matthias-kayak2.blogspot.com matthias-kayak2.blogspot.com

matthias-kayak2.blogspot.com

Inner city SoF Kayaks

Inner city SoF Kayaks. Wednesday, 16 November 2011. I got started on the Keel and chines late monday evening, and finished them up last night. I decided to try nailing them on, mostly just to try something different, and I thought it would be faster than lashing. It turned out to be a lot slower than lashing, and I had to put at least two nails at different angles into every rib/chine junction, and in the end I still had to lash the ends where the pressure was too much for the nails to hold. I spent 4 ho...

http://matthias-kayak2.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR MATTHIAS-KAYAK2.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

November

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Monday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 3.9 out of 5 with 11 reviews
5 star
7
4 star
0
3 star
2
2 star
0
1 star
2

Hey there! Start your review of matthias-kayak2.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.3 seconds

FAVICON PREVIEW

  • matthias-kayak2.blogspot.com

    16x16

  • matthias-kayak2.blogspot.com

    32x32

  • matthias-kayak2.blogspot.com

    64x64

  • matthias-kayak2.blogspot.com

    128x128

CONTACTS AT MATTHIAS-KAYAK2.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Inner city SoF Kayaks | matthias-kayak2.blogspot.com Reviews
<META>
DESCRIPTION
Inner city SoF Kayaks. Wednesday, 16 November 2011. I got started on the Keel and chines late monday evening, and finished them up last night. I decided to try nailing them on, mostly just to try something different, and I thought it would be faster than lashing. It turned out to be a lot slower than lashing, and I had to put at least two nails at different angles into every rib/chine junction, and in the end I still had to lash the ends where the pressure was too much for the nails to hold. I spent 4 ho...
<META>
KEYWORDS
1 pages
2 stats
3 greenland kayak 1
4 greenland kayak 2
5 posted by
6 matthias
7 no comments
8 email this
9 blogthis
10 share to twitter
CONTENT
Page content here
KEYWORDS ON
PAGE
pages,stats,greenland kayak 1,greenland kayak 2,posted by,matthias,no comments,email this,blogthis,share to twitter,share to facebook,share to pinterest,moved in,about me,blog archive,october,followers,powered by blogger
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Inner city SoF Kayaks | matthias-kayak2.blogspot.com Reviews

https://matthias-kayak2.blogspot.com

Inner city SoF Kayaks. Wednesday, 16 November 2011. I got started on the Keel and chines late monday evening, and finished them up last night. I decided to try nailing them on, mostly just to try something different, and I thought it would be faster than lashing. It turned out to be a lot slower than lashing, and I had to put at least two nails at different angles into every rib/chine junction, and in the end I still had to lash the ends where the pressure was too much for the nails to hold. I spent 4 ho...

INTERNAL PAGES

matthias-kayak2.blogspot.com matthias-kayak2.blogspot.com
1

Inner city SoF Kayaks: November 2011

http://www.matthias-kayak2.blogspot.com/2011_11_01_archive.html

Inner city SoF Kayaks. Wednesday, 16 November 2011. I got started on the Keel and chines late monday evening, and finished them up last night. I decided to try nailing them on, mostly just to try something different, and I thought it would be faster than lashing. It turned out to be a lot slower than lashing, and I had to put at least two nails at different angles into every rib/chine junction, and in the end I still had to lash the ends where the pressure was too much for the nails to hold. I spent 4 ho...

2

Inner city SoF Kayaks: Day 1

http://www.matthias-kayak2.blogspot.com/2011/10/were-moving-to-malmo-next-weekend-and.html

Inner city SoF Kayaks. Sunday, 30 October 2011. We're moving to Malmö next weekend, and we're going to live about 1 KM from the canals, which of course means I want a kayak we can fit into our storage space! So I figured I should be able to fit a 3 meter kayak in, the space is easily big enough, the issue will be getting it through the door, but 3m should be manageable. As usual, every kayak starts with shopping for lumber. And then comes ripping the planks down to the relevant width. And that's it for t...

