ryanhomestake2.blogspot.com ryanhomestake2.blogspot.com

RYANHOMESTAKE2.BLOGSPOT.COM

Ryan Homes Take 2 - Rome Model 2012

Sunday, January 19, 2014. Mud Room, Pantry, Main Hallway, Loft changes/updates. We have made a few adjustments in various places over the last few months. We also have some ideas of things to put on our to-do list. One is to change the 2nd closet in the master bedroom into a ROOM by adding a new wall where the closet would have been if we had that 3rd bathroom upstairs. With that wall installed, that closet will be almost the size of the guest bedroom! Bought a bunch of stacking shelves from. On to figur...

http://ryanhomestake2.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR RYANHOMESTAKE2.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

January

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Sunday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 3.2 out of 5 with 5 reviews
5 star
1
4 star
1
3 star
2
2 star
0
1 star
1

Hey there! Start your review of ryanhomestake2.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.8 seconds

FAVICON PREVIEW

  • ryanhomestake2.blogspot.com

    16x16

  • ryanhomestake2.blogspot.com

    32x32

  • ryanhomestake2.blogspot.com

    64x64

  • ryanhomestake2.blogspot.com

    128x128

CONTACTS AT RYANHOMESTAKE2.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Ryan Homes Take 2 - Rome Model 2012 | ryanhomestake2.blogspot.com Reviews
<META>
DESCRIPTION
Sunday, January 19, 2014. Mud Room, Pantry, Main Hallway, Loft changes/updates. We have made a few adjustments in various places over the last few months. We also have some ideas of things to put on our to-do list. One is to change the 2nd closet in the master bedroom into a ROOM by adding a new wall where the closet would have been if we had that 3rd bathroom upstairs. With that wall installed, that closet will be almost the size of the guest bedroom! Bought a bunch of stacking shelves from. On to figur...
<META>
KEYWORDS
1 walmart
2 posted by
3 kimmie edwards
4 5 comments
5 email this
6 blogthis
7 share to twitter
8 share to facebook
9 share to pinterest
10 deck completion
CONTENT
Page content here
KEYWORDS ON
PAGE
walmart,posted by,kimmie edwards,5 comments,email this,blogthis,share to twitter,share to facebook,share to pinterest,deck completion,4 comments,contemporary patio,fischer and frichtel,6 comments,7 comments,8 comments,older posts,about me,blog archive
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Ryan Homes Take 2 - Rome Model 2012 | ryanhomestake2.blogspot.com Reviews

https://ryanhomestake2.blogspot.com

Sunday, January 19, 2014. Mud Room, Pantry, Main Hallway, Loft changes/updates. We have made a few adjustments in various places over the last few months. We also have some ideas of things to put on our to-do list. One is to change the 2nd closet in the master bedroom into a ROOM by adding a new wall where the closet would have been if we had that 3rd bathroom upstairs. With that wall installed, that closet will be almost the size of the guest bedroom! Bought a bunch of stacking shelves from. On to figur...

INTERNAL PAGES

ryanhomestake2.blogspot.com ryanhomestake2.blogspot.com
1

Ryan Homes Take 2 - Rome Model 2012: January 2012

http://ryanhomestake2.blogspot.com/2012_01_01_archive.html

Tuesday, January 31, 2012. There are so many things to decide with such teeny-tiny little samples to work with. But here are our choices and we are crossing our fingers that everything will work out with our furniture and our taste. :). Flooring: Foyer, Front Hall, Mudroom, Powder room, and Dining room = Laminate hardwood. Flooring Family Room and Study - Sandswept. Master Bath tile - custom brixton sand 12x12, saddle 5/8x5/8. Flooring - Bedrooms - all the same "winter milk" base carpet. We have had MANY...

2

Ryan Homes Take 2 - Rome Model 2012: 2 weeks post move-in = a work in progress!

http://ryanhomestake2.blogspot.com/2012/05/2-weeks-post-move-in-work-in-progress.html

Monday, May 14, 2012. 2 weeks post move-in = a work in progress! We are still working on unpacking and setting everything up in each room of the house. We have been here 2 weeks and there are so many things on our "to do" list, but overall we are happy with everything so far. We do have a running list of items to tell our PM about, but nothing major that needs to be addressed (YEA! A big THANK YOU to PAM for the desk because we had a card table before she gave us this desk! Living Room - just need to fin...

3

Ryan Homes Take 2 - Rome Model 2012: January 2014

http://ryanhomestake2.blogspot.com/2014_01_01_archive.html

Sunday, January 19, 2014. Mud Room, Pantry, Main Hallway, Loft changes/updates. We have made a few adjustments in various places over the last few months. We also have some ideas of things to put on our to-do list. One is to change the 2nd closet in the master bedroom into a ROOM by adding a new wall where the closet would have been if we had that 3rd bathroom upstairs. With that wall installed, that closet will be almost the size of the guest bedroom! Bought a bunch of stacking shelves from. On to figur...

