building-the-new-house.blogspot.com
Building The New House: December 2006
http://building-the-new-house.blogspot.com/2006_12_01_archive.html
Building The New House. Saturday, December 30, 2006. Two subcontractors from European Lathing and Plastering. Were working at the job site this afternoon putting the finishing touches on the layer of building paper and metal mesh. Two areas they won't be able to complete until next week are (1) the wall above the window seat (because the sheet metal installer from Bonanza Heating and Air Conditioning. Has not finished installing the window seat roof yet). Posted by David @ 2:00 PM. Links to this post.
building-the-new-house.blogspot.com
Building The New House: November 2006
http://building-the-new-house.blogspot.com/2006_11_01_archive.html
Building The New House. Thursday, November 30, 2006. We met with Brad. At the job site this afternoon and we talked about several issues:. 1 We gave Brad a brochure from Masonite. To show him the door style we like - a 2 panel Roman in a smooth finish. 2 We asked Brad to provide 220V to the stackable washer/dryer in the second floor bathroom. 3 Brad said John Ou. Is close to getting him a solution to the structural problem with the stacked Simpson Strong-Walls. Posted by David @ 3:00 PM. Brad also pointe...
building-the-new-house.blogspot.com
Building The New House: July 2006
http://building-the-new-house.blogspot.com/2006_07_01_archive.html
Building The New House. Monday, July 31, 2006. At the job site this afternoon. The crew from Jim Giancola Concrete. Was just finishing up - picking up all the loose nails and scraps of wire on the floor of the basement with a magnet. They were also putting a ribbon of Greenstreak PVC Waterstop. Around the edge of the forms. This material will be embedded halfway in the structural slab and halfway in the middle of the basement walls. Yet another layer of waterproofing material for added redundancy. Brad w...
building-the-new-house.blogspot.com
Building The New House: August 2006
http://building-the-new-house.blogspot.com/2006_08_01_archive.html
Building The New House. Thursday, August 31, 2006. We met with Brad. At the job site this afternoon. One of the four concrete samples, taken by DCI. In the meantime, the crew from Jim Giancola Concrete has finished removing all of the plywood from the inside of the basement walls. And Waterproofing Associates has started applying the first of two layers of Tremco. Waterproofing membrane. After that, they'll be attaching Volclay Ultraseal to the walls. Posted by David @ 3:00 PM. Links to this post. This m...
building-the-new-house.blogspot.com
Building The New House
http://building-the-new-house.blogspot.com/2007/06/we-saw-brad-at-job-site-this-morning.html
Building The New House. Tuesday, June 19, 2007. At the job site this morning and he told us the final re-inspection will be tomorrow morning. I think we'll pass this time because everything on the list from the first final inspection will be completed by tomorrow. In the afternoon, I met Ekrem at the job site. He had to torque down the bolts in the electrical panels. I also mentioned the fireplace outlet and he hooked it up. I need to ask Brad to get West Coast Insulation. Posted by David @ 2:00 PM.
building-the-new-house.blogspot.com
Building The New House: May 2006
http://building-the-new-house.blogspot.com/2006_05_01_archive.html
Building The New House. Tuesday, May 09, 2006. Here is a series of pictures showing the empty lot. This was before the Baker tank was installed and before the wells were dug for the sump pumps. Posted by David @ 6:00 PM. Links to this post. Granite Rock - Concrete. Dynamic Consultants, Inc. West Coast Insulation, Inc. Adanac Fire Protection, Inc. SCM Plumbing, Inc. email. CB Electric Co. (website coming soon). Burgess Hill Fine Custom Cabinets. Bonanza Heating and Air Conditioning. The Wood Floor Company.
building-the-new-house.blogspot.com
Building The New House: June 2006
http://building-the-new-house.blogspot.com/2006_06_01_archive.html
Building The New House. Thursday, June 29, 2006. Although the plans don't call for them, we seem to have two swimming pools in the basement. Well, what do you expect? We are digging below the water table. Posted by David @ 8:00 PM. Links to this post. Monday, June 26, 2006. The basement is almost completely excavated now. You can see that we have some minor water to deal with. The last step for the excavator is to build a ramp so they can move machinery into and out of the pit. Posted by David @ 4:00 PM.
buildinglab.com
who we like — building Lab
http://www.buildinglab.com/who-we-like
We should note that this is not a comprehensive list of everyone or everything we like. If you have not made the list (yet) please do not take offense and don't hesitate to bring it to our attention! Landscaping 510.292.3000. Flexible Wood Sheet 510.307.5693. Hardware 510.532.1188. Hardware 510.548.5757. Ceramic Tile Design, San Francisco. Tile 415.575.3785. Ceramic Tile Design, San Rafael. Tile 415.485.5180. Electrical Supply 415.863.2020. Tile 510.635.7673. Tile 415.332.3732. Marme West Tile and Stone.
building-the-new-house.blogspot.com
Building The New House: October 2006
http://building-the-new-house.blogspot.com/2006_10_01_archive.html
Building The New House. Tuesday, October 31, 2006. The carpenters from KC Construction are starting to put the plywood on top of the rafters. Their goal is to be done by tomorrow. This picture is a closeup of the exposed eaves. All American Scaffold, Inc. Is continuing to put up scaffolding around the house. Posted by David @ 10:00 AM. Links to this post. Monday, October 30, 2006. As you can see, the house is really starting to take shape! All American Scaffold, Inc. I talked to Brad. At the job site....