58rhino.blogspot.com 58rhino.blogspot.com

58rhino.blogspot.com

Rhino, '58 Rybovich Cabin Cruiser

Rhino, '58 Rybovich Cabin Cruiser. Sunday, May 12, 2013. Sealing with Pettit 2018 Clear Sealer. The process for applying the Pettit 2018 Clear Sealer. The look of the rails improved significantly. The next step will be to lightly sand the cured clear coat, and apply the first coat of Epifanes varnish. After the first coat of Epifanes goes on this "damaged area" of the toerails, I will begin to incorporate the balance of the toerails in rejuvenating the brightwork. Looking over the bow. The picture below ...

http://58rhino.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR 58RHINO.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

November

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Monday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 3.8 out of 5 with 6 reviews
5 star
1
4 star
3
3 star
2
2 star
0
1 star
0

Hey there! Start your review of 58rhino.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

0.3 seconds

FAVICON PREVIEW

  • 58rhino.blogspot.com

    16x16

  • 58rhino.blogspot.com

    32x32

  • 58rhino.blogspot.com

    64x64

  • 58rhino.blogspot.com

    128x128

CONTACTS AT 58RHINO.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Rhino, '58 Rybovich Cabin Cruiser | 58rhino.blogspot.com Reviews
<META>
DESCRIPTION
Rhino, '58 Rybovich Cabin Cruiser. Sunday, May 12, 2013. Sealing with Pettit 2018 Clear Sealer. The process for applying the Pettit 2018 Clear Sealer. The look of the rails improved significantly. The next step will be to lightly sand the cured clear coat, and apply the first coat of Epifanes varnish. After the first coat of Epifanes goes on this damaged area of the toerails, I will begin to incorporate the balance of the toerails in rejuvenating the brightwork. Looking over the bow. The picture below ...
<META>
KEYWORDS
1 bow shot
2 posted by
3 brian milby
4 no comments
5 email this
6 blogthis
7 share to twitter
8 share to facebook
9 share to pinterest
10 staining toerail
CONTENT
Page content here
KEYWORDS ON
PAGE
bow shot,posted by,brian milby,no comments,email this,blogthis,share to twitter,share to facebook,share to pinterest,staining toerail,bow rail post stain,starboard material removal,older posts,about me,blog archive
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Rhino, '58 Rybovich Cabin Cruiser | 58rhino.blogspot.com Reviews

https://58rhino.blogspot.com

Rhino, '58 Rybovich Cabin Cruiser. Sunday, May 12, 2013. Sealing with Pettit 2018 Clear Sealer. The process for applying the Pettit 2018 Clear Sealer. The look of the rails improved significantly. The next step will be to lightly sand the cured clear coat, and apply the first coat of Epifanes varnish. After the first coat of Epifanes goes on this "damaged area" of the toerails, I will begin to incorporate the balance of the toerails in rejuvenating the brightwork. Looking over the bow. The picture below ...

INTERNAL PAGES

58rhino.blogspot.com 58rhino.blogspot.com
1

Rhino, '58 Rybovich Cabin Cruiser: Roughing Out and Fitting the Dutchman Patches

http://www.58rhino.blogspot.com/2013/03/roughing-out-and-fitting-dutchman.html

Rhino, '58 Rybovich Cabin Cruiser. Sunday, March 31, 2013. Roughing Out and Fitting the Dutchman Patches. At the same time I roughed out the port and starboard material, I roughed out the small, 3" x 5" bow piece. Total time spent in the shop was about an hour. The port and bow pieces settling into their new homes. More work is required to get the patches in place, and prior to beginning the staining, sealing, and numerous coats of varnish. March 29th, 2013 - Total Time 4.5 hrs. View my complete profile.

2

Rhino, '58 Rybovich Cabin Cruiser: Staining Toerail

http://www.58rhino.blogspot.com/2013/05/on-7th-of-may-i-applied-trial-run-on.html

Rhino, '58 Rybovich Cabin Cruiser. Sunday, May 12, 2013. Back on the 7th of May, I applied a trial run on the staining, thinking that some of the smaller voids would be filled with this product - Interlux Interstain. Until you get a paint consistency that is closer to water in viscosity. Again, bow rail post-stain. The picture below shows the forward portion of the starboard toerail after application of Interlux Interstain. The picture below shows the aft portion of the damaged starboard toerail after ap...

3

Rhino, '58 Rybovich Cabin Cruiser: Setting the Bow and Port Dutchman Patches

http://www.58rhino.blogspot.com/2013/04/setting-bow-and-port-dutchman-patches.html

Rhino, '58 Rybovich Cabin Cruiser. Saturday, April 13, 2013. Setting the Bow and Port Dutchman Patches. April 9th, 2013 - Total Time .75 hrs. And 406 colloidal silica. Once I had enough of the thickened mixture placed in the void, I set the dutchman with a rubber mallet, working the piece into the void for a tight fit. Picture below shows the port dutchman set. Another view of the port dutchman patch. April 10th, 2013 - Total Time 3 hrs. Subscribe to: Post Comments (Atom). View my complete profile.