4

Ryan Homes Take 2 - Rome Model 2012: UPDATES and maybe going to build a deck

http://ryanhomestake2.blogspot.com/2013/06/maybe-going-to-build-deck.html

Friday, June 14, 2013. UPDATES and maybe going to build a deck. We are hoping to have a deck built before 4th of July this year! We've been in our house for over a year and have done a lot of planning but haven't really put any of those plans in motion because I returned to work this year (yikes! But it is now the first day of summer vacation and I am on a mission to do more things to our house! Here are the colors of the decking we plan to use. By Chesterfield General Contractors. Its got to be so much ...

5

Ryan Homes Take 2 - Rome Model 2012: Mud Room, Pantry, Main Hallway, Loft changes/updates

http://ryanhomestake2.blogspot.com/2014/01/mud-room-pantry-main-hallway-loft.html

Sunday, January 19, 2014. Mud Room, Pantry, Main Hallway, Loft changes/updates. We have made a few adjustments in various places over the last few months. We also have some ideas of things to put on our to-do list. One is to change the 2nd closet in the master bedroom into a ROOM by adding a new wall where the closet would have been if we had that 3rd bathroom upstairs. With that wall installed, that closet will be almost the size of the guest bedroom! Bought a bunch of stacking shelves from. On to figur...

UPGRADE TO PREMIUM TO VIEW 10 MORE

TOTAL PAGES IN THIS WEBSITE

15

LINKS TO THIS WEBSITE

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: December 2013

http://buildingromemodelwithryanhomes.blogspot.com/2013_12_01_archive.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. Saturday, December 21, 2013. Elevations to Consider for our Rome. With Cobble Stone - Adds a 2 Foot Extension on the Loft. This is my favorite. Friday, December 20, 2013. Bad CreditKarma.com - Beware of Inaccurate Credit Scores! I was so happy but a little mad that it had me so worried and trying to bring it up all these months all for not! So if you are monitoring your credi...

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: Today is Moving Day!!!

http://buildingromemodelwithryanhomes.blogspot.com/2014/07/today-is-moving-day.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. Thursday, July 10, 2014. Today is Moving Day! July 10, 2014 at 6:56 PM. Cant wait til im done moving. Subscribe to: Post Comments (Atom). Self Employed in Internet Sales and Marketing, also eBay Power Seller and Mom of 2 Amazing Sons! My Fav Blogs List. We're building a Ryan Home:Rome. Ryan Homes Take 2 - Rome Model 2012. Mud Room, Pantry, Main Hallway, Loft changes/updates.

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: Spent 4 Hours Raking up Hay and Rocks! What a PAIN!

http://buildingromemodelwithryanhomes.blogspot.com/2014/07/spent-4-hours-raking-up-hay-and-rocks.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. Saturday, July 12, 2014. Spent 4 Hours Raking up Hay and Rocks! And that hay is just a pain in the butt! I do not like yard work so I was screaming every time I saw a bug and complaining the entire time LOL. Needless to say I'm not looking forward to doing the sides and back of the house LOL! July 14, 2014 at 9:58 AM. But kudos to you and your son for getting the job done!

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: Bad Starter Lawn Job PLUS My DIY Sprinkler System

http://buildingromemodelwithryanhomes.blogspot.com/2014/07/bad-starter-lawn-job-plus-my-diy.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. Sunday, July 27, 2014. Bad Starter Lawn Job PLUS My DIY Sprinkler System. But as far as the lawn is concerned, I informed my PM and he is going to have them come back out and redo it properly and get the rocks and branches out and reseed once it cools down a bit. So the setup I'm going with consist of the following:. 3) Rainbird 25 Impact Sprinkler Heads (Lowes.com). So if yo...

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: May 2015

http://buildingromemodelwithryanhomes.blogspot.com/2015_05_01_archive.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. Tuesday, May 5, 2015. My Cheap Landscaping Design and Temporarily Conquered my Fear of Bugs! I'm so proud of myself! Plus it was very rewarding to see the end result! And no bugs LOL! Oh, except for the dead baby bunny. Yikes LOL! My dad stopped by later and I asked him about the little trees on the corner of the house because they're brown, I thought they were dead. He s...

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: Wish List

http://buildingromemodelwithryanhomes.blogspot.com/p/wish-list.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. This is the Wish List of things we plan to upgrade later after we close. We made the mistake before of adding these upgrades during the building process which drove our sale price up by nearly $150,000 in Upgrades alone! Not this time, we are building smart! Our goal is to keep our cost down! We want our sale price to be as low as possible! Ryan charges $1495 for upgrade) - W...

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: Selections

http://buildingromemodelwithryanhomes.blogspot.com/p/selections.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. I decided to add my selections in separate post on the blog. Flooring Selections: Click Here. Rome Main Selections: Click Here. Subscribe to: Posts (Atom). Self Employed in Internet Sales and Marketing, also eBay Power Seller and Mom of 2 Amazing Sons! My Fav Blogs List. We're building a Ryan Home:Rome. Ryan Homes Take 2 - Rome Model 2012. I'm back with HUGE NEWS!