3

Inner city SoF Kayaks: Stats

http://www.matthias-kayak2.blogspot.com/p/stats.html

Inner city SoF Kayaks. Day 1: 4 hours. Ripped gunwales, chines etc, fitted and attached straight deck beams for both kayaks. Day 2: 7 hours. Made rib mortices 4 hours. Cut and bent ribs 3 hours. Day 3: 5 hours. Attached keel/chines: 3 hours. Attached skeg: 1 hour. Drew up the shape of stemplates and deck beam: 1 hour. Wood: 400 Swedish crowns 40 Euro. Skin: 100 swedish crowns 10 Euro. Subscribe to: Posts (Atom). View my complete profile. I got started on the Keel and chines late monday e.

4

Inner city SoF Kayaks

http://www.matthias-kayak2.blogspot.com/2011/11/i-got-started-on-keel-and-chines-late.html

Inner city SoF Kayaks. Wednesday, 16 November 2011. I got started on the Keel and chines late monday evening, and finished them up last night. I decided to try nailing them on, mostly just to try something different, and I thought it would be faster than lashing. It turned out to be a lot slower than lashing, and I had to put at least two nails at different angles into every rib/chine junction, and in the end I still had to lash the ends where the pressure was too much for the nails to hold.

5

Inner city SoF Kayaks: October 2011

http://www.matthias-kayak2.blogspot.com/2011_10_01_archive.html

Inner city SoF Kayaks. Sunday, 30 October 2011. We're moving to Malmö next weekend, and we're going to live about 1 KM from the canals, which of course means I want a kayak we can fit into our storage space! So I figured I should be able to fit a 3 meter kayak in, the space is easily big enough, the issue will be getting it through the door, but 3m should be manageable. As usual, every kayak starts with shopping for lumber. And then comes ripping the planks down to the relevant width. And that's it for t...

UPGRADE TO PREMIUM TO VIEW 1 MORE

TOTAL PAGES IN THIS WEBSITE

6

LINKS TO THIS WEBSITE

emma-kayak.blogspot.com emma-kayak.blogspot.com

Greenland Kayak Mk II: Stats

http://emma-kayak.blogspot.com/p/stats.html

Greenland Kayak Mk II. Wood: 650 Swedish crowns/65 euro. Skin: 40 euro (got a good discount from www.groenlaender.de because he accidentally sent me a skin that was a bit short for my previous project.). Varnish/Paint: 450 Swedish crowns/45 Euro. Total: 1500 Swedish crowns/150 euro. Day 1: 7 Hours. Gunwales shaped and marked, rib mortises cut, forms fitted. (2 hours of it was catching up when the bad gunwale broke). Day 2: 3 Hours. Deck beams cut and fitted. Ribs bent and fitted. Day 3: 3½ Hours.

emma-kayak.blogspot.com emma-kayak.blogspot.com

Greenland Kayak Mk II: July 2011

http://emma-kayak.blogspot.com/2011_07_01_archive.html

Greenland Kayak Mk II. Sunday, 10 July 2011. As planned, I gave the kayak to my girlfriend as a birthday present, and I'd say it all went well. Of course it also came with a paddle, and a pair of wetsuit gloves (I got blisters from my paddle the first time I paddled so I figured better to wear gloves.). It's a bit hard to see in this picture, but the kayak weighs just over 10 KG, which I count as a success as she needs to be able to carry it. :P. Which she did, down to the beach! Tuesday, 5 July 2011.

emma-kayak.blogspot.com emma-kayak.blogspot.com

Greenland Kayak Mk II: June 2011

http://emma-kayak.blogspot.com/2011_06_01_archive.html

Greenland Kayak Mk II. Thursday, 30 June 2011. Apparently blogger.com crashed and killed my post. :. Anyways, I went out again yesterday. After a false start because I'm lazy when it comes to measuring I got the stemplates cut out, and got the keel lashed on without any trouble. The chines gave me a little bit of trouble as they simply wouldn't bend enough, so in the end I cut some new one's that were a bit thinner and got them lashed on. So more or less done with the frame now. Tuesday, 28 June 2011.

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak: Frame Finished!

http://matthias-kayak.blogspot.com/2011/04/frame-finished.html

Building a greenland kayak. Wednesday, 13 April 2011. I went out last night and put on the forward deck stringer, which means the frame is officially finished. Work still needing to be done:. Oiling the frame (possibly twice). Bending the coaming (the ring that will be around my waist). Sewing on the skin. Painting the skin to waterproof it. I will upload some pictures of the finished frame next friday when i go out to oil it. Subscribe to: Post Comments (Atom). View my complete profile. Why a sea kayak?

