s278.biz
Home
http://www.s278.biz/index.html
Hope and Clay Construction Ltd. Queen Elizabeth Barracks, Church Crookahm. This website is used for providing information on some current schemes to ensure that members of the public are as informed as possible. Our other websites which are linked here are:-. Our Main Company Website). South East Highway Framework Website). Website Dedicated to our S278 Works in Church Crookham).
se7.biz
Home
http://www.se7.biz/index.html
Hope and Clay Construction Ltd. The purpose of this website is to keep the local population informed of what works are being carried out, how we are carrying them out and of our progress. This Website will provide information on Current Projects awarded under the Framework. Links to the relevant Project are provided. Hope and Clay (Construction) Ltd are among a number of Civil Engineering Contractors appointed to carry out Highway Improvements under the South East 7 Highways Framework. Moat Close, Bramley.
s278.biz
The Avenue Basingstoke
http://www.s278.biz/page14.html
Hope and Clay Construction Ltd. Queen Elizabeth Barracks, Church Crookahm. We have been appointed to carry out the Road Improvements at the above on behalf of the Taylor Wimpey Construction. The works are to be carried out to bring the road up to adoptable standards. The works include reconstruction of the existing road, improved drainage, a new footpath, traffic calming measures with associated street lighting and signage. The works will commence on 1. Drawings of the works can be found by clicking here.
s278.biz
Contact Us
http://www.s278.biz/page5.html
Hope and Clay Construction Ltd. Queen Elizabeth Barracks, Church Crookahm. Tel 01635 268 502. Fax 01635 268 936. You have any queries you wish to share with us, please feel free to contact us in any of the following ways or use the comment box below.
s278.biz
Milford
http://www.s278.biz/milford.html
Hope and Clay Construction Ltd. Queen Elizabeth Barracks, Church Crookahm. RAKE LANE and TUESLEY LANE, MILFORD. We confirm that we have been appointed by Barratt Southern Counties to carry out the S278 Roadworks at the above. These works include the installation of Kerbed buildouts in both locations and the upgrading and widening of the footpath in Tuesley Lane. It is envisaged that the works will be completed within thirteen weeks but may be subject to change due to factors beyond our collective control.