Column grid=4 span=2] Land Subsidence. Column][column grid=4 span=2] Flooding. Column][column grid=4 span=2] Traffic Congestion. Column][column grid=4 span=2] Bad Water Quality. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015. Port of Jakarta Constructed by the End of This Month. October 21, 2015. Greater Jakarta: City, SOEs to build Port of Jakarta. September 26, 2015. LOI Signed for Jakarta’s Giant Sea Wall. September 7, 2015. June 21, 2015.
en.ncicd.com
Traffic Congestion | National Capital Integrated Coastal Development
http://en.ncicd.com/challenges-ncicd/traffic-congestion
Traffic congestion has become a grave problem in Jakarta. It had been predicted that Jakarta will experience total gridlock in 2014. More public transport, an expanded and upgraded road system and better city planning are the solutions in theory. Implementing this theory in a rapid expanding and changing city as Jakarta is not easy. The NCICD-project should provide new opportunities to alleviate the traffic congestion. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015. June 21, 2015.
en.ncicd.com
Directions for Solution | National Capital Integrated Coastal Development
http://en.ncicd.com/direct-for-solution
Column grid=4 span=2] Protection of the Coastal Area. Column][column grid=4 span=2] Sanitation and Water Supply. Column][column grid=4 span=2] Sustainable Urban Communities. Column][column grid=4 span=2] The Great Garuda. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015. Port of Jakarta Constructed by the End of This Month. October 21, 2015. Greater Jakarta: City, SOEs to build Port of Jakarta. September 26, 2015. LOI Signed for Jakarta’s Giant Sea Wall. September 7, 2015.
en.ncicd.com
Sanitation and Water Supply | National Capital Integrated Coastal Development
http://en.ncicd.com/direct-for-solution/sanitation-and-water-supply
Sanitation and Water Supply. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015. Port of Jakarta Constructed by the End of This Month. October 21, 2015. Greater Jakarta: City, SOEs to build Port of Jakarta. September 26, 2015. LOI Signed for Jakarta’s Giant Sea Wall. September 7, 2015. Netherlands, South Korea in Charge of Jakarta Sea Wall Study. June 21, 2015.
en.ncicd.com
Flooding | National Capital Integrated Coastal Development
http://en.ncicd.com/challenges-ncicd/flooding
The 10 million inhabitants of the Jakarta metropolitan area are used to flooding in the rainy season. Sedimentation and waste accumulation, combined with peak river discharges, create occasional flooding in the 13 rivers and canals flowing through the low lying urban delta. Street flooding caused by heavy rainfall is a more common event, as the city struggles to keep the urban drainage system in pace with urbanization. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015. June 21, 2015.
en.ncicd.com
NCICD History | National Capital Integrated Coastal Development
http://en.ncicd.com/ncicd/ncicd-history
Up to 2014 a Master Plan will be developed, together with an implementing organization model and an investment strategy. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015. Port of Jakarta Constructed by the End of This Month. October 21, 2015. Greater Jakarta: City, SOEs to build Port of Jakarta. September 26, 2015. LOI Signed for Jakarta’s Giant Sea Wall. September 7, 2015. Netherlands, South Korea in Charge of Jakarta Sea Wall Study. June 21, 2015.
en.ncicd.com
Partners | National Capital Integrated Coastal Development
http://en.ncicd.com/ncicd/partners
Within NCICD, many partners work together. The program is currently managed by Program Management Unit coordinated by the Indonesian Coordinating Ministry for Economic Affairs, the National Development Planning Agency (Bappenas), the Ministry of Public Works (PU), and DKI Jakarta Provincial Government. Dutch consultants involved are Royal HaskoningDHV, Witteveen and Bos, Grontmij, Rebel Group, KuiperCompagnons and Deltares. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015.
en.ncicd.com
Objectives | National Capital Integrated Coastal Development
http://en.ncicd.com/ncicd/tujuan-ncicd
The safety of 10 million inhabitants and sustainable economic development of Indonesia’s National Capital is at stake. Indonesia needs to rise to this giant challenge in order to protect the Jakarta metropolitan area against permanent flooding. Despite the huge costs, the far-reaching implications, decision makers already have committed themselves to the program and the strategy, understanding that there a no alternatives but to abandon North Jakarta. City to intensify efforts to build ‘Port of Jakarta’.
en.ncicd.com
Sustainable Urban Communities | National Capital Integrated Coastal Development
http://en.ncicd.com/direct-for-solution/sustainable-urban-communities
City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015. Port of Jakarta Constructed by the End of This Month. October 21, 2015. Greater Jakarta: City, SOEs to build Port of Jakarta. September 26, 2015. LOI Signed for Jakarta’s Giant Sea Wall. September 7, 2015. Netherlands, South Korea in Charge of Jakarta Sea Wall Study. June 21, 2015.
en.ncicd.com
The Great Garuda | National Capital Integrated Coastal Development
http://en.ncicd.com/direct-for-solution/great-garuda
The Outer Sea Wall will require investments in the range of several billions US Dollars. By integrating the sea wall with a new waterfront city (a land reclamation of 4.000 hectares) a large part of the investment costs could be recovered. However, this reclamation is in 16 meters deep water and cost recovery is a major challenge. Only a new iconic waterfront city with high quality development, would attract major investors. City to intensify efforts to build ‘Port of Jakarta’. November 2, 2015.