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak: Finished

http://matthias-kayak.blogspot.com/2011/05/finished.html

Building a greenland kayak. Friday, 20 May 2011. Well, i did actually finish it and paddle it two weeks ago, but completely forgot to post it here. The finished boat weighs 17 kg, which is a fair bit more than i expected, but considering that it's mostly made out of pine, and i think the boat varnish i used was fairly heavy too, it's not really unexpected. So, i carried it down to the water (5 minute walk). And got in (notice the wetsuit, i knew what i was getting into :P. View my complete profile. Trave...

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak: pictures!

http://matthias-kayak.blogspot.com/2011/04/pictures.html

Building a greenland kayak. Tuesday, 26 April 2011. Ok, went a while without access to a camera there, but now i finally managed it. :P. I made the coaming, with a flange all the way around:. It doesn't look too good in the back, but I'll smooth it over when i finish it, i had to put an extra piece of wood on there to hold it together that I'm planning on removing when i stich it together. And i think the masik is strong enough even though i cut it out of a straight piece instead of the curved one:.

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak: Finished - Officially.

http://matthias-kayak.blogspot.com/2011/06/finished-officially.html

Building a greenland kayak. Sunday, 19 June 2011. Check out my next project: http:/ emma-kayak.blogspot.com/. Well, i've made the Deck lines now, and checked over the paint job properly. so now the kayak is officially finished! Subscribe to: Post Comments (Atom). View my complete profile. Related SoF Kayak links. Cunninghams book at google books. Why a sea kayak? Another swedish SoF build. Yet another SoF build. Greenland paddle video and pdf. Travel template. Template images by MichaelJay.

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak: Paddling

http://matthias-kayak.blogspot.com/2011/06/paddling.html

Building a greenland kayak. Sunday, 12 June 2011. Two months since I finished it, I finally had time to go out for another paddle. This time it felt a lot better than last time. The waterline is around the bottom of the gunwhales at the seat, and while it is fairly unstable, it is possible to balance. :P. I'll still paint it, and make deck lines, somewhere down the line, but next weekend I'm planning on going shopping for wood for my gf's kayak. :D. Subscribe to: Post Comments (Atom). Why a sea kayak?

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak: June 2011

http://matthias-kayak.blogspot.com/2011_06_01_archive.html

Building a greenland kayak. Sunday, 19 June 2011. Check out my next project: http:/ emma-kayak.blogspot.com/. Well, i've made the Deck lines now, and checked over the paint job properly. so now the kayak is officially finished! Sunday, 12 June 2011. Two months since I finished it, I finally had time to go out for another paddle. I'll still paint it, and make deck lines, somewhere down the line, but next weekend I'm planning on going shopping for wood for my gf's kayak. :D. Subscribe to: Posts (Atom).

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak: February 2011

http://matthias-kayak.blogspot.com/2011_02_01_archive.html

Building a greenland kayak. Wednesday, 23 February 2011. I'm planning to build a skin-on-frame sea kayak, inspired by the greenland style. I've ordered chris cunninghams book (forgot the name of it, but i'll post it when i get it after this weekend). I'll most likely start by making a paddle, and then i'll make a "test kayak" with willow shoots and a tarp. ( 4 hour kayak. The test one is mostly to have something to play with while building though. Subscribe to: Posts (Atom). View my complete profile.

UPGRADE TO PREMIUM TO VIEW 14 MORE

TOTAL LINKS TO THIS WEBSITE

24

OTHER SITES

matthias-kaufmann.com matthias-kaufmann.com

coming soon

matthias-kaul.com matthias-kaul.com

>> Official Homepage - Matthias Kaul >>

matthias-kaul.de matthias-kaul.de

Willkommen bei Bettina und Matthias Kaul

Homepage, webseite, internetseite, webdokument, homepage webseite internetseite webdokument.

matthias-kay50.skyrock.com matthias-kay50.skyrock.com

Blog de matthias-kay50 - Blog de matthias-kay50 - Skyrock.com

Mot de passe :. J'ai oublié mon mot de passe. Mise à jour :. Abonne-toi à mon blog! N'oublie pas que les propos injurieux, racistes, etc. sont interdits par les conditions générales d'utilisation de Skyrock et que tu peux être identifié par ton adresse internet (54.145.69.42) si quelqu'un porte plainte. Ou poster avec :. Retape dans le champ ci-dessous la suite de chiffres et de lettres qui apparaissent dans le cadre ci-contre. Posté le vendredi 12 février 2010 13:21. Ou poster avec :. Ou poster avec :.