4

Rhino, '58 Rybovich Cabin Cruiser: Toerail Material Removal at Bow

http://www.58rhino.blogspot.com/2013/03/toerail-material-removal-at-bow.html

Rhino, '58 Rybovich Cabin Cruiser. Sunday, March 31, 2013. Toerail Material Removal at Bow. Sealed, and then varnished to match the balance of Rhino's toe and handrails. The work day was cut short due to inclement weather settling in - see raindrops on the rail. Another view of this bow section. Again, the remaining checking will be filled in order to seal off and prepare for varnishing. March 23rd, 2013 - Total Time 1/2 hour. Subscribe to: Post Comments (Atom). View my complete profile.

5

Rhino, '58 Rybovich Cabin Cruiser: Sealing with Pettit 2018 Clear Sealer

http://www.58rhino.blogspot.com/2013/05/sealing-with-pettit-2018-clear-sealer.html

Rhino, '58 Rybovich Cabin Cruiser. Sunday, May 12, 2013. Sealing with Pettit 2018 Clear Sealer. The process for applying the Pettit 2018 Clear Sealer. The look of the rails improved significantly. The next step will be to lightly sand the cured clear coat, and apply the first coat of Epifanes varnish. After the first coat of Epifanes goes on this "damaged area" of the toerails, I will begin to incorporate the balance of the toerails in rejuvenating the brightwork. Looking over the bow.

UPGRADE TO PREMIUM TO VIEW 5 MORE

TOTAL PAGES IN THIS WEBSITE

10

LINKS TO THIS WEBSITE

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: Work Completed

http://awee1.blogspot.com/2015/04/work-completed.html

Wednesday, April 1, 2015. March 29, 2015. Work has come to completion on the custom sailing dinghy. Work included fabricating new brightwork for the dinghy, prepping bottom and topsides for eventual paint, priming bottom and topsides, and applying topcoat paint to the bottom and topsides. Color choice, along with the new teak brightwork, came out looking really nice. Subscribe to: Post Comments (Atom). Westsail 32 Hull #667. Hull # 667 Moves On (with some sadness). Rhino, '58 Rybovich Cabin Cruiser.

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: September 2014

http://awee1.blogspot.com/2014_09_01_archive.html

Monday, September 29, 2014. Top and bottom, various views of the rails finish sanded through 220 grit. Below, the aft port and starboard rub rails with extra length trimmed and finished sanded through 220 grit. Total Time: 3 Hrs. Tuesday, September 23, 2014. Finished Brightwork Removal / Begin Paint Prep. Sorry, no pics today! Total Time: 2 Hrs. Sunday, September 14, 2014. The bow thwart, interior rails, and rub rails "coming together". Looking more and more like a finished product! Once the rub rails we...

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: Oiling Brightwork

http://awee1.blogspot.com/2015/01/oiling-brightwork.html

Saturday, January 24, 2015. January 18, 2015. With the painting of the hull complete, I was now ready to return to the brightwork. The time had come to treat the teak wood with a sealer / preserver. The owner had decided against a varnish for the brightwork, but the teak would need some conditioning and protection from the tough FL environment - chiefly UV protection. Periodic application will serve to prolong the life of the sailing dinghy's new brightwork. Total Time: .5 Hr. Westsail 32 Hull #667.

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: March 2015

http://awee1.blogspot.com/2015_03_01_archive.html

Sunday, March 29, 2015. Final Assembly and Mast Thwart Install. March 29, 2015. Pictured above and below, the stern of the sailing dinghy in its completed phase. The sailing dinghy looking a bit younger in years. Total Time: 7.5 Hrs. Subscribe to: Posts (Atom). Westsail 32 Hull #667. Hull # 667 Moves On (with some sadness). Rhino, '58 Rybovich Cabin Cruiser. Sealing with Pettit 2018 Clear Sealer. Move and Launch of the Froon. View my complete profile. Final Assembly and Mast Thwart Install.

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: Second Topcoat Application

http://awee1.blogspot.com/2014/12/second-topcoat-application.html

Saturday, December 20, 2014. December 20, 2014. I worked my way around the dinghy admittedly still struggling with poor lighting conditions. As a result, the sanding is a bit of a spastic battle trying to see a particular portion of the surface from a few different angles to catch imperfections. Over the next two coats, I will arrange additional work lights to improve visible imperfections. The picture below is after sanding with 320-grit paper. Total Time: 1.5 Hrs. Subscribe to: Post Comments (Atom).

