srt251arsa.blogspot.com
Construction and Structures 2: Site 2: Doherty's Road Laverton
http://srt251arsa.blogspot.com/2008/05/site-2-commercial-building-in-laverton.html
Construction and Structures 2. Sunday, May 4, 2008. Site 2: Doherty's Road Laverton. This building has internal stanchions supporting the structure due to its large span. I think its interesting how the stanchion is not embedded into the the concrete slab. Could this be because the height of the stanchion is so tall, further fixings such as bolts and welding need to be done before concrete is filled into the space in order to increase its overall stability? 2A - 2008 - Angela Saliba.
srt251arsa.blogspot.com
Construction and Structures 2: April 2008
http://srt251arsa.blogspot.com/2008_04_01_archive.html
Construction and Structures 2. Sunday, April 27, 2008. Article 7: BlueScope Steel Case Study 2. Steel Decking A Money Saver At Morayfield. Http:/ www.bluescopesteel.com.au/go/case-study/steel-decking-a-money-saver-at-morayfield. This case study is very similar to the previous case study, but it talks about the benefits of a different steel product for a different form of construction. In this case, focus is placed on steel formwork. And its huge money savings. Project Size: 20,000 square metre extensions.
srt251arsa.blogspot.com
Construction and Structures 2: MAJOR PROJECT POSTERS
http://srt251arsa.blogspot.com/2008/06/major-project-posters.html
Construction and Structures 2. Tuesday, June 3, 2008. CONCRETE PANEL CONNECTED TO SUSPENDED CONCRETE FLOOR. 2A - 2008 - Angela Saliba. Subscribe to: Post Comments (Atom). 2A - 2008 - Angela Saliba. View my complete profile.
srt251arsa.blogspot.com
Construction and Structures 2: March 2008
http://srt251arsa.blogspot.com/2008_03_01_archive.html
Construction and Structures 2. Friday, March 21, 2008. Tutorial Excericise 3: Portal Frame Detail. 2A - 2008 - Angela Saliba. Tuesday, March 18, 2008. Tutorial Excercise 2: Portal Frame Detail. 2A - 2008 - Angela Saliba. Tuesday, March 11, 2008. Tutorial Excercise 1: Commercial Building Annalysis. Picture One: Exterior of Building. Element: Structural Universal Beam/Column. This picture shows the internal structure or Portal Frame of Spotlight Australia. The Portal Frame structure is very important as it:.
srt251arsa.blogspot.com
Construction and Structures 2: June 2008
http://srt251arsa.blogspot.com/2008_06_01_archive.html
Construction and Structures 2. Tuesday, June 3, 2008. CONCRETE PANEL CONNECTED TO SUSPENDED CONCRETE FLOOR. 2A - 2008 - Angela Saliba. Subscribe to: Posts (Atom). 2A - 2008 - Angela Saliba. View my complete profile.
srt251arsa.blogspot.com
Construction and Structures 2: Site 4: Deakin University Extension Geelong
http://srt251arsa.blogspot.com/2008/05/site-4-deakin-university-extension.html
Construction and Structures 2. Sunday, May 4, 2008. Site 4: Deakin University Extension Geelong. The stanchion is coated with a special white fire resistant enamel/paint. To further increase the stability. This image shows temporary props fixed to a concrete column. I thought this was an interesting image, as it appears that a pad footing is embedded into the walling/brickwork. 2A - 2008 - Angela Saliba. Its good to see how the connections of the steelwork are extensively covered in your images, good work.
srt251arsa.blogspot.com
Construction and Structures 2: May 2008
http://srt251arsa.blogspot.com/2008_05_01_archive.html
Construction and Structures 2. Sunday, May 4, 2008. Site 4: Deakin University Extension Geelong. The stanchion is coated with a special white fire resistant enamel/paint. To further increase the stability. This image shows temporary props fixed to a concrete column. I thought this was an interesting image, as it appears that a pad footing is embedded into the walling/brickwork. 2A - 2008 - Angela Saliba. Site 3: Geringhap Street Geelong. Cast Concrete Panels with suspended Concrete Floors. These fixings ...
srt251arsa.blogspot.com
Construction and Structures 2: Site 1: Doherty's Road Laverton
http://srt251arsa.blogspot.com/2008/05/site-1-commercial-building-in.html
Construction and Structures 2. Sunday, May 4, 2008. Site 1: Doherty's Road Laverton. Boxing for Tilt-Up Panels are. Arranged. (Corner/Angle Bars). Steel Reinforcement for Panels. Triangular Steel supports stabilising the wooden boxing. Steel Reinforcement positioned and ready for Concrete Pour. Blue connections act as a connection that allows the panel to be lifted (furruls). Sheet mesh, bar-chairs, and corner/angle bars. The gaps in the concrete are designed to firmly place the tilt-up panels. The left ...
srt251arsa.blogspot.com
Construction and Structures 2: Site 3: Geringhap Street Geelong
http://srt251arsa.blogspot.com/2008/05/site-3-geringhap-street-geelong.html
Construction and Structures 2. Sunday, May 4, 2008. Site 3: Geringhap Street Geelong. Cast Concrete Panels with suspended Concrete Floors. Temporary rails for safety. For suspended concrete flooring. Protruding steel under panels to stabilise, hold them in place, and easily position them. May be used to lift the panels( Connects. Square column with exposed steel reinforcement. Too connect the roof materials, ceiling or next suspended. Concrete floor to the column. 2A - 2008 - Angela Saliba.