Wisdom Home in Shell Cove (Manhattan 38). Our experience building a Wisdom Home Manhattan 38 Ensuite. Monday, 8 August 2011. The plumber came and installed all of the other toilets and dug up the front yard and connected into the sewer. Never thought I would be so excited to flush a toilet! An easy fix but glad our SS in on top of things, could of been really nasty. Posted by Shell Cove Dream Home. 22 November 2012 at 03:55. We enjoy reading it. Subscribe to: Post Comments (Atom). Our Wisdom Majestic 35.
shellcovedream.blogspot.com
Wisdom Home in Shell Cove (Manhattan 38): 28.7.11 - Cleaners
http://shellcovedream.blogspot.com/2011/08/28711-cleaners.html
Wisdom Home in Shell Cove (Manhattan 38). Our experience building a Wisdom Home Manhattan 38 Ensuite. Monday, 8 August 2011. Posted by Shell Cove Dream Home. Subscribe to: Post Comments (Atom). Our Wisdom Majestic 35. VeggieTales: Celery Night Fever (2014). Final occupancy certificate, pools and puppies! Building a Wisdom Homes Impression 38 MK II - Sovereign. Bright LED Down lighting. Metricon Newhaven at Oceanic Links Shell Cove. Now, don't get too excited. but. Building with Wisdom Homes.
ourplantationsahara.blogspot.com
Our Plantation Sahara: July 2011
http://ourplantationsahara.blogspot.com/2011_07_01_archive.html
Saturday, July 23, 2011. Spotted gum decking used to tie in with our floors inside. Next project . pergola. Subscribe to: Posts (Atom). Gas final fit-off complete. Render and paint completed. Doors / skirtings / architraves installed. Electrical and data rough in complete. Gas rough in complete. Windows and external doors installed. Plumbing rough in complete. For Construction' drawings completed. Post contract variations completed. Builder selected (Plantation Homes). Offer accepted on land.
ourplantationsahara.blogspot.com
Our Plantation Sahara: May 2011
http://ourplantationsahara.blogspot.com/2011_05_01_archive.html
Friday, May 6, 2011. Well we have officially been living in the house for the past 2 months! It has gone so fast. There is a lot to report so here are a few pics of what we have been up to:. Front landscaping is well under way (a whole lot of turf and not much else). The letterbox, feature side fence/gate and porch deck have been completed. Gardens are yet to come. Light fittings went in over the Easter weekend (thanks Dad). In Newstead. The glass pool fences were installed this week we are still wai...
buildingourdream.wordpress.com
Merry Christmas! | Building Our Dream
https://buildingourdream.wordpress.com/2011/12/27/merry-christmas
13 week maintenance inspection →. December 27, 2011. Our first Christmas in our new home has been fantastic! Even with the continuous rain (which thankfully let up for Christmas Day and most of Boxing Day) nothing could dampen our spirits when we woke on Christmas morning. Santa may have left lots of gifts under the tree for the kids, but the best gift of all was our new home! We have decided to put in a pool! That, I guess, is the biggest news! So now we have a week off before we have to go back to work...
shellcovedream.blogspot.com
Wisdom Home in Shell Cove (Manhattan 38): 30.7.11 - Driveway
http://shellcovedream.blogspot.com/2011/08/30711-driveway.html
Wisdom Home in Shell Cove (Manhattan 38). Our experience building a Wisdom Home Manhattan 38 Ensuite. Monday, 8 August 2011. Daniel from DRH landscaping came down and scrapped out the driveway and prepaid the alfresco ready for the concrete. He was such a nice guy and didn't hesitate to help you out. We told him how hard it was to get concretors out for a quote and said, 'No problem I will give you a price now and have it done before you move in'. Job solved. Highly recommended! Our Wisdom Majestic 35.
shellcovedream.blogspot.com
Wisdom Home in Shell Cove (Manhattan 38): August 2011
http://shellcovedream.blogspot.com/2011_08_01_archive.html
Wisdom Home in Shell Cove (Manhattan 38). Our experience building a Wisdom Home Manhattan 38 Ensuite. Tuesday, 9 August 2011. Our driveway and alfresco got poured yesterday and the rest of the concreting will be done on 8.8.11. The guys did a wonderful job and were very efficient. Our carpet was still being done and he told us that the extra carpet required will be coming on Friday so he can complete it. I will take some photos when we move in and you can see the final product. Monday, 8 August 2011.
ourplantationsahara.blogspot.com
Our Plantation Sahara: December 2010
http://ourplantationsahara.blogspot.com/2010_12_01_archive.html
Monday, December 27, 2010. Post Christmas Activity - Joinery and tiles. We got back from holidays yesterday so we were eager to head out to the house today and see what had happened during plantations last week before Xmas shutdown. We were resigned to the fact that we would probably only be able to peer through the windows as the place would most likely be locked up. Laundry cabinets are Laminex 'oyster linea' in silk finish and the top is in 'peruvian clay'. Ensuite (the guy was working in here). The b...
ourplantationsahara.blogspot.com
Our Plantation Sahara: Handover and flooring
http://ourplantationsahara.blogspot.com/2011/03/handover-and-flooring.html
Sunday, March 6, 2011. Well it has been a very busy week since our handover last Monday. Its is a very nice feeling to have those keys in hand. Overall we are quite happy with the house a few little defects came out of the handover inspection but they should all be rectified by the end of this week. This is the week of the big move! March 6, 2011 at 2:53 AM. Your timber flooring looks amazing! Makes me want to think twice about our stone tiles! Haha (although we are getting timber in our bedrooms! Buildi...
ourplantationsahara.blogspot.com
Our Plantation Sahara: March 2011
http://ourplantationsahara.blogspot.com/2011_03_01_archive.html
Sunday, March 6, 2011. Well it has been a very busy week since our handover last Monday. Its is a very nice feeling to have those keys in hand. Overall we are quite happy with the house a few little defects came out of the handover inspection but they should all be rectified by the end of this week. This is the week of the big move! Subscribe to: Posts (Atom). Gas final fit-off complete. Render and paint completed. Doors / skirtings / architraves installed. Electrical and data rough in complete.