timboysflyerprojects.blogspot.com
Timboy's American Flyer Trains: Bucky's Beer Start-Up
http://timboysflyerprojects.blogspot.com/2012/01/buckys-beer.html
Timboy's American Flyer Trains. To return to the home page, Click Here:. I think I have all the carpentry work done and now it is time to paint. But first, here are the "raw" pics:. I have attempted to augment the Barrel Loader accessory with scratch-built structures. While I think the Barrel Loader is one of the - if not the - best accessory, I never liked that ramp; especially with the knurled nuts right on the bottom. I decided to over-build a longer ramp to hide all of that.
displaylayoutsrule.blogspot.com
Display Layouts Rule: August 2012
http://displaylayoutsrule.blogspot.com/2012_08_01_archive.html
Here is a link to the "old" Flyer layout I tore down to make room for this one: American Flyer Trains Are Best. Saturday, August 25, 2012. The Sledge Hammer Is Ready. Friday, August 17, 2012. A Classic Display Layout. Here is a link to the "old" layout. I will keep the blog up for posterity. Http:/ americanflyertrainsarethebest.blogspot.com/. Subscribe to: Posts (Atom). Watermark template. Powered by Blogger.
displaylayoutsrule.blogspot.com
Display Layouts Rule: The Sibley Tribute - Final Pics
http://displaylayoutsrule.blogspot.com/2013/03/the-sibley-tribute-final-pics.html
Here is a link to the "old" Flyer layout I tore down to make room for this one: American Flyer Trains Are Best. Thursday, March 28, 2013. The Sibley Tribute - Final Pics. The video was nice, but still pics show more detail. Subscribe to: Post Comments (Atom). The Sibley Tribute - Final Pics. The Sibley Tribute - Conclusion. Party Like Its 1959! Mount Sibley - Conclusion. Mount Sibley - Part III. The Ugly Part Of Mountain Building. Mount Sibley - Part I. The Trains On The Tracks Go Round and Round.
displaylayoutsrule.blogspot.com
Display Layouts Rule: December 2012
http://displaylayoutsrule.blogspot.com/2012_12_01_archive.html
Here is a link to the "old" Flyer layout I tore down to make room for this one: American Flyer Trains Are Best. Saturday, December 29, 2012. Bridge Over RailRoad Quiet. That's what I did. I use very small brass screws to hold the track down. Neither the trestles nor the bridge are attached to the table and I don't think I will have to. So far, I believe I have six distinct fingerprints on this Sibley variation:. 1) real ballast instead of rubber roadbed. 3) trestles instead of a ramp. It has to sit up hi...
displaylayoutsrule.blogspot.com
Display Layouts Rule: Are We There Yet?
http://displaylayoutsrule.blogspot.com/2013/03/are-we-there-yet.html
Here is a link to the "old" Flyer layout I tore down to make room for this one: American Flyer Trains Are Best. Friday, March 1, 2013. Are We There Yet? I need to figure out some way of servicing Fed Ups. Bucky's Beer will be okay. I'm done for today. I'll need to ballast the track in the industry area and make a road of sorts into there via the underpass. I moved the Coal Loader to where I stole Fed Ups. I think it will work better there and these two industries begged a grouping. Party Like Its 1959!
timboysflyerprojects.blogspot.com
Timboy's American Flyer Trains: November 2011
http://timboysflyerprojects.blogspot.com/2011_11_01_archive.html
Timboy's American Flyer Trains. To return to the home page, Click Here:. The Les Forest Log Loading Station. The Les Forest Log Loading Station is now open for business! I had a few pieces of junk delivered from the Flyer Junk Yard. The workers thought this piece from an old remote-controlled switch would make a good place for them to hang their chains. With the help of a telephoto lens, I was able to capture a couple images of the Swamp Loggers busy rounding up some old logs from the mud and the muck.
displaylayoutsrule.blogspot.com
Display Layouts Rule: Guilford
http://displaylayoutsrule.blogspot.com/2013/03/guilford.html
Here is a link to the "old" Flyer layout I tore down to make room for this one: American Flyer Trains Are Best. Thursday, March 14, 2013. Pax service is now running from Guilford to all points;. Subscribe to: Post Comments (Atom). The Sibley Tribute - Final Pics. The Sibley Tribute - Conclusion. Party Like Its 1959! Mount Sibley - Conclusion. Mount Sibley - Part III. The Ugly Part Of Mountain Building. Mount Sibley - Part I. The Trains On The Tracks Go Round and Round. Are We There Yet?
displaylayoutsrule.blogspot.com
Display Layouts Rule: The M&M Loader
http://displaylayoutsrule.blogspot.com/2013/03/the-m-loader.html
Here is a link to the "old" Flyer layout I tore down to make room for this one: American Flyer Trains Are Best. Friday, March 15, 2013. I've posted vids of my trains running. This time I decided to take some pics of the basic scenery I laid in yesterday and today. The M&M Loader is ready. I still need to wire it up, though. Keep your eye on that road. It starts from off the layout and goes to the M&M Loader from under that little deck bridge. That same road then crosses massive tracks and goes to Guilford.
displaylayoutsrule.blogspot.com
Display Layouts Rule: Mount Sibley - Conclusion
http://displaylayoutsrule.blogspot.com/2013/03/mount-sibley-conclusion.html
Here is a link to the "old" Flyer layout I tore down to make room for this one: American Flyer Trains Are Best. Saturday, March 9, 2013. Mount Sibley - Conclusion. Mount Sibley is now completed. Regular freight and pax service can now resume. Next up will be to build the road ramp that will connect Gilberton Heliport with Guilford. Subscribe to: Post Comments (Atom). The Sibley Tribute - Final Pics. The Sibley Tribute - Conclusion. Party Like Its 1959! Mount Sibley - Conclusion. Mount Sibley - Part III.