dash-internship.blogspot.com
Aku, Internship, Blogging: Basic Shortcut For Autocad
http://dash-internship.blogspot.com/2010/04/basic-shortcut-for-autocad.html
Aku, Internship, Blogging. Orang yg paling berkuasa adalah orang yg dapat menguasai dirinya sendiri. TEPUK DADA TANYA IMAN. View my complete profile. Basic Shortcut For Autocad. Salam and hi There. Ive been wondering is it hard to learn Auto CAD? For me as long as you know the shortcut, then all the problem will be solve. Just like Adobe Photoshop, it is easy when youre already know the shortcut becoz it makes our life easier. Now I would like to talk about Auto Cad. 1 l - line. 2 c - circle. 3 co - copy.
muaz-diyana.blogspot.com
MDiYaNa's INTERNSHIP: WeeK 4 (26th~30th April 2010)
http://muaz-diyana.blogspot.com/2010/06/week-4-26th30th-april-2010.html
Work Hard to Learn Much. Friday, April 30, 2010. WeeK 4 (26th 30th April 2010). As usually, my routine is to do the report formatting. To day I need to formatting for:. Client: TNB Distribution KL Pusat. Date of Inspection: 22. No of Reports: 13 (for each substation). PE 11kV/415V Merdeka Villa Blok 1B Jln Merdeka. PE 11kV/415V Merdeka Villa Blok 2C Jln Merdeka. PE 11kV/415V Merdeka Villa Blok 3 Jln Merdeka. PE 11kV/415V Industri Ringan Jln Merdeka No. 1. PE 11kV/415V Avenue Ampang 2 Jln Ikan Emas. Repor...
saiha-yo.blogspot.com
Ahlan Wasahlan...: 2nd Week - 4th Week
http://saiha-yo.blogspot.com/2010/04/2nd-week.html
Sunday, April 18, 2010. 2nd Week - 4th Week. Went to pmu(Pencawang Masuk Utama) parit raja with En Arman (engineer under protection unit).The objective is to see how commissioning is done to a new transformer. There were some procedures need to follow before doing commissioning :. 1) Have a meeting with team project. 2) Get approval from NLDC and get a value for outage voltage. This is a CVT (Capacitive Voltage Transformer). As u all can see, the connection for cvt is looks like T alphabet. The f...This ...
saiha-yo.blogspot.com
Ahlan Wasahlan...: Internship Program in April
http://saiha-yo.blogspot.com/2010/04/internship-program-in-april.html
Thursday, April 1, 2010. Internship Program in April. Place: TNBT (AM) Kluang.Johor. Subscribe to: Post Comments (Atom). View my complete profile. 2nd Week - 4th Week. 1st week (5/4 - 9/4). Internship Program in April. My Blog List (UNITEN). 7 Tips Berkesan Melupakan Orang Yang Kita Sayang Dalam Tempoh Singkat. Duduk Antara Dua Sujud. Week 9 ( 31 May - 4 June). LI = Internship = practical = training.
saiha-yo.blogspot.com
Ahlan Wasahlan...: 1st week (5/4 - 9/4)
http://saiha-yo.blogspot.com/2010/04/1st-week-54-94.html
Tuesday, April 13, 2010. 1st week (5/4 - 9/4). Hari ni mula lapor diri.Datang awal giler. 7.30 dah terpacak kat office TNB ni. Biase la hari 1st kn.:). Masuk-masuk je. pak guard dah pndang semacam je. Kacak sgt aku ni agaknye.Masuk-masuk je. terus berjumpa dengan kak N (Syarifah Aini) and blajar macam mane nak punch card.Then aku duduk dulu.Tiba2 ade 2 pompuan datang kat aku tanye, abang, nak lapor diri kat mane? Hari ni jumpa ngan Bos(pengurus pencawang) orang paling tinggi la pangkatnye kat sini, En Mu...
saiha-yo.blogspot.com
Ahlan Wasahlan...: Summary for May
http://saiha-yo.blogspot.com/2010/06/summary-for-may.html
Thursday, June 3, 2010. Subscribe to: Post Comments (Atom). View my complete profile. My Blog List (UNITEN). 7 Tips Berkesan Melupakan Orang Yang Kita Sayang Dalam Tempoh Singkat. Duduk Antara Dua Sujud. Week 9 ( 31 May - 4 June). LI = Internship = practical = training.
wanwa23r.blogspot.com
Aku & Internship?: Generators Battery Inspection
http://wanwa23r.blogspot.com/2010/05/generators-battery-inspection.html
Saturday, May 29, 2010. GT3 ,GT4 DAN GT5 batteries. Then. We also inspected battery at Black Start Diesel Generator (BSDG) and. Adminstartion building. The main function of. The batteries is to give energy source when occurence of blackout. That batteries can generate until. Battery water = 1.16 SG. Voltage across between battery = 1.3V 1.5V. Any questions or request juz email me at wanwa23r@gmail.com. View my complete profile. Download your Movies n your stuff here! Wa23r ] Deviate Form The Norm.
wanwa23r.blogspot.com
Aku & Internship?: April 2010
http://wanwa23r.blogspot.com/2010_04_01_archive.html
Sunday, April 25, 2010. 19 April 2010 23 April 2010 ]. 19 April 2010 and 20 April 2010. Followed Mr Narasid and Mr. Amar do some checking and troubleshoot at store next to Central Control Room to identify which lamp damaged since all the lamp there not working. The checking only take about half an hour and we found the damage lamp. After that we went to CCR to take 'petunjuk' to read the SAG single line diagram. The programme end at 12 p.m. After had our lunch, Mr. Reeza (Electrical engineer) see us ...