deuceswildsailing.blogspot.com
Deuces Wild Sailing
http://deuceswildsailing.blogspot.com/2009/01/we-worked-at-fairly-fast-clip-with-tide.html
Thursday, January 22, 2009. We worked at a fairly fast clip with the tide starting to fall and the boat tied up to a concrete wall. As we got the engine in position we realized it was tighter than planned. The wrenches started working and parts began falling away and I remember saying "where did that just come from? So from this to that:). Amazing what happens when you spend time and money. Subscribe to: Post Comments (Atom). Check out these blogs. We worked at a fairly fast clip with the tide s.
deuceswildsailing.blogspot.com
Deuces Wild Sailing: January 2009
http://deuceswildsailing.blogspot.com/2009_01_01_archive.html
Thursday, January 22, 2009. I was asked if there are any inside photos so here are a couple from when we bought it. It will get way better. We worked at a fairly fast clip with the tide starting to fall and the boat tied up to a concrete wall. As we got the engine in position we realized it was tighter than planned. The wrenches started working and parts began falling away and I remember saying "where did that just come from? So from this to that:). Amazing what happens when you spend time and money.
deuceswildsailing.blogspot.com
Deuces Wild Sailing: October 2009
http://deuceswildsailing.blogspot.com/2009_10_01_archive.html
Thursday, October 1, 2009. Subscribe to: Posts (Atom). Check out these blogs. Well its been awhile since we did this sight so I. View my complete profile.
deuceswildsailing.blogspot.com
Deuces Wild Sailing: January 2011
http://deuceswildsailing.blogspot.com/2011_01_01_archive.html
Monday, January 3, 2011. Saturday, January 1, 2011. Jan 1 2011 Happy New Year! I have decided to re-activate the Log for Double Deuce. We have spent many months re fitting and thankfully using the boat. We will be posting many new stories and photos from last year as well as the new on going things with the beast. We have stories of Bow thruster , gen set , Furnace installs Bulk heads cut out and move Fuel tanks the list is long and the new year promises to be a good one. Subscribe to: Posts (Atom).
deuceswildsailing.blogspot.com
Deuces Wild Sailing
http://deuceswildsailing.blogspot.com/2011/01/radar-arch-in-early-2010-we-started.html
Monday, January 3, 2011. December 30, 2012 at 9:16 PM. When you have to make a choice of boat accessories and marine electronics it’s always better that you start with procuring those items that are vital to your boats safety and proper operation. Subscribe to: Post Comments (Atom). Check out these blogs. Radar Arch In early 2010 we started building . Jan 1 2011 Happy New Year! I have decided to. View my complete profile.
deuceswildsailing.blogspot.com
Deuces Wild Sailing: Layout
http://deuceswildsailing.blogspot.com/2009/01/layout.html
Thursday, January 22, 2009. I was asked if there are any inside photos so here are a couple from when we bought it. It will get way better. Subscribe to: Post Comments (Atom). Check out these blogs. We worked at a fairly fast clip with the tide s. As I look at these events unfolding I find myself. Engines who needs one. So we bought this boat knowing full well that the. View my complete profile.
deuceswildsailing.blogspot.com
Deuces Wild Sailing: Just a hole or two
http://deuceswildsailing.blogspot.com/2009/02/just-hole-or-two.html
Tuesday, February 24, 2009. Just a hole or two. So I cut the old 1.25" shaft with a re cip saw because the shaft brake coupling was seized to it. 5 metal blades later and 45 min. of sweating and language issues , just like that it was cut. took out the shaft measurement done Check 1 next remove thru hulls 3 but decided to remove 5 (I was filling and fairing anyway) A friend from work (Dan) asked if I needed help? How are you with a grinder? March 1, 2009 at 9:17 AM. Any water in the bilge?
deuceswildsailing.blogspot.com
Deuces Wild Sailing
http://deuceswildsailing.blogspot.com/2009/11/so-we-are-just-putting-finishing.html
Thursday, November 5, 2009. So we are just putting the finishing touches on the aft head. Head all the plumbing lines. New holding tank this part was really fu when we discovered that the macerator was hooped and the tank was full and had been for afew years. Of course this wasn't actually discovered until the lines were loosened off. (Yep thats the right mind image. exactly). We have continued with so many projects I cant even remember half of them it is a complete blurr. Labels: Aft Head redo.
deuceswildsailing.blogspot.com
Deuces Wild Sailing
http://deuceswildsailing.blogspot.com/2009/10/well-its-been-awhile-since-we-did-this.html
Thursday, October 1, 2009. Subscribe to: Post Comments (Atom). Check out these blogs. Well its been awhile since we did this sight so I. View my complete profile.