hansandsandy.blogspot.com
additions and renovations: October 2008
http://hansandsandy.blogspot.com/2008_10_01_archive.html
Wednesday, October 29, 2008. Things, of importance, I didn't show you in last blog. The frig installed to make it look. TV to go on the top half of this cabinet, cd's and dvd's in slots below. Electronic in lower left (home theater, am/fm digital radio that I got almost a year ago when a reward points program transpired which I was just several points away from having enough for the TV (another story/another time). Bottom right cabinet is for books or whatever. Posted by hans and sandy. Below the ovens i...
hansandsandy.blogspot.com
additions and renovations: June 2009
http://hansandsandy.blogspot.com/2009_06_01_archive.html
Monday, June 15, 2009. More renovations than just the house. Also note the trim, this will be what the rest of the trim will look like. The final room to get new hardwood flooring installed. All trim in this room and the other guest bedroom has been installed and rooms are now functional again. Several other tools that are required for a project like this. The pneumatic flooring nailer became invaluable and a gr8 assett. Knee pads should be owned by anyone who even may have to get up and down (th...In or...
hansandsandy.blogspot.com
additions and renovations: August 2008
http://hansandsandy.blogspot.com/2008_08_01_archive.html
Tuesday, August 26, 2008. Cabinets start being installed. Base cabinets were preliminarily 'dry fit' today to make sure they would fit the space. Grills were installed in the toe kicks for the HVAC systems return air. This 'kinda' shows the rear wall / island and oven tower cabinets. Jeff and his dad (the Brandt's) mounting the frig and pantry cabinets. The rear wall with frig temporarily placed. Posted by hans and sandy. Subscribe to: Posts (Atom). John and Janis living large in FL. R&R SLC and BEYOND.
hansandsandy.blogspot.com
additions and renovations: May 2008
http://hansandsandy.blogspot.com/2008_05_01_archive.html
Wednesday, May 7, 2008. The plumbers were here. Drain work under the new toilet and new location for the washer. New 3" pipe for the new half bath and relocated laundry. This will be extended into the kitchen addition once the island is in place. Just a shot of the two new vents through the roof for the new half bath (there already was one there for the old kitchen sink). They will not be noticable once we spray them flat black. New water outlet for new refrig's icemaker. Posted by hans and sandy. Here w...
hansandsandy.blogspot.com
additions and renovations: Vacation winds down / some appliances installed
http://hansandsandy.blogspot.com/2008/10/vacation-winds-down-some-appliances.html
Sunday, October 26, 2008. Vacation winds down / some appliances installed. The heat pump for the addition was commissioned this week and the new programmable thermostat and heat/air grills installed. It is nice to walk the entire length of the house (approximately 80') and not notice any temperature variation. Wiring has been finished to the breaker. Box and all prior electric work has been finished (there is no more extension cord powering the frig in the garage! Racks, cake pans, etc. R&R SLC and BEYOND.
hansandsandy.blogspot.com
additions and renovations: July 2008
http://hansandsandy.blogspot.com/2008_07_01_archive.html
Sunday, July 27, 2008. Kickin butt and kickin back on vacation the last two weeks. Don't get me wrong, we can do it. I am married to the best woman in the world and she loves to assist, it makes the project go so much faster when everyone is on the same page. I am so lucky and priveledged. Drawer units, refrigerator unit (upside down) and 9' corner pantry cabinet. This is the base of the built in china cabinet that will sit on the left of the fireplace. Posted by hans and sandy. Sunday, July 13, 2008.
hansandsandy.blogspot.com
additions and renovations: Tile goes down / more progress made
http://hansandsandy.blogspot.com/2008/10/tile-goes-down-more-progress-made.html
Saturday, October 18, 2008. Tile goes down / more progress made. This week I was on vacation and needed to get our rental in the country ready for the new renters b4 working on the kitchen project. Carpet was demoed from 2 nd. Full bath and replaced with linoleum, carpet was cleaned, all new blinds installed, new front porch light installed and yard was cleaned up and mowed. This is the saw that saved the day and weekend. Cuts tiles like butter. Tile cut (by the gr8 saw) around the island. One darling Ne...
hansandsandy.blogspot.com
additions and renovations: More renovations than just the house
http://hansandsandy.blogspot.com/2009/06/more-renovations-than-just-house.html
Monday, June 15, 2009. More renovations than just the house. Also note the trim, this will be what the rest of the trim will look like. The final room to get new hardwood flooring installed. All trim in this room and the other guest bedroom has been installed and rooms are now functional again. Several other tools that are required for a project like this. The pneumatic flooring nailer became invaluable and a gr8 assett. Knee pads should be owned by anyone who even may have to get up and down (th...In or...
hansandsandy.blogspot.com
additions and renovations: Functional by Thanksgiving, check that box
http://hansandsandy.blogspot.com/2008/11/last-night-buzz-and-ginny-came-over-and.html
Friday, November 21, 2008. Functional by Thanksgiving, check that box. Last night Buzz and Ginny came over and Buzz hooked up our cooktop to the natural gas line that was run prior. I also powered up the dishwasher and ice maker. The kichen, except for the garbage disposal, is all working. There is still a lot to do but nothing that can't get done by Christmas. Crown moulding up and new counter stools. Another pic of the type of stool, adjustable from 24" to 30" and will swivel. Icemaker wil new ice.
hansandsandy.blogspot.com
additions and renovations: Half Bath Functional
http://hansandsandy.blogspot.com/2008/12/half-bath-functional.html
Monday, December 8, 2008. The Christmas tree is up (pictures to follow in subsequent post when decorating is finished). Yahoo', (a cry of joy not the search engine) we have the 1/2 bath functional. This negates the need to walk approximately 75' from the new kitchen just in case nature calls. The room is quite small but the vanity allows for some storage and, even though a fantastic value, we think looks quite stunning. The working end of this area. Posted by hans and sandy. R&R SLC and BEYOND.