dornicaco.com
News
http://dornicaco.com/index.php/en/news
Page 1 of 5. A Comparison of Two Effective Approaches to Accelerated Weathering and Light Stability Testing. The Need for Testing:. Weathering and light exposure are important causes of damage to coatings, plastics, inks, and other organic materials. This damage includes gloss loss, fading, yellowing, cracking, peeling, embrittlement, loss of tensile strength, and delaminating. The inherent strengths and weaknesses of each tester will be discussed, including purchase price and operating costs. Guidel...
behfaraz.com
سوله غواصی ناجا
http://www.behfaraz.com/index.php/2012-02-13-11-59-57/sole-ghavasi-naja
جام جم کاج آبادی. عنوان پروژه: سوله غواصی نداجای بندرعباس. کارفرما: شرکت پارس بنای صدر. تهیه کلیه مصالح و اجرای عملیات تأسیسات مکانیکال و الکتریکال. 2,602,336,000 ريال.
behfaraz.com
بیمارستان چمران
http://www.behfaraz.com/index.php/2012-02-13-11-59-57/chamran-hospital
جام جم کاج آبادی. عنوان پروژه: بخش کت لب، آنژیو و درمانگاه چشم. بیمارستان شهید دکتر چمران. شرکت پارس بنای صدر. اجرای عملیات تأسیسات مکانیکال و الکتریکال. 1,230,590,000 ريال.
behfaraz.com
.::Behfaraz Gostar Co.::
http://www.behfaraz.com/index.php
جام جم کاج آبادی.
behfaraz.com
جام جم کاج آبادی
http://www.behfaraz.com/index.php/2012-02-13-11-59-57/abadi
جام جم کاج آبادی. جام جم کاج آبادی. جام جم کاج آبادی. ساختمان پیام بازرگانی صدا و سیما. کارفرما: شرکت عمران پارس جام جم. خیابان ولیعصر، روبروی پارک ملت. اجرای عملیات تأسیسات مکانیکال و الکتریکال. 1,241,450,000 ريال.
tavanara.com
::: Tavan Ara Official Website :::
http://www.tavanara.com/subp/mes.html
MES (Manufacture Execution System) project at PARS KHODRO concentrated paint shop. With respect to the experience of Tavanara expertise in all aspects of hardware, software and the process involved in manufacturing car paint shops, this company was considered to be one of the technically qualified firms for MES project of PARS KHODRO concentrated paint shop. Tavanara responsibility in this project was as follows:. Machine status monitoring at different production lines.
tavanara.com
::: Tavan Ara Official Website :::
http://www.tavanara.com/subs/s-mi.html
Mechanic, Mechanical Installation. Design and installation of conveyor systems. Design and installation of modular conveyors in production lines. Design and installation of POWER and FREE conveyors. Design and installation of EMS conveyors. Preparing work force, materials, equipments, parts, tools and industrial items in the field of mechanics and mechanical installation. Design and installation of industrial waste water treatment plants. Design and installation of fire alarm and extinction.
tavanara.com
::: Tavan Ara Official Website :::
http://www.tavanara.com/subp/bonro.html
Paint Shop manufacturing, construction and start-up (BonRo car manufacturing company at Saveh). Paint Shop of BonRo originally was designed for painting of CORANDO and CHAIRMAN cars, by companies namely DURR and HADEN. Basic design of PT, ED and ED OVEN section in this paint shop was completed by DURR company and in this design some of the latest technologies such as Robiq3 have been utilized. Design, construction and installation of power and control panels. Design and software programming of PLC.
tavanara.com
::: Tavan Ara Official Website :::
http://www.tavanara.com/subs/s-ec.html
Electricity, Electrical Installation and Industrial Automation. Design of building, industrial electrical installation consisting:. Preparing of calculation sheets, earth system plan, electrical distribution, electrical posts and cabling plan. Design of fire alarm system, telephone and paging systems. Design and manufacturing of electrical distribution panel. Building electrical installation works. Industrial electrical installation works such as: medium voltage. PLC system start-up of industrial plants.
SOCIAL ENGAGEMENT