Plan. Instrument Cable / Drum Schedule. Manufacturing Data Report Index. Method Statement / Engineering Guide. Operating and Maintenance Manual. Technical Report / Study. Technical Schedules (incl. Bar Bending). Abbreviations, Symb...
projectmanagement4.blogspot.com
Project Management: Progress Reporting Requirement
http://projectmanagement4.blogspot.com/2009/11/progress-reporting-requirement.html
Thursday, November 19, 2009. The Contractor shall submit a detailed progress report for each month up to the agreed cut-off date. The monthly report shall contain, but not be limited to:. 8226; A listing of late activities compared to the original planned date (early finish). 8226; Explanations for late activities and problem areas which are having, or are likely to have, impact on the project schedule. 8226; Details of measures proposed to bring late activities back on schedule. 8226; Milestones achieved.
projectmanagement4.blogspot.com
Project Management: December 2009
http://projectmanagement4.blogspot.com/2009_12_01_archive.html
Thursday, December 3, 2009. Typical Electrical Standard (for my own reference only). The design, specification, installation commissioning and testing of all systems, equipment and materials shall be in accordance with the following codes and standards. Any codes and standards proposed in place of or in addition to those specified should be added:. 60694 (2002-01) Common specifications for high-voltage switchgear and controlgear standards. IEC 62271-102 Corr.3 (2005-02) Corrigendum 3. Instrument transfor...