MEND Center, Pacoima California R.E. Lee Design and Construction. Saturday, December 24, 2005. Concrete pour of the main lobby. More concrete being poured. Concrete for first floor lobby. Posted by MEND Center at 8:04 AM. Wednesday, December 21, 2005. 122105 First Concrete Pour. Looking West from Elevator Lobby. Shower and Elevator Pit. Looking South West from Shower. Main Entry at Pierce Street. Entrance from Parking Lot. Posted by MEND Center at 4:39 PM. Monday, December 19, 2005. The fisrt steel column.
mendcenter.blogspot.com
M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: April 2006
http://mendcenter.blogspot.com/2006_04_01_archive.html
MEND Center, Pacoima California R.E. Lee Design and Construction. Friday, April 14, 2006. 04142006 Second Floor Layout. Second Floor Main Lobby. Posted by MEND Center at 11:33 AM. Monday, April 10, 2006. 04072006 High Roof Trusses. Second floor wall layout. Click picture to enlarge). Main lobby at second floor. Main lobby at forst floor. Main lobby at second floor. Wall layout for second floor. Main lobby looking up through second floor. Posted by MEND Center at 3:33 PM. Pacoima, California, United States.
mendcenter.blogspot.com
M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: September 2006
http://mendcenter.blogspot.com/2006_09_01_archive.html
MEND Center, Pacoima California R.E. Lee Design and Construction. Tuesday, September 05, 2006. Main Lobby at Small Store. Exterior Color Sample Boards. Looking up to Second Floor Lobby. Second Floor Ceiling from Main Staircase. First Coat of Stucco on North Elevation. Storage on the Roof Storage Area. Tectum Soundboard at Second Floor Ceiling. Tile in the Shower. Lobby Ceiling from the First Floor. Lobby Ceiling from the First Floor. MEND Center from Illex Street. MEND Center from Across San Fernando Road.
mendcenter.blogspot.com
M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: June 2006
http://mendcenter.blogspot.com/2006_06_01_archive.html
MEND Center, Pacoima California R.E. Lee Design and Construction. Wednesday, June 28, 2006. Here is what has been hapening over the past month and a half. Drywalll is begining and the roofis complete. Air conditioning units have been set on the roof as well. Roll Up Door at the Wearhouse. Tile Designing in the Office. Low Roof over Foor Wearhouse. Drwyall in the First Floor Lobby. Steve Haglund, Project Superintendent, on the Forklift. DWP moving electric wires. Roll-Up Door at Food Wearhouse.
mendcenter.blogspot.com
M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: August 2006
http://mendcenter.blogspot.com/2006_08_01_archive.html
MEND Center, Pacoima California R.E. Lee Design and Construction. Thursday, August 03, 2006. Delivery of sand for lightweight concrete. First floor lobby looking notrh east. Second floor medical hallway looking west. Main entry on first floor. Posted by MEND Center at 11:41 AM. Pacoima, California, United States. View my complete profile. RE Lee Design and Construction. Tuesday, October 17, 2006. Main Lobby at Small Store Exterior Co. 04142006 Second Floor Layout.
mendcenter.blogspot.com
M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: February 2006
http://mendcenter.blogspot.com/2006_02_01_archive.html
MEND Center, Pacoima California R.E. Lee Design and Construction. Monday, February 20, 2006. The first floor is almost completely framed and the second floor floor joists are being installed. The building is really starting to take shape. Looking at the clothing store from the nmain lobby. Inside the clothing store. Looking out from the clothing store to the main lobby. Doorway and window to the clothing sorting room. Food Distribution and offices. Canopy framing over the outdoor sorting area.
mendcenter.blogspot.com
M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: January 2006
http://mendcenter.blogspot.com/2006_01_01_archive.html
MEND Center, Pacoima California R.E. Lee Design and Construction. Friday, January 27, 2006. Posted by MEND Center at 11:33 AM. Thursday, January 19, 2006. Steel beams are being set. You can finally begin to understand what the finished building will feel like. Posted by MEND Center at 3:56 PM. Friday, January 13, 2006. 01132006 Concrete Site Work. Concrete Swale for Parking Lot. Robert Lee, President, R.E. Lee Design and Construction. Steve Haglund, Project Superintendent. Thursday, January 12, 2006.
mendcenter.blogspot.com
M.E.N.D. Center, Pacoima California R.E. Lee Design and Construction: November 2005
http://mendcenter.blogspot.com/2005_11_01_archive.html
MEND Center, Pacoima California R.E. Lee Design and Construction. Thursday, November 10, 2005. Construction 11.08.2005. Construction is going well and on schedule. The exterior foundations are poured and most of the under ground utility work is complete. Also, the exterior masonry block fence wall is well underway. Property line block wall. Property line block wall. Property line block wall and rebar. South foundation wall at steel column. South foundation wall at main entry. View my complete profile.