gabriel-pm.com
DAVE O’BRIEN | Gabriel Project Management, LLC
http://gabriel-pm.com/about/dave-obrien
Dave has enjoyed over 30 years of construction management experience, effectively managing an average of over $150 Million in construction revenues annually in the commercial, education, healthcare, food and beverage, and industrial markets. Since founding Gabriel Project Management, Dave has worked on industrial, educational, and numerous food and beverage projects. Craig Baggett; Warehouse and Packaging Manager, Anheuser-Busch InBev, St. Louis Missouri. 16150 Main Circle Drive. Chesterfield, MO 63107.
gabriel-pm.com
INDUSTRIAL | Gabriel Project Management, LLC
http://gabriel-pm.com/industrial
8220;We hired Gabriel to assist us with developing plans and scope of work to consolidate our buildings in the middle of our plant. We needed someone with a great wealth of construction and construction procurement experience that could provide our project with common sense ideas and cost savings plans. Gabriel was able to save us a considerable amount of effort by developing the right approach toward construction, demolition, and material salvage.”. 16150 Main Circle Drive. Chesterfield, MO 63107.
gabriel-pm.com
SERVICES | Gabriel Project Management, LLC
http://gabriel-pm.com/services
Gabriel Project Management Services: We are the common thread throughout the life of a project and our influence covers pre-design, design, preconstruction, construction, post-construction, and follow-up phases of every project. 16150 Main Circle Drive. Chesterfield, MO 63107. Planning, Architecture and Interior Design. Mechanical, Construction, Maintenance, Service, Design. Alper Audi, Inc. Gabriel Project Management, LLC.
gabriel-pm.com
POST CONSTRUCTION | Gabriel Project Management, LLC
http://gabriel-pm.com/services/post-construction
Post Construction Services: Be Thorough. In that first critical year of occupancy we work with the General Contractor to make sure that any that develops is dealt with as swiftly as possible. Prior to the typical one-year warranty expiring, we work with the General Contractor and the design team to perform an 11-month walkthrough of the facility to make sure that any outstanding items get recorded and dealt with prior to the end of the warranty period. 16150 Main Circle Drive. Chesterfield, MO 63107.
gabriel-pm.com
FOOD AND BEVERAGE | Gabriel Project Management, LLC
http://gabriel-pm.com/foodservice
8220;Their level of experience in the building industry coupled with their common sense approach to problem-solving won our confidence and support, which allowed us to focus on our business, while they focused on our building project. I would be happy to recommend Gabriel to my beer wholesaler associates.”. L&F Distributors, McAllen Texas. 16150 Main Circle Drive. Chesterfield, MO 63107. Planning, Architecture and Interior Design. Mechanical, Construction, Maintenance, Service, Design. Alper Audi, Inc.
gabriel-pm.com
CONSTRUCTION | Gabriel Project Management, LLC
http://gabriel-pm.com/services/construction-services
Construction Services: Work the Plan. Representing the owner by overseeing the General Contractor’s operations and management of their subs, suppliers, and vendors to insure that the overall project goals and objectives are met with regard to quality, budget, and schedule on a daily basis. Periodic site visits with the design team present to evaluate field implementation of the design and insuring that the General Contracting team member is monitoring quality control. 16150 Main Circle Drive.
gabriel-pm.com
PAST PROJECTS | Gabriel Project Management, LLC
http://gabriel-pm.com/projects/past-projects
L&F Distributing, McAllen TX Completed Spring of 2014; Total Cost approximately $12 Million. Added 74,000 s.f. to existing warehousing operations with extensive sitework improvements, converted existing drive-through area to corporate office space, replaced cooling system in existing C.E.W. and renovated all existing office space. Watkins Distributing, Idaho Falls, ID Completed Fall of 2013; Total Cost approximately $8 Million. Southwest Beverage, Lake Charles LA Completed Spring of 2015; Total Cost $15 ...
gabriel-pm.com
ABOUT | Gabriel Project Management, LLC
http://gabriel-pm.com/about
16150 Main Circle Drive. Chesterfield, MO 63107. Planning, Architecture and Interior Design. Mechanical, Construction, Maintenance, Service, Design. Alper Audi, Inc. Gabriel Project Management, LLC.
gabriel-pm.com
HEALTHCARE | Gabriel Project Management, LLC
http://gabriel-pm.com/health
John R. Farnen. 16150 Main Circle Drive. Chesterfield, MO 63107. Planning, Architecture and Interior Design. Mechanical, Construction, Maintenance, Service, Design. Alper Audi, Inc. Gabriel Project Management, LLC.