project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/calibration
Fail at any speed. Can has moar lulz. 201212.25 - Wideband O2 Sensor Replacement. Dec 25th, 2012 11:24 am. Replaced wideband oxygen sensor and re-calibrated LC-1. Life has been kicking me around and keeping me busy, and because of that this journal has been woefully neglected, but I felt that I needed to record this particular maintenance before I forgot. 201104.10 - MegaSquirting (Pt. 12d) O2 Sensor Heat Sink. Apr 10th, 2011 03:44 pm. Fabricated copper heat sink for LC-1 sensor.
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/innovate
Fail at any speed. Can has moar lulz. 201212.25 - Wideband O2 Sensor Replacement. Dec 25th, 2012 11:24 am. Replaced wideband oxygen sensor and re-calibrated LC-1. Life has been kicking me around and keeping me busy, and because of that this journal has been woefully neglected, but I felt that I needed to record this particular maintenance before I forgot. 201104.10 - MegaSquirting (Pt. 12d) O2 Sensor Heat Sink. Apr 10th, 2011 03:44 pm. Fabricated copper heat sink for LC-1 sensor. Jan 2nd, 2011 11:53 pm.
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/electrical
Fail at any speed. Can has moar lulz. 201204.07 - MegaSquirt Modifications. Apr 8th, 2012 02:28 am. DB37: Added (unused) wires for A/C, 5v ref (for TPS), fuel pump, idle. DB37: Added wire for launch control on pin 29. MS1v3: Switched launch control input from SPR3 (pin 5) to IAC2A (pin 29). DB37: Added wire for EGT logging on pin 6. MS1v3: Jumpered SPR4 (pin 6) to JS4 for EGT logging. Figured I'd better record this before I forget. 201110.29 - Replaced Ignition Switch. Oct 29th, 2011 10:09 am. I've been ...
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/solder
Fail at any speed. Can has moar lulz. 201204.07 - MegaSquirt Modifications. Apr 8th, 2012 02:28 am. DB37: Added (unused) wires for A/C, 5v ref (for TPS), fuel pump, idle. DB37: Added wire for launch control on pin 29. MS1v3: Switched launch control input from SPR3 (pin 5) to IAC2A (pin 29). DB37: Added wire for EGT logging on pin 6. MS1v3: Jumpered SPR4 (pin 6) to JS4 for EGT logging. Figured I'd better record this before I forget. 201110.24 - Gauge Cluster Experiment Project, Pt. 3. 3168 - Resistors, al...
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/oxygen%20sensor
Fail at any speed. Can has moar lulz. 201212.25 - Wideband O2 Sensor Replacement. Dec 25th, 2012 11:24 am. Replaced wideband oxygen sensor and re-calibrated LC-1. Life has been kicking me around and keeping me busy, and because of that this journal has been woefully neglected, but I felt that I needed to record this particular maintenance before I forgot. 201101.08 - Radiator Air Guide, HO2S Resistor, Fender Bolt. Jan 8th, 2011 03:11 pm. Fabricated a new radiator air guide from 1/16" thick ABS sheet.
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/megasquirt
Fail at any speed. Can has moar lulz. 201204.07 - MegaSquirt Modifications. Apr 8th, 2012 02:28 am. DB37: Added (unused) wires for A/C, 5v ref (for TPS), fuel pump, idle. DB37: Added wire for launch control on pin 29. MS1v3: Switched launch control input from SPR3 (pin 5) to IAC2A (pin 29). DB37: Added wire for EGT logging on pin 6. MS1v3: Jumpered SPR4 (pin 6) to JS4 for EGT logging. Figured I'd better record this before I forget. 201111.23 - More Megasquirting. Nov 23rd, 2011 04:35 pm. Tweaked over run...
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/lc-1
Fail at any speed. Can has moar lulz. 201212.25 - Wideband O2 Sensor Replacement. Dec 25th, 2012 11:24 am. Replaced wideband oxygen sensor and re-calibrated LC-1. Life has been kicking me around and keeping me busy, and because of that this journal has been woefully neglected, but I felt that I needed to record this particular maintenance before I forgot. 201104.10 - MegaSquirting (Pt. 12d) O2 Sensor Heat Sink. Apr 10th, 2011 03:44 pm. Fabricated copper heat sink for LC-1 sensor. Jan 8th, 2011 03:11 pm.
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/wire
Fail at any speed. Can has moar lulz. 201204.07 - MegaSquirt Modifications. Apr 8th, 2012 02:28 am. DB37: Added (unused) wires for A/C, 5v ref (for TPS), fuel pump, idle. DB37: Added wire for launch control on pin 29. MS1v3: Switched launch control input from SPR3 (pin 5) to IAC2A (pin 29). DB37: Added wire for EGT logging on pin 6. MS1v3: Jumpered SPR4 (pin 6) to JS4 for EGT logging. Figured I'd better record this before I forget. 201102.05 - Gauges, Needles, Passenger Airbag, LED Lighting. Reinstalled ...
project-fail.livejournal.com
project_fail
http://project-fail.livejournal.com/tag/wiring
Fail at any speed. Can has moar lulz. 201204.07 - MegaSquirt Modifications. Apr 8th, 2012 02:28 am. DB37: Added (unused) wires for A/C, 5v ref (for TPS), fuel pump, idle. DB37: Added wire for launch control on pin 29. MS1v3: Switched launch control input from SPR3 (pin 5) to IAC2A (pin 29). DB37: Added wire for EGT logging on pin 6. MS1v3: Jumpered SPR4 (pin 6) to JS4 for EGT logging. Figured I'd better record this before I forget. 201109.27 - Steering Wheel Airbag Defeat (Repair). Sep 27th, 2011 07:14 pm.