Tuesday, 13 December 2011. Birds in roof space! Our build was smooth, our SS was great, PCI was a breeze and hand over was simple with a few minor issue which was promised to be fixed pronto. We have a 2 story house so it was difficult to see how big the problem was until yesterday when we borrowed a ladder and took some photo's. This must be a design flaw, and should have been picked up while they were laying the tiles on the roof! Still waiting to hear back from my SS and BC on this matter. Reloved fur...
ourwaldorf44.blogspot.com
Our Waldorf 44: June 2011
http://ourwaldorf44.blogspot.com/2011_06_01_archive.html
Monday, 27 June 2011. Garage taking shape :). A little more bricks here and there and our garage is taking shape. Yay! Our garage, wished we had a bigger block for a wider garage :(. Our ground floor is nearly completed. Rubbish/broken bricks/tiles etc was being removed * *. Monday, 20 June 2011. After more than a week away, we have bricks, solar panel on, and our heating/cooling unit is installed. Just need to arrange the re-inspection for frame stage before lock up stage is completed. View from the side.
ourwaldorf44.blogspot.com
Our Waldorf 44: May 2011
http://ourwaldorf44.blogspot.com/2011_05_01_archive.html
Tuesday, 31 May 2011. 1st Floor going up! I can't believe how fast the frames are going up! Master bedroom and Terrace :). Side view of house. Corner view of 2nd Master bedroom and ensuite. (Rumpus and 4th ensuite). Couldn't avoid the sun.). I wished our house was higher! We had to cut 100mm to avoid dispensation. :(. Wednesday, 25 May 2011. Windows and sliding doors are on site. Our White terrace sliding doors? Our ground floor is taking shape. Our Porch. Yay! Tuesday, 24 May 2011. Monday, 23 May 2011.
ourwaldorf44.blogspot.com
Our Waldorf 44: August 2011
http://ourwaldorf44.blogspot.com/2011_08_01_archive.html
Tuesday, 23 August 2011. So far I am very happy with my SS who would follow up on my concerns throughout the build and the way PD has handled our roof truss issue. I feel bad that my SS would probably have extra work because of the roof truss issue but the chandelier is very important :P. I haven't been able to go into the house because it has been locked, so hopefully this week some time I can drop by and take some updated photos. Wednesday, 17 August 2011. Monday, 15 August 2011. I went by on Friday to...
ourwaldorf44.blogspot.com
Our Waldorf 44: Roof truss issue
http://ourwaldorf44.blogspot.com/2011/08/roof-truss-issue.html
Tuesday, 23 August 2011. So far I am very happy with my SS who would follow up on my concerns throughout the build and the way PD has handled our roof truss issue. I feel bad that my SS would probably have extra work because of the roof truss issue but the chandelier is very important :P. I haven't been able to go into the house because it has been locked, so hopefully this week some time I can drop by and take some updated photos. Subscribe to: Post Comments (Atom). Fixing stage completing today.
ourwaldorf44.blogspot.com
Our Waldorf 44: Defects maybe??
http://ourwaldorf44.blogspot.com/p/defects-maybe.html
This page is purely for pictures of things I think are defects :(. Part of slab broken off. Dinning room and alfresco corner. 40mm overhang? Overhang of 45mm. This is on the Garage and WIP side. Broken PVC pipe in alfresco area. Broken PVC pipe in laundry. Chipped timber on ceiling. Lopsided timber in study room. Garage/galley/laundry side wall overhang. Overhang corner of theater side. Nails chipped timber near entry. Subscribe to: Posts (Atom). Birds in roof space! View my complete profile.
metriconadventure.wordpress.com
E and M's Metricon Adventure | Knock down and rebuild project in Melbourne's south-east | Page 2
https://metriconadventure.wordpress.com/page/2
E and M's Metricon Adventure. Knock down and rebuild project in Melbourne's south-east. Skip to primary content. Skip to secondary content. Newer posts →. Landscaping – all done! November 20, 2014. The landscaping is all completed. Jason – the designer – is an absolute legend. I love his plan. I had some doubts but I’m glad he walked me through the logic and convinced me. Sometimes you need to move out of your comfort zone! I’m digging 40 posts on Saturday if anyone is free! Another angle of the front st...
metriconadventure.wordpress.com
December | 2014 | E and M's Metricon Adventure
https://metriconadventure.wordpress.com/2014/12
E and M's Metricon Adventure. Knock down and rebuild project in Melbourne's south-east. Skip to primary content. Skip to secondary content. Monthly Archives: December 2014. My kitchen – an update. December 2, 2014. I’ve had a few readers ask about how the kitchen is going. Sure. Here is the latest from the kitchen. Still need to build the garden out the window, but the rest is pretty much done. December 2, 2014. Fast forward a year and I’m thrilled that these fence panels made putting up the new fe...
ourwaldorf44.blogspot.com
Our Waldorf 44: Selections
http://ourwaldorf44.blogspot.com/p/selections_20.html
Roof tiles- Elabana Nougat. Render- 1/4 Hob bristle. Window frames/Moulding- Powder White. Kitchen cabinets- Crystal gloss polar white. Glass splashback- low iron Candlebark. Ensuite tiles and splashback. Floor tiles- Majestic 2 limestone (forgot to take photo). Tempo Cornice and Architraves. Braewood old charm 8500. Porcher Vallo round basin with Mizu 1500 ext mixer. Velocity element L3 935379 and 935378. Subscribe to: Posts (Atom). Birds in roof space! View my complete profile. Building a new home.
ourwaldorf44.blogspot.com
Our Waldorf 44: We are officially locked out!
http://ourwaldorf44.blogspot.com/2011/08/we-are-officially-locked-out.html
Saturday, 13 August 2011. We are officially locked out! I went by on Friday to the house and the doors were all locked! Even though we had paid for lock up stage in July the locks were not installed until a few days ago. I was in luck though, the guys came back from getting lunch and so I was able to go inside :). I think that the guys had installed the internal doors, skirting and architraves after lunch. The handles where attached too high, it should have been placed at the 3rd line. Building a new home.