acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: Oooops......Sorry!
http://acardiganforarwen.blogspot.com/2007/08/oooopssorry.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Wednesday, August 15, 2007. It hit me last night right before I went to bed that I posted just a picture of Arwen after blocking. Here is a finished picture. For moire info/specs. check out my blog. Posted by Linda @ 8/15/2007. At 8/15/2007 2:20 PM. Great job on your Arwen! Links to this post:. Kat with a K. It Is Done, hurray! So far so good, pretty much.
acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: how to attach the sleeves to the back when knitting Arwen in one piece
http://acardiganforarwen.blogspot.com/2007/10/how-to-attach-sleeves-to-back-when.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Thursday, October 25, 2007. How to attach the sleeves to the back when knitting Arwen in one piece. As you can see, there is a visible line, but it's not nearly as lumpy as a sewn seam would be. Erm, a seam sewn by me, I mean. I'm sure y'all are much better at seam-sewing than I am. Posted by alala @ 10/25/2007. At 10/26/2007 11:40 AM. Thanks for the "tutorial"!
acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: August 2007
http://acardiganforarwen.blogspot.com/2007_08_01_archive.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Wednesday, August 15, 2007. It hit me last night right before I went to bed that I posted just a picture of Arwen after blocking. Here is a finished picture. For moire info/specs. check out my blog. Posted by Linda @ 8/15/2007. Links to this post. Monday, August 13, 2007. It Is Done, hurray! Posted by Linda @ 8/13/2007. Links to this post. Links to this post.
acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: January 2007
http://acardiganforarwen.blogspot.com/2007_01_01_archive.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Monday, January 29, 2007. Arwen's back is covered. I finished the back, seamed, hemmed, and worked in most of my ends. I like to do a lot of finishing before the end of the knitting. Sometimes, it takes me forever to finish if I don't have the finishing started. I'm not sure the picture actually helps, but here it is anyway. Make sense? Links to this post. After...
acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: February 2007
http://acardiganforarwen.blogspot.com/2007_02_01_archive.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Monday, February 26, 2007. And yet another newbie. It sure is exciting to see pictures of everyone's finished , or semi-finished cardigans. All those cables look great, and I am trying not to get too intimidated. I hope I haven't gotten in over my head! That was mentioned on a previous post by alala. I hope to have a much more exciting picture soon! ANYWAY, I ju...
acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: So far so good, pretty much
http://acardiganforarwen.blogspot.com/2007/08/so-far-so-good-pretty-much.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Wednesday, August 08, 2007. So far so good, pretty much. Well, the weather broke, and it's damp and cold enough that I can face the idea of a lapful of merino, so I've made a bit more progress on Arwen. The second sleeve is done, grafted and seamed. Posted by alala @ 8/08/2007. Links to this post:. Kat with a K. Ok, its back to the drawing board {sob!
acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: Ok, its back to the drawing board {sob!}
http://acardiganforarwen.blogspot.com/2007/07/ok-its-back-to-drawing-board-sob.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Monday, July 30, 2007. Ok, its back to the drawing board {sob! I'm admitting defeat and throwing in the towel on trying to correct the cuff edge. And I think I'll be giving up on the idea of knitting both sleeves at once, its just more than I can keep straight (maybe I'll feel differently about that after the wedding). Posted by Bev @ 7/30/2007. Kat with a K.
acardiganforarwen.blogspot.com
A Cardigan for Arwen KAL: Back to working......
http://acardiganforarwen.blogspot.com/2007/10/back-to-working.html
A Cardigan for Arwen KAL. The Knit-Along for A Cardigan for Arwen. By Kate Gilbert from Interweave Knits, Winter 2006. Come join the Fellowship! Monday, October 22, 2007. After a break to marry off the daughter I'm making this for and then to recover from all the flower preparation, cake decorating and general chaos, I'm back to working on this. I'm knitting in the round, so at this point one front and one sleeve are complete and I'm now working on the other sleeve. Posted by Bev @ 10/22/2007.
SOCIAL ENGAGEMENT