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: Timeline

http://buildingromemodelwithryanhomes.blogspot.com/p/timeline.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. January 17, 2014 - Meet with SR to start the Process and pick our options. January 20, 2014 - Meet with LO and Applied for our NVR Mortgage. January 22, 2014 - Meet with RiteRug to pick out Flooring. January 30, 2014 - Meet with Guardian to Pick Options. January 30, 2014 - Meet with SR for 14 Day Change Meeting. Now we just wait for approval. Uggh! March 26, 2014 at 2:37 PM.

buildingromemodelwithryanhomes.blogspot.com buildingromemodelwithryanhomes.blogspot.com

Building Rome with Ryan Homes: Rome Sweet Home: April 2014

http://buildingromemodelwithryanhomes.blogspot.com/2014_04_01_archive.html

Building Rome with Ryan Homes: Rome Sweet Home. This blog will document my entire experience of Building the Rome with Ryan Homes. Sunday, April 20, 2014. Progress Week 5: Windows, Doors and HVAC Installed. Our Pre-Drywall meeting is going to be scheduled this week. This is all going so fast my head is spinning LOL! I will update this post later to let you know exactly what all was done this week. I did confirm that all Electrical, Heating and Cooling had been installed this week. Saturday, April 12, 2014.

UPGRADE TO PREMIUM TO VIEW 214 MORE

TOTAL LINKS TO THIS WEBSITE

223

OTHER SITES

ryanhomessorrento.blogspot.com ryanhomessorrento.blogspot.com

Building a Sorrento

My experience building with Ryan Homes. Friday, August 29, 2014. Life in Suzhou, China. Check out my new blog: http:/ lifeinsuzhouchina.blogspot.com. I will update this blog with my travels around China in early September, 2014. Posted by Building a Sorrento. Thursday, December 26, 2013. So, I owned my house for about 18 months and this is what I have to say:. Posted by Building a Sorrento. Monday, April 8, 2013. One Year Drywall Work Complete. So, just over one year into my house and I still think it's ...

ryanhomessouthhamptonroads.com ryanhomessouthhamptonroads.com

Ecendant Interactive

ryanhomesstonehaven.com ryanhomesstonehaven.com

Ryanhomesstonehaven.com

This domain may be for sale. Backorder this Domain. This Domain Name Has Expired - Renewal Instructions.

ryanhomessun.com ryanhomessun.com

Ecendant Interactive

ryanhomessunridge.com ryanhomessunridge.com

Ecendant Interactive

ryanhomestake2.blogspot.com ryanhomestake2.blogspot.com

Ryan Homes Take 2 - Rome Model 2012

Sunday, January 19, 2014. Mud Room, Pantry, Main Hallway, Loft changes/updates. We have made a few adjustments in various places over the last few months. We also have some ideas of things to put on our to-do list. One is to change the 2nd closet in the master bedroom into a ROOM by adding a new wall where the closet would have been if we had that 3rd bathroom upstairs. With that wall installed, that closet will be almost the size of the guest bedroom! Bought a bunch of stacking shelves from. On to figur...

ryanhomestw.com ryanhomestw.com

Ryanhomestw.com

This domain may be for sale. Backorder this Domain. This Domain Name Has Expired - Renewal Instructions.

ryanhomesvenicemodel.blogspot.com ryanhomesvenicemodel.blogspot.com

Ryanhomes Venice Model - Pittsburgh

Ryanhomes Venice Model - Pittsburgh. This is our new home building journal with Ryan Homes.the good, the bad, and the ugly. We are not paid by Ryan Homes or receiving any type of incentive to do this. We just want to document for ourselves and share with others so that they know what to expect. This is our first and hopefully last home together! Thursday, August 13, 2015. Troy Polamalu Signed Steelers Jersey! I found this great coupon, but I have no idea how long it will last. Wednesday, August 12, 2015.

ryanhomesveniceohio.blogspot.com ryanhomesveniceohio.blogspot.com

Building our Venice with Ryan Homes

Building our Venice with Ryan Homes. Building our Venice in Northeast Ohio with Ryan Homes. Future Projects and Ideas for our House. Sunday, November 2, 2014. We completed our pre-settlement walk-through and closed on our home last Wednesday, October 29th and received our keys on Thursday! Closing and signing all of our mortgage loan papers only took us about 20 minutes! It went quickly and was painless. Master Bedroom Ceiling Fan. Pendant Lights - Ignore the Mess! Thursday, October 23, 2014. Only thing ...

ryanhomesvf.blogspot.com ryanhomesvf.blogspot.com

A Victoria Falls with Ryan Homes. To be or not to be?

A Victoria Falls with Ryan Homes. To be or not to be? Wednesday, December 4, 2013. Almost there.thanks be to God. We are a little less than one week from closing. This has been a very long process but we are so grateful for the opportunity to build. The house looks really nice and my husband and I are very pleased. Friday, August 30, 2013. Approved and Construction started. Friday, May 31, 2013. We are in underwriting. I am so anxious! Wednesday, May 8, 2013. A VERY LONG WAIT! Subscribe to: Posts (Atom).

ryanhomesvld.com ryanhomesvld.com

Ryanhomesvld.com

This domain may be for sale. Backorder this Domain. This Domain Name Has Expired - Renewal Instructions.