Pitch Autopilot | Stoney & J's N214SW Build
http://rvbuild214sw.com/pitch-autopilot
Stoney and J's N214SW Build. Lessons & Hints. June 21, 2015. I went ahead and installed the pitch Autopilot. Garmin sent a solid aluminum rod and it first had to be cut to size. Then it needed a hole in the middle of it and then it had to be tapped to accept the fitting. At first I couldn’t figure out how to drill the hole centered in the rod and Van’s suggestion was to use a lathe. Perfect! VAF – RV-14 Builder’s Forum. KC & Ashley. Tim Olson’s RV-14. Picked up the Plane in Fort Worth. August 20, 2016.
rvbuild214sw.com
Panel | Stoney & J's N214SW Build
http://rvbuild214sw.com/category/panel
Stoney and J's N214SW Build. Lessons & Hints. Panel All Lit Up. August 10, 2015. Here is the panel all powered up and being configured. Should be shipping in another week. Can’t wait to get it in the plane. August 5, 2015. Everything has been added into the panel, now Aerotronics is setting it all up and testing everything. I should be getting it the 3rd week of August or so. VAF – RV-14 Builder’s Forum. KC & Ashley. Tim Olson’s RV-14. Picked up the Plane in Fort Worth. August 20, 2016. August 18, 2016.
rvbuild214sw.com
Roll Bar Painted | Stoney & J's N214SW Build
http://rvbuild214sw.com/roll-bar-painted-2
Stoney and J's N214SW Build. Lessons & Hints. August 2, 2015. With some help from a friend, Kevin, we got the roll bar and brace painted. Canopy attached to the frame. VAF – RV-14 Builder’s Forum. KC & Ashley. Tim Olson’s RV-14. Picked up the Plane in Fort Worth. August 20, 2016. Pics at the Paint Shop by Doug Reeves. August 18, 2016. Last Pic before Pickup. August 10, 2016. Seats are ready to ship! August 4, 2016. Paint almost masked out. August 3, 2016. Plane at Paint Shop. July 29, 2016. July 24, 2016.
rvbuild214sw.com
Lessons & Hints | Stoney & J's N214SW Build
http://rvbuild214sw.com/lessons-hints
Stoney and J's N214SW Build. Lessons & Hints. Lessons & Hints. VAF – RV-14 Builder’s Forum. KC & Ashley. Tim Olson’s RV-14. Picked up the Plane in Fort Worth. August 20, 2016. Pics at the Paint Shop by Doug Reeves. August 18, 2016. Last Pic before Pickup. August 10, 2016. Seats are ready to ship! August 4, 2016. Paint almost masked out. August 3, 2016. Plane at Paint Shop. July 29, 2016. RV-14 Logo for Seats. July 24, 2016. Plane being painted at Glo custom. July 11, 2016. July 9, 2016. July 8, 2016.
rvbuild214sw.com
RV-14 Performance | Stoney & J's N214SW Build
http://rvbuild214sw.com/rv-14-performance
Stoney and J's N214SW Build. Lessons & Hints. RV – 14. Speeds and ranges in statute mph. Empty weight and performance measured with Hartzell 2 Blade C/S prop. Speed – Light Weight. Cruise [75% @ 8000 ft]. Cruise [55% @ 8000 ft]. Speed – Gross Weight. Cruise [75% @ 8000 ft]. Cruise [55% @ 8000 ft]. Ground Performance – Light Weight. Ground Performance – Gross Weight. Climb/Ceiling – Light Weight. Climb/Ceiling – Gross Weight. Range – Light Weight. Range [75% @ 8000 ft]. Range [55% @ 8000 ft]. July 29, 2016.
rvbuild214sw.com
About | Stoney & J's N214SW Build
http://rvbuild214sw.com/rv-14-build
Stoney and J's N214SW Build. Lessons & Hints. As of right now, my wife is very supportive and looking forward to the day we can hop in the plane to go visit the grandkids in Texas. Hopefully as the build continues, so will the support and enthusiasm. VAF – RV-14 Builder’s Forum. KC & Ashley. Tim Olson’s RV-14. Picked up the Plane in Fort Worth. August 20, 2016. Pics at the Paint Shop by Doug Reeves. August 18, 2016. Last Pic before Pickup. August 10, 2016. Seats are ready to ship! August 4, 2016.
rvbuild214sw.com
Canopy attached to the frame | Stoney & J's N214SW Build
http://rvbuild214sw.com/canopy-attached-to-the-frame
Stoney and J's N214SW Build. Lessons & Hints. Canopy attached to the frame. July 29, 2015. Now the canopy is attached. There are a few odds and ends before I can start the fiberglass fairing process. I need to put in on the plane and check the fitting of the canopy, then attach the clips to hold it down while it is being fiberglassed. At least the pool table is getting some use, other than for folding clothes. VAF – RV-14 Builder’s Forum. KC & Ashley. Tim Olson’s RV-14. Picked up the Plane in Fort Worth.
rvbuild214sw.com
Back Window | Stoney & J's N214SW Build
http://rvbuild214sw.com/back-window
Stoney and J's N214SW Build. Lessons & Hints. June 28, 2015. VAF – RV-14 Builder’s Forum. KC & Ashley. Tim Olson’s RV-14. Picked up the Plane in Fort Worth. August 20, 2016. Pics at the Paint Shop by Doug Reeves. August 18, 2016. Last Pic before Pickup. August 10, 2016. Seats are ready to ship! August 4, 2016. Paint almost masked out. August 3, 2016. Plane at Paint Shop. July 29, 2016. RV-14 Logo for Seats. July 24, 2016. Plane being painted at Glo custom. July 11, 2016. July 9, 2016. July 8, 2016.