matthias-kayak.blogspot.com matthias-kayak.blogspot.com

building a greenland kayak

Building a greenland kayak. Sunday, 19 June 2011. Check out my next project: http:/ emma-kayak.blogspot.com/. Well, i've made the Deck lines now, and checked over the paint job properly. so now the kayak is officially finished! Sunday, 12 June 2011. Two months since I finished it, I finally had time to go out for another paddle. I'll still paint it, and make deck lines, somewhere down the line, but next weekend I'm planning on going shopping for wood for my gf's kayak. :D. Friday, 20 May 2011. Unfortunat...

matthias-kayak2.blogspot.com matthias-kayak2.blogspot.com

Inner city SoF Kayaks

Inner city SoF Kayaks. Wednesday, 16 November 2011. I got started on the Keel and chines late monday evening, and finished them up last night. I decided to try nailing them on, mostly just to try something different, and I thought it would be faster than lashing. It turned out to be a lot slower than lashing, and I had to put at least two nails at different angles into every rib/chine junction, and in the end I still had to lash the ends where the pressure was too much for the nails to hold. I spent 4 ho...

matthias-kaye.de matthias-kaye.de

Home

Der Gitarrist und Sänger Matthias Kaye. Herzlich willkommen auf meiner Internetseite! Informieren Sie sich hier über meine verschiedenen musikalischen Programme, die Sie für Ihre Veranstaltung buchen können. Auf jeder Seite finden Sie Audio- und Videobeispiele, Pressestimmen und Referenzen. TON ART – Konzert, Show & Unterhaltung. Ambra – Latino-Pop und Flamenco. Kama Gitarra – Livemusik vom Feinsten. Zwei wie wir – Komödie. Angela Klee – Woodstockfeeling. Der Gitarrist und Sänger Matthias Kaye.

matthias-keck.de matthias-keck.de

SEO Optimierung & Online Marketing | Matthias Keck

49 (0)175 777 777 9. Bei Ihrem Spezialist für Online Marketing and Suchmaschinenoptimierung. Sehr geehrter Besucher,. Hier sind Sie richtig, wenn Sie Hilfe zur Optimierung Ihrer Internetseite, oder Ihres Online-Startups benötigen. Ich berate Sie fachkompetent zu den Themen SEO Optimierung. Und helfe bei der Steigerung Ihrer Umsätze durch gezielte Online Marketing Maßnahmen. Nehmen Sie sich die Zeit und schauen Sie sich ein wenig auf meiner Internetpr&aumlsenz um. 49 (0)175 777 777 9. 2003 - 2018 -.

matthias-kegel.de matthias-kegel.de

Schmierfink | Matze´s Blog

Zum sekundären Inhalt wechseln. BVB CL Abflug nach Madrid am 01.04.2014. Meinen heutigen Urlaubstag habe ich dazu genutzt unseren BVB-Jungs am Flughafen für morgen einen erfolgreichen CL-Abend zu wünschen. Zufällig hatte ich meine Kamera dabei. Besuch im Dortmunder Zoo. Besuch im Dortmunder Zoo (youtube). Ich werde jetzt meine Ente zu Wasser lassen. Taz: „Bitte sagen Sie jetzt nichts! Spiegel: Das wäre jetzt wirklich nicht nötig gewesen. Zum Totlachen: Heutige Titelseite des Kölner Express. Bei dieser Ge...

matthias-kehle-nachrichten.blogspot.com matthias-kehle-nachrichten.blogspot.com

Matthias Kehles Blog

Nachrichten aus der Welt des Karlsruher Schriftstellers und Journalisten Matthias Kehle. Freitag, 19. Juni 2015. Badische Neueste Nachrichten, 20. Juni 2015. Diesen Post per E-Mail versenden. Donnerstag, 18. Juni 2015. Presse-Info: 300. Stadtgeburtstag auf einem 3000er. 300 Stadtgeburtstag auf einem 3000er. Der Karlsruher Hotelier Stefan Leppert, der in Mittersill das "Alphotel Kuhstadl" betreibt, lud Kehle spontan ein, die Nacht in seinem Hotel zu verbringen, um sich von den Strapazen zu erholen. Eigent...