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: November 2014

http://awee1.blogspot.com/2014_11_01_archive.html

Sunday, November 30, 2014. First Coat of Primer. November 30, 2014. After vacuuming most the sanding dust, I wiped the surfaces with a solvent to remove the balance of the residue from sanding. After cleaning the surface with solvent, I moved to taping off the two areas that needed protection: the centerboard and the bow eye. The primer and paint being used in this dinghy restoration is Alexseal. Total Time: 2.75 Hrs. Saturday, November 29, 2014. Repositioning for Paint (Final Fill and Fair). With the re...

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: July 2014

http://awee1.blogspot.com/2014_07_01_archive.html

Sunday, July 20, 2014. I set aside a couple hours on Sunday (7/20) to work on the port stern thwart. I started with a scrap of cardboard and traced the sheer line onto it. While I was at it, I went ahead and prepared a template for the starboard side as well; though my attention was devoted to the thwart on the port side today. Next, I carefully trimmed along the outline of the sheer. And took it to the boat to test its fit. Total Time: 2.5 Hrs. Monday, July 7, 2014. Over the 4th weekend, I stole an hour...

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: Fourth Topcoat Application

http://awee1.blogspot.com/2015/01/fourth-topcoat-application.html

Tuesday, January 13, 2015. January 10, 2015. After mixing the topcoat base and converter, I added the reducer - thinning the base and converter volume by about 45% (higher than what the Alexseal technical data sheet called for). As I awaited the required 15 minute induction period, I applied the tack cloth one final time and then donned my respirator and fresh gloves. Total Time: 1 Hour. Subscribe to: Post Comments (Atom). Westsail 32 Hull #667. Hull # 667 Moves On (with some sadness).

awee1.blogspot.com awee1.blogspot.com

Sailing Dinghy: December 2014

http://awee1.blogspot.com/2014_12_01_archive.html

Monday, December 29, 2014. December 28th, 2014. With the Christmas festivities beginning to settle a bit, I made an early morning bee-line to the dinghy for her third topcoat application. Actually, the evening before, I took to sanding the hull in preparation for this early morning application. The sanding was by hand and done with 320-grit paper. I had added another work light to help to better see the hull surfaces. The next three photos are post-sanding. Total Time: 1 Hr. Saturday, December 20, 2014.

UPGRADE TO PREMIUM TO VIEW 25 MORE

TOTAL LINKS TO THIS WEBSITE

34

OTHER SITES

58republic.com 58republic.com

Art Prints, Cards, Posters, Feed Bags, Czichens, Chicken - 58 REPUBLIC

And Terms of Service.

58rescue2.tripod.com 58rescue2.tripod.com

HIGHWAY 58 FIRE DEPARTMENT STATION 2

HIGHWAY 58 FIRE DEPARTMENT STATION 2. GO HOME WE GOT IT ". Shane M. Daughetee. December 21, 1982 - January 26, 2007. Thank You To All Those Who Have Visited This Site. TO EVERYONE WITH THE HIGHWAY 58 FIRE DEPT. WE WANT TO THANK YOU,. WITHOUT YOU WE COULD NOT. Our prayers will always be with you. Dick and Linda Daughetee. RESIDENTTIAL STRUCTURE FIRE 5-20-2005. HIGHWAY 58 was toned out for a residential structure fire @ 0215 hours on Dollypond Rd. in Station 4's district. Units from all 4 stations were.

58resort.com.tw 58resort.com.tw

谷巴休閒渡假村

谷巴休閒渡假村 Phone 037-543945 Fax 037-540338 苗栗縣造橋鄉造橋村過港坪8-6號. Designed By: Chung.G. Web hosting: Bonkids.ws.

58rexroth.com 58rexroth.com

力士乐液压泵_力士乐柱塞泵_力士乐油泵-力士乐总代理-力士乐服务公司

销售旋挖钻用主卷扬力士乐GFT60、80、110减速机、维修力士乐减速机液压泵、马达.并承接旋挖钻大修业务.并为广大用户提供力士乐减速机GFT80GFT60GF110GF17.旋挖钻动力头马达旋挖钻动力头减速机零件,质量上乘,价格便宜公道。

58rfpjjy.biz 58rfpjjy.biz

www.58rfpjjy.biz – このドメインはお名前.comで取得されています。

58rhino.blogspot.com 58rhino.blogspot.com

Rhino, '58 Rybovich Cabin Cruiser

Rhino, '58 Rybovich Cabin Cruiser. Sunday, May 12, 2013. Sealing with Pettit 2018 Clear Sealer. The process for applying the Pettit 2018 Clear Sealer. The look of the rails improved significantly. The next step will be to lightly sand the cured clear coat, and apply the first coat of Epifanes varnish. After the first coat of Epifanes goes on this "damaged area" of the toerails, I will begin to incorporate the balance of the toerails in rejuvenating the brightwork. Looking over the bow. The picture below ...

58ri.com 58ri.com

域名过期提示信息

58riben.com 58riben.com

58日本华人信息网 - 免费的华人信息发布平台

58rice.com 58rice.com

[养生有稻

58rimm.pw 58rimm.pw

58rimm.pw