bcrailfortnelson.wordpress.com
July | 2015 | BC Rail - Fort Nelson Subdivision in N Scale
https://bcrailfortnelson.wordpress.com/2015/07
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. July 21, 2015. Yes Clearly nothing has happened on the layout in a while, but i have a valid excuse. It was a still a tough choice because I knew it would involve complete dismantling of the layout and being a lot further away from the model rail communities in Calgary and Vancouver. I’m sure I will be tempted by New Zealand’s 42 inch narrow gauge operations at some point too. Modelling it invol...Matt Watson&#...
bcrailfortnelson.wordpress.com
August | 2014 | BC Rail - Fort Nelson Subdivision in N Scale
https://bcrailfortnelson.wordpress.com/2014/08
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. August 4, 2014. A hot, dry sunny summer in southern Alberta makes it hard to stay inside and build models. The Beatton River bridge scene did recently come alive with the addition of a few dozen trees however. Heki HO scale poplars make a surprisingly convincing N scale northern aspen forest. Two Years In…. Lower Deck Photo Backdrop Extension. BC Rail Dawson Creek and Prince George subdivisions in HO.
bcrailfortnelson.wordpress.com
October | 2014 | BC Rail - Fort Nelson Subdivision in N Scale
https://bcrailfortnelson.wordpress.com/2014/10
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. Two Years In…. October 16, 2014. South and West Wall – October 2014. Mukswa Industrial Area (Upper Deck Right), Fort Nelson Yard (Upper Deck Left), Future South Staging (Lower Deck Right) and Fort Nelson River Scene (Lower Deck Left). Following are some progress photos from the last couple of weeks. Alaska Highway crossing backdrop section installed. And this post describes where I was 1 year ago. Filed in Layo...
bcrailfortnelson.wordpress.com
November Update | BC Rail - Fort Nelson Subdivision in N Scale
https://bcrailfortnelson.wordpress.com/2014/11/02/november-update
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. November 2, 2014. New display board photo showing progress at Fort Nelson. The last few weeks have mostly been focused on cleaning up the layout room, organizing modelling supplies and creating updated display board material for the upcoming PGE/ BCR modellers display area at the Trains 2014 show in Burnaby, BC. A selection of this material is shown below. Leave a Reply Cancel reply. Enter your comment here.
bcrailfortnelson.wordpress.com
September | 2014 | BC Rail - Fort Nelson Subdivision in N Scale
https://bcrailfortnelson.wordpress.com/2014/09
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. Fort Nelson River Photo Backdrop Installation. September 27, 2014. BCOL 611 heads southbound across the Fort Nelson river with the newly installed photo backdrop filling in the scene. Following are some images during and after installation. The Fort Nelson bridge was also mocked up in place to get an idea of view angles. Filed in Layout Design and Construction Blog. Tagged: Fort Nelson River. September 20, 2014.
bcrailfortnelson.wordpress.com
BC Rail - Fort Nelson Subdivision in N Scale | Modelling BC Rail's remote north end in N Scale | Page 2
https://bcrailfortnelson.wordpress.com/page/2
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. Muskwa Photo Backdrop Installation. September 20, 2014. CRS-20s in front of the new Muskwa industrial backdrop. Today saw the first extension of photo backdrops in almost 2 years. The Muskwa industrial backdrop was installed over the weekend and adds 10.5 feet of photo backdrop to the upper deck. Carefully aligning the Muskwa backdrop (right) with the existing Fort Nelson yard backdrop (left). With the backdrop...
bcrailfortnelson.wordpress.com
Staging Yard Photo Backdrop Installation | BC Rail - Fort Nelson Subdivision in N Scale
https://bcrailfortnelson.wordpress.com/2014/10/01/staging-yard-photo-backdrop-installation
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. Staging Yard Photo Backdrop Installation. October 1, 2014. Lower deck staging yard photo backdrop installed. The lower deck staging yard will be a small 2 or 3 track yard that will be scenicked with a forested ridge background. It will be a generic representation of one of the several remote passing sidings on the Fort Nelson subdivision. Filed in Layout Design and Construction Blog. Leave a Reply Cancel reply.
bcrailfortnelson.wordpress.com
Summer Update | BC Rail - Fort Nelson Subdivision in N Scale
https://bcrailfortnelson.wordpress.com/2015/07/21/summer-update
BC Rail – Fort Nelson Subdivision in N Scale. Modelling BC Rail's remote north end in N Scale. July 21, 2015. Yes Clearly nothing has happened on the layout in a while, but i have a valid excuse. It was a still a tough choice because I knew it would involve complete dismantling of the layout and being a lot further away from the model rail communities in Calgary and Vancouver. I’m sure I will be tempted by New Zealand’s 42 inch narrow gauge operations at some point too. Modelling it invol...You are comme...