ontariowindresistance.wordpress.com
                                        
                                        Haldimand-Norfolk | Ontario Wind Resistance
                                        https://ontariowindresistance.wordpress.com/project-gallery/haldimand-norfolk
                                        Tell the MNR they have gone too far! NOT a Willing Host. Haldimand Nextera Summerhaven Project. Nextera – Haldimand. Middle tower section in place Feb. 13/13. Middle tower section being lifted in place Feb. 13/13. Haldimand Capital Power Project. Capital Power – Haldimand. Click to email (Opens in new window). Click to print (Opens in new window). Share on Facebook (Opens in new window). Click to share on Twitter (Opens in new window). Click to share on Pinterest (Opens in new window). You are commenting...
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        DWPI has “No Comment” at tribunal hearing | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/2014/12/04/dwpi-has-no-comment-at-tribunal-hearing
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. DWPI has No Comment at tribunal hearing. December 4, 2014. The panel for the preliminary hearing, held at Centre Dufferin Recreation Complex in Shelburne, included Dirk VanderBent, Vice Chair of the Environmental Review Tribunal, and Tribunal member Justin Duncan. The Tribunal is an independent body that hears public appeals under the Environm...
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        WindResistanceofMelancthon | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/author/melancthonwind
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. All posts by WindResistanceofMelancthon. January 9, 2015. Environmental Tribunal dismisses Wallace request for DWPI hearing. The Environmental Review Tribunal (ERT) has dismissed Green Party candidate Karren Wallace’s request for a hearing regarding the Amendment to REA No. 5460-98BPH8 held by Dufferin Wind Power Inc. Ms Wallace said that from...
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        The First Overseas Wind Power Projects Invested by a Chinese Power Generation Enterprise is Completed and Put into Operation | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/2014/11/22/the-first-overseas-wind-power-projects-invested-by-a-chinese-power-generation-enterprise-is-completed-and-put-into-operation
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. The First Overseas Wind Power Projects Invested by a Chinese Power Generation Enterprise is Completed and Put into Operation. November 22, 2014. Xie Changjun said in an interview with reporters that China Guodian Corporation decided to invest overseas in 2011 and chose its first project in Canada. After this project was put into operation,...
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        “Down Wind” blows a Conservative current | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/2014/11/21/down-wind-blows-a-conservative-current
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. Down Wind blows a Conservative current. November 21, 2014. Bill Hill Mayor of Melancthon Township, which hosts 167 of Dufferin County’s 200 wind turbines, agrees that the film was politically heavy BUT true. He said of the Green Energy Act, This is the most draconian piece of legislation ever introduced in my political career of 28 years. 
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        DWPI transmission poles on right–of–way | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/2014/11/21/dwpi-transmission-poles-on-right-of-way
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. DWPI transmission poles on right of way. November 21, 2014. Why are they (turbine companies) breaking the laws of Ontario just because of the Green Energy Act (GEA? Controversy continues over DWPI transmission pole installation practices along the County owned rail corridor as the REA preliminary hearing granted to Green Party Candidate Karren...
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        Appeal denied relating to Dufferin Wind’s utility pole sealing work | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/2014/12/29/appeal-denied-relating-to-dufferin-winds-utility-pole-sealing-work
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. Appeal denied relating to Dufferin Wind’s utility pole sealing work. December 29, 2014. The Ontario Environmental Review Tribunal (ERT) has dismissed an appeal centred around the remedial utility pole sealing program completed by Dufferin Wind Power Inc. along its transmission line. The Ontario Energy Board (OEB) approved Dufferin Wind’s plan ...
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        Never Give Up | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/2015/01/09/never-give-up
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. January 9, 2015. Environmental Tribunal dismisses Wallace request for DWPI hearing. The Environmental Review Tribunal (ERT) has dismissed Green Party candidate Karren Wallace’s request for a hearing regarding the Amendment to REA No. 5460-98BPH8 held by Dufferin Wind Power Inc. Ms Wallace said that from the outset the environmental review proc...
                                     
                                    
                                        
                                            
                                            windresistanceofmelancthon.wordpress.com
                                        
                                        MOE says Amaranth wind farm transformer is safe, won’t put it in writing | Wind Resistance of Melancthon
                                        https://windresistanceofmelancthon.wordpress.com/2014/12/31/moe-says-amaranth-wind-farm-transformer-is-safe-wont-put-it-in-writing
                                        Wind Resistance of Melancthon. Welcome to Turbine Township. Electromagnetic Radiation Health Issues. Application and Approval Process. Calls to Action / Petitions. MOE says Amaranth wind farm transformer is safe, won’t put it in writing. December 31, 2014. Photo by Hanno Rein for the Banner. An aerial view of Trans Alta’s Facility in Melancthon. All Amaranth resident Ted Whitworth wants for Christmas is written confirmation that the transformer station located near his home isn’t hazardous to his health. 
                                     
                         
                            
SOCIAL ENGAGEMENT