ertmsnews.com
The Netherlands commences ERTMS Pilot Program on Amsterdam-Utrecht | ERTMS News
http://www.ertmsnews.com/2013/07/07/the-netherlands-commences-ertms-pilot-program-on-amsterdam-utrecht
The world's premier ERTMS news site. The Netherlands commences ERTMS Pilot Program on Amsterdam-Utrecht. July 7, 2013. In The Netherlands, the ERTMS Pilot Program has started on May 24th of this year in an joint effort of NS, ProRail, Freight Operators and maintenance companies to gain experience on the operation of Dual Signaling. Leave a Reply Cancel reply. Your email address will not be published. Required fields are marked *. 0808 Brussels - Technical Writer (GSM-R, signaling) here.
ertmsnews.com
ADIF | ERTMS News
http://www.ertmsnews.com/tag/adif
The world's premier ERTMS news site. Santiago track layout was changed at last moment, taking out ERTMS to improve travel times. August 9, 2013. The chairman of ADIF (Gonzalo Ferre) admits before the Spanish Congressional hearing that the initial project layout of the last stretch between Ferrol and Santiago originally was designed for ERTMS. Also,…. Read Post →. ERTMS L2 on Madrid-Valencia stretch put in operation early. August 8, 2013. Read Post →. August 5, 2013. Read Post →. August 4, 2013. Engineers...
ertmsnews.com
ICE3s to start test runs under ERTMS on Amsterdam – Utrecht by mid-August | ERTMS News
http://www.ertmsnews.com/2013/08/04/ice3s-to-start-test-runs-under-ertms-on-amsterdam-utrecht-by-mid-august
The world's premier ERTMS news site. ICE3s to start test runs under ERTMS on Amsterdam – Utrecht by mid-August. August 4, 2013. In this Pilot program the ICE3s will join Bombardier’s Sprinter Light Train – especially equipped with ERTMS for this Pilot – and several cargo locomotives. Leave a Reply Cancel reply. Your email address will not be published. Required fields are marked *. 0808 Brussels - Technical Writer (GSM-R, signaling) here. ERTMS L2 on Madrid-Valencia stretch put in operation early. Powere...
hslzone.com
Laos | HSL Zone
http://www.hslzone.com/category/laos
High Speed Line news. Thailand’s high-speed train tickets ‘too expensive’. July 31, 2013. The Thai government’s ambitious plan to construct a high-speed train network in the country will be a big failure, critics claim, as ticket prices would be far too high for…. Read Post →. Funding for Laos-China Rail Link Hinges on Thai Project. July 17, 2013. Read Post →. Laos-China Railway Feasibility study commences. April 9, 2012. Read Post →. ERTMS L2 on Madrid-Valencia stretch put in operation early. The commit...
ertmsnews.com
L1 | ERTMS News
http://www.ertmsnews.com/tag/l1
The world's premier ERTMS news site. RENFE elaborates on ERTMS L1 problems with Alvia between Ourense and Santiago. July 31, 2013. President of RENFE, Julio Gómez-Pomar, elaborated on the ERTMS problems of Alvia. He says that “on the hybrid trains S730 (formerly S130) we started to install the more advanced version…. Read Post →. 0808 Brussels - Technical Writer (GSM-R, signaling) here. Santiago track layout was changed at last moment, taking out ERTMS to improve travel times. Powered by Efios Rail.
ertmsnews.com
RENFE elaborates on ERTMS L1 problems with Alvia between Ourense and Santiago | ERTMS News
http://www.ertmsnews.com/2013/07/31/renfe-ertms-problem
The world's premier ERTMS news site. RENFE elaborates on ERTMS L1 problems with Alvia between Ourense and Santiago. July 31, 2013. In the interview to El Pais, RENFE says that the plan is to have entire Madrid-Galicia line on high speed by 2018. Leave a Reply Cancel reply. Your email address will not be published. Required fields are marked *. 0808 Brussels - Technical Writer (GSM-R, signaling) here. Santiago track layout was changed at last moment, taking out ERTMS to improve travel times.
ertmsnews.com
ERTMS | ERTMS News
http://www.ertmsnews.com/tag/ertms
The world's premier ERTMS news site. Santiago track layout was changed at last moment, taking out ERTMS to improve travel times. August 9, 2013. The chairman of ADIF (Gonzalo Ferre) admits before the Spanish Congressional hearing that the initial project layout of the last stretch between Ferrol and Santiago originally was designed for ERTMS. Also,…. Read Post →. ERTMS L2 on Madrid-Valencia stretch put in operation early. August 8, 2013. Read Post →. August 6, 2013. Read Post →. August 6, 2013. Spanish M...
ertmsnews.com
Spanish government mandates a committee to study safety in Spanish Rail Sector | ERTMS News
http://www.ertmsnews.com/2013/08/05/spanish-government-mandates-a-committee-to-study-safety-in-spanish-rail-sector
The world's premier ERTMS news site. Spanish government mandates a committee to study safety in Spanish Rail Sector. August 5, 2013. It is unknown which organisations are selected for the committee. The purpose of the commission is to investigate the railway sector and establish a report within six months, including a comparison of the Spanish sector with other neighbouring countries. The report is to include an analysis of existing regulations. 8211; including ERTMS. According to the Spanish press, the ...