transformerjct.blogspot.com
Transformer Junction - an americaN Module
http://transformerjct.blogspot.com/2009/09/2009-09-16-interchangeteamtracks-was.html
Transformer Junction - an americaN Module. Wednesday, September 16, 2009. The interchange/teamtracks was laid today, so now are all track laid. The interchange/teamtracks has a lower elevation than the mainline. Subscribe to: Post Comments (Atom). 2009-09-20:Today the module was moved to another . 2009-09-19: The wireing for section1 is done aswe. 2009-09-18:Done with the wirening of section2. . 2009-09-16: The interchange/teamtracks was laid t. 2009-09-15: Went and bought 3 Conrad turnout motor.
transformerjct.blogspot.com
Transformer Junction - an americaN Module
http://transformerjct.blogspot.com/2009/09/2009-09-12-name-of-this-module-comes.html
Transformer Junction - an americaN Module. Sunday, September 13, 2009. The name of this module comes from that it has had an earlier life as a On30 module (narrow guage in 1:48 in H0 track). As to few around me were building On30 modules, I stripped the module of track and it was ready to be converted (transformed) to an americaN module. The new module will be a were two lines crosses in 90 degree angle. There will also be a connection track between the lines. Two new legs was made aswell. View my comple...
transformerjct.blogspot.com
Transformer Junction - an americaN Module
http://transformerjct.blogspot.com/2009/09/2009-09-13-roadbed-rubbercork-for-main.html
Transformer Junction - an americaN Module. Sunday, September 13, 2009. The roadbed (rubbercork) for the main track was cut and glued in place. The work with laying the track then begun. The diamond, two turnouts and the connection track between them is in place. Subscribe to: Post Comments (Atom). 2009-09-20:Today the module was moved to another . 2009-09-19: The wireing for section1 is done aswe. 2009-09-18:Done with the wirening of section2. . 2009-09-16: The interchange/teamtracks was laid t.
transformerjct.blogspot.com
Transformer Junction - an americaN Module: November 2009
http://transformerjct.blogspot.com/2009_11_01_archive.html
Transformer Junction - an americaN Module. Friday, November 27, 2009. After a period no activity, the work on the module is continuing. The sides of section 1 has been painted in the americaN color. The track of section 1 has been painted aswell. Subscribe to: Posts (Atom). 2009-11-27:After a period no activity, the work . View my complete profile.
youngburg.blogspot.com
Youngburg americaN module: juli 2009
http://youngburg.blogspot.com/2009_07_01_archive.html
Måndag 27 juli 2009. Setup all the modules and check how the sceenery looked together. Found an electrical problem in one turnout: one little section of track had lost power. Solved it by solder a connection between the rail and the connection strip that was suppose to feed the rail. One pointrail became lose during that operation. I might have to replace the whole turnout. Nothing I want to do. On section 1 I added asphalt (abbrasive paper) for the runways and turf where scenery was missing. The work wi...
youngburg.blogspot.com
Youngburg americaN module
http://youngburg.blogspot.com/2009/07/2009-07-24-time-to-continue-with.html
Lördag 25 juli 2009. Time to continue with section 2 again. Sand and turf added to areas missing landscape. A bumper has been added at the end of the teamtrack. The industrial tracks has got some ballast, but not all of the tracks are done. Prenumerera på: Kommentarer till inlägget (Atom). Mainstreet - a streetrunning americaN module. Micke C's Crawford Junction. Modul Syd homepage (in swedish). Per Eklund's Pinehill railroad. Transformer Junction americaN module. Gadgeten innehöll ett fel. 2009-02-13: F...
youngburg.blogspot.com
Youngburg americaN module
http://youngburg.blogspot.com/2009/07/2009-07-27-setup-all-modules-and-check.html
Måndag 27 juli 2009. Setup all the modules and check how the sceenery looked together. Found an electrical problem in one turnout: one little section of track had lost power. Solved it by solder a connection between the rail and the connection strip that was suppose to feed the rail. One pointrail became lose during that operation. I might have to replace the whole turnout. Nothing I want to do. Prenumerera på: Kommentarer till inlägget (Atom). Mainstreet - a streetrunning americaN module. 2009-03-08: Al...
youngburg.blogspot.com
Youngburg americaN module
http://youngburg.blogspot.com/2009/07/2009-07-25-ballasting-completed-on-all.html
Lördag 25 juli 2009. Ballasting completed on all tracks on section 2. Some minor additions remains before the module can be assembled again in order to attach the road that crosses the from section 2 to section 1 so the road becomes alligned when crossing from one section to the next. Prenumerera på: Kommentarer till inlägget (Atom). Mainstreet - a streetrunning americaN module. Micke C's Crawford Junction. Modul Syd homepage (in swedish). Per Eklund's Pinehill railroad. Gadgeten innehöll ett fel. 2009-0...
transformerjct.blogspot.com
Transformer Junction - an americaN Module
http://transformerjct.blogspot.com/2009/09/2009-09-18-done-with-wirening-of.html
Transformer Junction - an americaN Module. Friday, September 18, 2009. Done with the wirening of section2. Attached the turnout control switches to the side of the section, in a hole so they don't get damaged during transport. Subscribe to: Post Comments (Atom). 2009-09-20:Today the module was moved to another . 2009-09-19: The wireing for section1 is done aswe. 2009-09-18:Done with the wirening of section2. . 2009-09-16: The interchange/teamtracks was laid t. 2009-09-13:The roadbed (rubbercork) for .
transformerjct.blogspot.com
Transformer Junction - an americaN Module: September 2009
http://transformerjct.blogspot.com/2009_09_01_archive.html
Transformer Junction - an americaN Module. Sunday, September 20, 2009. Today the module was moved to another location in my appartment were it could be connected to other modules and be tested with real trains. That went very well. Saturday, September 19, 2009. The wireing for section1 is done aswell. The whole module is testrun, see videoclip. http:/ www.youtube.com/watch? There seams to be some problems with the last Conrad turnoutmotor. Might need to replace it. Friday, September 18, 2009. The name of...