wates-burgh-mill-gardens.blogspot.com wates-burgh-mill-gardens.blogspot.com

WATES-BURGH-MILL-GARDENS.BLOGSPOT.COM

Burgh Mill Gardens

Monday, 22 April 2013. External groundworks are now underway with the installation of Drainage and Statutory services to the plots. Can we please ask all local residents to remind their children to not enter the site on a evenings and weekends. Thank you. Friday, 5 April 2013. