Cohesive Construction: May 2010
http://cohesiveconstruction.blogspot.com/2010_05_01_archive.html
Wednesday, May 12, 2010. Subscribe to: Posts (Atom). Part of the Nowwhat? Series of workshops being run in UCD this workshop will research the construction technique of timbrel vaulting. We will then build a space based on this technique. The Timbrel Vault or Catalan Arch is built up in layers using thin clay tiles and Portland cement. The creation of large spanning structures with a material thickness of 30mm using standard industrially produced clay roof tiles. Masonry Dome Analyses tool - by Wanda Lau.
cohesiveconstruction.blogspot.com
Cohesive Construction: Site Works - 20th September
http://cohesiveconstruction.blogspot.com/2009/09/site-works-20th-september.html
Friday, September 25, 2009. Site Works - 20th September. Many thanks to Mark Halpin for these images. October 3, 2009 at 1:12 PM. October 5, 2009 at 6:42 AM. If you need any additional help give me a shout, Id love to give it a go! May 30, 2013 at 10:45 PM. This comment has been removed by the author. May 30, 2013 at 10:46 PM. Hello, this is fastidious post I actually loved reading this. August 30, 2013 at 12:59 AM. Construction Tools in Pune. Subscribe to: Post Comments (Atom). Part of the Nowwhat?
cohesiveconstruction.blogspot.com
Cohesive Construction: November 2009
http://cohesiveconstruction.blogspot.com/2009_11_01_archive.html
Tuesday, November 3, 2009. Site Works - latest photo. Subscribe to: Posts (Atom). Part of the Nowwhat? Series of workshops being run in UCD this workshop will research the construction technique of timbrel vaulting. We will then build a space based on this technique. The Timbrel Vault or Catalan Arch is built up in layers using thin clay tiles and Portland cement. The creation of large spanning structures with a material thickness of 30mm using standard industrially produced clay roof tiles. Masonry Dome...
cohesiveconstruction.blogspot.com
Cohesive Construction: February 2010
http://cohesiveconstruction.blogspot.com/2010_02_01_archive.html
Thursday, February 4, 2010. The dome will be completed in early March when the weather permits a week-long engagement by second year architects led by Michael Pike. Subscribe to: Posts (Atom). Part of the Nowwhat? Series of workshops being run in UCD this workshop will research the construction technique of timbrel vaulting. We will then build a space based on this technique. The Timbrel Vault or Catalan Arch is built up in layers using thin clay tiles and Portland cement. This project would not be possi...
cohesiveconstruction.blogspot.com
Cohesive Construction: Site Works Aug.31 - Sep.5
http://cohesiveconstruction.blogspot.com/2009/09/site-works-aug31-sep5.html
Sunday, September 6, 2009. Site Works Aug.31 - Sep.5. We now have completed all of the necessary brickwork to proceed with the dome! We have placed an additional timber guide within the structure to aid in the correct positioning of the tiles for the dome. This guide represents the line of 1/2 of the dome (or 1/4 of a sphere) from springing point to oculus. The dome tiles are cut to fit with the arches and laid out prior to plastering and placement. Doming will proceed all week. April 17, 2014 at 12:29 AM.
cohesiveconstruction.blogspot.com
Cohesive Construction: September 2009
http://cohesiveconstruction.blogspot.com/2009_09_01_archive.html
Friday, September 25, 2009. Site Works - 20th September. Many thanks to Mark Halpin for these images. Sunday, September 6, 2009. Site Works Aug.31 - Sep.5. We now have completed all of the necessary brickwork to proceed with the dome! We have placed an additional timber guide within the structure to aid in the correct positioning of the tiles for the dome. This guide represents the line of 1/2 of the dome (or 1/4 of a sphere) from springing point to oculus. Doming will proceed all week. The origins of th...
cohesiveconstruction.blogspot.com
Cohesive Construction: Now What Exhibition
http://cohesiveconstruction.blogspot.com/2009/10/now-what-exhibition.html
Thursday, October 8, 2009. All the different Now What groups will be exhibiting their work in Smithfiled over the coming weeks. All are invited to the exhibition which opens Friday 9th at 7:30pm. Subscribe to: Post Comments (Atom). Part of the Nowwhat? Series of workshops being run in UCD this workshop will research the construction technique of timbrel vaulting. We will then build a space based on this technique. We will explore timbrel vault construction through the design and execution of a 4m x 4m do...
cohesiveconstruction.blogspot.com
Cohesive Construction: Site Works - Latest Images
http://cohesiveconstruction.blogspot.com/2009/10/blog-post.html
Friday, October 9, 2009. Site Works - Latest Images. Subscribe to: Post Comments (Atom). Part of the Nowwhat? Series of workshops being run in UCD this workshop will research the construction technique of timbrel vaulting. We will then build a space based on this technique. The Timbrel Vault or Catalan Arch is built up in layers using thin clay tiles and Portland cement. The creation of large spanning structures with a material thickness of 30mm using standard industrially produced clay roof tiles. Mason...
cohesiveconstruction.blogspot.com
Cohesive Construction: August 2009
http://cohesiveconstruction.blogspot.com/2009_08_01_archive.html
Sunday, August 30, 2009. Site Works Aug 22-26. Tuesday, August 25, 2009. Site works - 20th and 21st August. We've completed the arches and have started work on the dome. The key thing for the coming week is to keep the brick rising walls ahead of the dome, as we cannpt complete the dome until the walls are in place. Thursday, August 20, 2009. Pines Calyx time lapse. A time-lapse of the construction of the main dome in Pines Calyx using timbrel techniques. Wednesday, August 19, 2009. The beam across the t...