Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. In 39 degree heat! We’re still waiting on brick acid wash (I really want to see the real colour of those fantastic Canterbury bricks. And the next thing in the Burbank MyPlace Workflow checklist is “Fix Carpenter”, which I don’t really have an idea what it is. If you know what it is, please let me know. Ajanta and Ameya's Madison 27 build. Big Red's Castle (Victory 1800). Pinky and Brain's Ascent 2500 build.
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600 » Blog Archive » Plastered
http://house.georgeandmaria.net/2011/02/plastered
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. In 39 degree heat! We’re still waiting on brick acid wash (I really want to see the real colour of those fantastic Canterbury bricks. And the next thing in the Burbank MyPlace Workflow checklist is “Fix Carpenter”, which I don’t really have an idea what it is. If you know what it is, please let me know. Posted on: 02/02/2011 at 1:27pm. Posted on: 02/02/2011 at 2:21pm. G’Day Georgie,. Make surer you get your ind...
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600 » Blog Archive » Lockup
http://house.georgeandmaria.net/2011/01/lockup
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. Just a short post today, informing that we have lockup. We received the lockup invoice today in the mail. I asked my liaison about ballpark timelines and she said that fixing stage is 4-6 weeks and final stage 6-8 weeks, assuming there are no other delays. With those timelines, we would hopefully get PCI between the dates of 4th April 2011 and 2nd May 2011. Ajanta and Ameya's Madison 27 build.
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600
http://house.georgeandmaria.net/page/2
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. We received the engineer report from Burbank yesterday which addresses our issues with the slab. By adding dowels to the rear of the slab and boxing up a slab extension with a concrete pour. The job for the concreter has been uprated to urgent, and will also get the exposed steel reo fixed up on the sides and back of the slab. Once this has been done, I can go and inspect with the site supervisor. The issue wit...
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600 » Blog Archive » Another casual inspection and PCI
http://house.georgeandmaria.net/2011/03/another-casual-inspection-and-pci
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. Another casual inspection and PCI. Posted in Final Stage. Earlier this week, we had organised with Burbank a casual inspection just to see how things were going. When we arrived that Monday morning, we pleasantly discovered a beautiful house with an awesome interior. The site supervisor was on site and walked us through how things were going. Things that have been completed up until this very moment:. Seems lik...
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600 » Final Stage
http://house.georgeandmaria.net/category/final-stage
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. PCI and final inspection. Posted in Final Stage. Another casual inspection and PCI. Posted in Final Stage. Earlier this week, we had organised with Burbank a casual inspection just to see how things were going. When we arrived that Monday morning, we pleasantly discovered a beautiful house with an awesome interior. The site supervisor was on site and walked us through how things were going. Kitchen sink and plu...
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600 » Fixing
http://house.georgeandmaria.net/category/fixing
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. We had a walkthrough at the fix out stage on Monday (sorry for the long delay between then and now! And we got a good look at the house inside to see how things were progressing. It’s been going pretty well, the painters were in preparing the interior for painting and the plaster bulkhead above our kitchen cabinets were in place. The house also got a brick clean and it looks brilliant. The back toilet window.
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600 » Structure
http://house.georgeandmaria.net/category/structure
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. Maria went by the house earlier tonight and took some more happy snaps. It looks like the bricks are complete! Not long before lockup now. And spend all day at the Boxing Day sales! Slab issues fixed, roof and sisalation. A lot has happened since my last post, so this post is a little long. Things that have been addressed:. Front garage lintel bracing has been redone. The slab for the front wall between Bed 1 a...
house.georgeandmaria.net
Our Burbank Ascent 2500 / 2600 » Blog Archive » Bricks
http://house.georgeandmaria.net/2010/12/bricks
Our Burbank Ascent 2500 / 2600. Building with Burbank in Aurora Estate. Subscribe to Rss Feed. I just want to get out first that I wish everyone who has come across this blog over the Christmas break a Merry Christmas and Seasons Greetings. I know it’s a little late now, but where Christmas is situated in the week for 2010 makes timing a little off, also it doesn’t help when your birthday is also on Christmas Day (yay! And spend all day at the Boxing Day sales! Posted on: 29/12/2010 at 7:49pm.