Santorini 26 by Metricon. Sunday, November 28, 2010. In a Whirlwind (Final Inspection). Well it is almost time for handover and the last few day have been complete craziness! In between preparing for a Garage Sale (which was advertised to start 8:00am Saturday morning but in fact in the eyes of the professional dealers started Wednesday morning) and packing I had my final walk through and inspection on Friday. The only disappointment for me is the splash back in the kitchen. Although the colour order...
kysbigadventure.blogspot.com
Ky's Big Adventure: January 2011
http://kysbigadventure.blogspot.com/2011_01_01_archive.html
Santorini 26 by Metricon. Wednesday, January 26, 2011. 8 Weeks In - Progress Report. Well it's now been 8 weeks since I took possession of the house. I would like to say that I am all unpacked and nicely settled but due to illness I have not done as much as I would have liked and still have quite a few boxes left to sort through. There are so many positives about the house however and these will always out weigh the little things I have found wrong. Having the. There are so many projects I need to get st...
kysbigadventure.blogspot.com
Ky's Big Adventure: In a Whirlwind (Final Inspection)
http://kysbigadventure.blogspot.com/2010/11/in-whirlwind-final-inspection.html
Santorini 26 by Metricon. Sunday, November 28, 2010. In a Whirlwind (Final Inspection). Well it is almost time for handover and the last few day have been complete craziness! In between preparing for a Garage Sale (which was advertised to start 8:00am Saturday morning but in fact in the eyes of the professional dealers started Wednesday morning) and packing I had my final walk through and inspection on Friday. The only disappointment for me is the splash back in the kitchen. Although the colour order...
kysbigadventure.blogspot.com
Ky's Big Adventure: August 2010
http://kysbigadventure.blogspot.com/2010_08_01_archive.html
Santorini 26 by Metricon. Wednesday, August 25, 2010. Had a call from my SS last night to say electrician had been in and completed his work and that the brick work was half done. Lock up has been moved to next week as all this rain has slowed the brickie down. The lock up carpenter is coming in on Friday to put the external doors on and he thinks lock up will be middle of next week with plaster work starting at the end of the week. Will post some photos Sunday. Links to this post. Sunday, August 22, 2010.
kysbigadventure.blogspot.com
Ky's Big Adventure: 8 Weeks In - Progress Report
http://kysbigadventure.blogspot.com/2011/01/8-weeks-in-progress-report.html
Santorini 26 by Metricon. Wednesday, January 26, 2011. 8 Weeks In - Progress Report. Well it's now been 8 weeks since I took possession of the house. I would like to say that I am all unpacked and nicely settled but due to illness I have not done as much as I would have liked and still have quite a few boxes left to sort through. There are so many positives about the house however and these will always out weigh the little things I have found wrong. Having the. There are so many projects I need to get st...
kysbigadventure.blogspot.com
Ky's Big Adventure: Another Big Adventure
http://kysbigadventure.blogspot.com/2011/02/another-big-adventure.html
Santorini 26 by Metricon. Saturday, February 5, 2011. Things seemed to be working out well for me until I got to Thompson's road which is the road my estate is on. The corner was flooded so I turned back, drove through a bit of water and then onto Glasscocks Rd. All seemed well until I got to the roundabout at William Thwaites Blvd and Mountain View Blvd. Water across one side of the road and running fast and deep. Above: Driving along Chantenay, the debris across the road are vegetables washed down from...
kysbigadventure.blogspot.com
Ky's Big Adventure: November 19th
http://kysbigadventure.blogspot.com/2010/11/november-19th.html
Santorini 26 by Metricon. Monday, November 8, 2010. Yes that's right, November 19 is set as the date for handover! Had a call from my SS today to advise that the Certificate of Occupancy has been approved, he has the painters coming in tomorrow to fix the facade and touch up around the house. His Manager will go through with him probably Wednesday and then Quality Assurance. He will then walk me through the house and my Inspector will go through on Monday. Will keep you updated. The Driveway is a product...
kysbigadventure.blogspot.com
Ky's Big Adventure: July 2010
http://kysbigadventure.blogspot.com/2010_07_01_archive.html
Santorini 26 by Metricon. Thursday, July 29, 2010. Frame Inspection - Things not looking good. Well I just received a copy of my Frame Inspection from Alex at Urban Inspections and I guess after hearing from Jay about his experience I really should not have been surprised. I guess I should think myself lucky, I only had 11 things come up on the report but it still is not good enough. My suggestion to anyone building a house no matter what builder you are with - get an independent inspection. Drawings....
kysbigadventure.blogspot.com
Ky's Big Adventure: February 2011
http://kysbigadventure.blogspot.com/2011_02_01_archive.html
Santorini 26 by Metricon. Saturday, February 5, 2011. Things seemed to be working out well for me until I got to Thompson's road which is the road my estate is on. The corner was flooded so I turned back, drove through a bit of water and then onto Glasscocks Rd. All seemed well until I got to the roundabout at William Thwaites Blvd and Mountain View Blvd. Water across one side of the road and running fast and deep. Above: Driving along Chantenay, the debris across the road are vegetables washed down from...
kysbigadventure.blogspot.com
Ky's Big Adventure: September 2010
http://kysbigadventure.blogspot.com/2010_09_01_archive.html
Santorini 26 by Metricon. Sunday, September 26, 2010. Almost Three Months Down. Well we are almost three months into the build, while things are not going as quickly as I was lead to believe I'm still happy. Dean, my new Site Supervisor took over this week. I had an introductory phone call from him giving me an update on where things were at. Cabinets would be in by Friday, plaster completed, bricks being washed and painters starting Friday. Dean hopes to have the cabinets in this week and expects the pa...