sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: June 2016
http://sunsetbridgeasburypark.blogspot.com/2016_06_01_archive.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Monday, June 13, 2016. Work on the bridge still continues. The work is done underneath the bridge. Orange fencing has been placed around Bridge Ave and Sunset Ave where minor works - like the fencing- needs to get done. Sunday, June 5, 2016. Week May 30-June 3. Subscribe to: Posts (Atom). Who's doing the work? Daily updates of the Sunset Bridge Construction Project. Week May 30-June 3. Be altered in any way. With a hyperlink back to my site,.
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: Week May 30-June 3
http://sunsetbridgeasburypark.blogspot.com/2016/06/week-may-30-june-3.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Sunday, June 5, 2016. Week May 30-June 3. The bridge opened and the work still continues. The construction walk way on the outside of the beams had to be removed. The holes were filled and sanded. Along the new bulkhead, the base of the fence was poured. Just an fyi, there used to be 2 porte-potties, now there is only one. So the crew is significantly smaller. Subscribe to: Post Comments (Atom). Who's doing the work? Week May 30-June 3.
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: April 2016
http://sunsetbridgeasburypark.blogspot.com/2016_04_01_archive.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Friday, April 29, 2016. In this first photo, you can see the concrete pour on the east railings (red). On the west railings, the spaces have been opened and cleaned. (blue). The bridge railings work has picked up in pace. A Saturday crew was here. The crew has found their rhythm. Two sections of railings are poured. Then two sections are removed and opened. Here are the pieces of sidewalk. The wooden forms have been taken off. Thursday, April 21, 2016.
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: May 2016
http://sunsetbridgeasburypark.blogspot.com/2016_05_01_archive.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Sunday, May 29, 2016. May 27- THE BRIDGE OPENS! Lucky for me the bridge opened on Friday, May 27 and my flight from Guatemala came in around midnight the on May 26. It was tough getting up early to see the crowds assembling at 8 am with only 5 hours sleep but it was worth it! People from Ocean, Asbury Park, politicians and the crew were all here to see the bridge open to traffic. As promised, the bridge opened ON TIME! Subscribe to: Posts (Atom). Please...
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: September 2015
http://sunsetbridgeasburypark.blogspot.com/2015_09_01_archive.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Wednesday, September 30, 2015. This is the Asbury Park side. There was a pour today of the abutment area. The other area on this side was cleared really well. With the predicted rain and possible tropical storm coming, various pieces of equipment and supplies were well covered. The newly poured concrete has always been protected - but this extra covering on the supplies is insurance against the heavy rains coming our way. Tuesday, September 29, 2015.
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: March 2016
http://sunsetbridgeasburypark.blogspot.com/2016_03_01_archive.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Tuesday, March 29, 2016. The retaining wall pilings were placed in ground today. Another pour today, some work on the mechanical piece of the crane. Here's a look at the new pilings and sidewalk. Sidewalks were poured. Sidewalks were constructed. A new crane appeared to put in the pilings for the retaining wall on the Asbury Park side. This pilings are black and flank the wing walls. Sunday, March 20, 2016. March 18- video included. Who's doing the work?
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: October 2015
http://sunsetbridgeasburypark.blogspot.com/2015_10_01_archive.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Tuesday, October 27, 2015. The work on the beams continues. The metal structures that fit in between the beams have been placed on top of the wood platforms. The wing wall has been marked for its pilings. This was a test beam that put in a couple of months ago when the piers were being created. All those orange crosses will be pilings. Thursday, October 22, 2015. The abutment on the Wanamassa side grows higher. The work on the bridge is done inside the ...
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: May 27- THE BRIDGE OPENS!
http://sunsetbridgeasburypark.blogspot.com/2016/05/may-27-bridge-opens.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Sunday, May 29, 2016. May 27- THE BRIDGE OPENS! Lucky for me the bridge opened on Friday, May 27 and my flight from Guatemala came in around midnight the on May 26. It was tough getting up early to see the crowds assembling at 8 am with only 5 hours sleep but it was worth it! People from Ocean, Asbury Park, politicians and the crew were all here to see the bridge open to traffic. As promised, the bridge opened ON TIME! Subscribe to: Post Comments (Atom).
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: May 2015
http://sunsetbridgeasburypark.blogspot.com/2015_05_01_archive.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Friday, May 29, 2015. More pilings were put into place in the second cofferdam. Throughout the day, the first cofferdam had work completed on it. The crew inspects the first cofferdam. Later in the day, there was welding. Also, dirt and gravel were placed in the first cofferdam. By mid day, the first cofferdam was completed. The large 100 ton crane turned to the left and faced the second the cofferdam. Wednesday, May 27, 2015. Tuesday, May 26, 2015.
sunsetbridgeasburypark.blogspot.com
Sunset Bridge, Asbury Park, NJ: May 16-23
http://sunsetbridgeasburypark.blogspot.com/2016/05/may-16-23.html
Sunset Bridge, Asbury Park, NJ. Sunset Ave. Bridge. Sunday, May 29, 2016. While I was away on a residency to Guatemala, my husband Peter took this photos for me of the bridge. Here's a great guy and a hard working man - Arty telling me that the bridge will be paved this week and spend by next week. Here are the paving photos from Peter's iPhone. The sidewalks are all complete and the "black top" will go one. Subscribe to: Post Comments (Atom). Who's doing the work? May 27- THE BRIDGE OPENS!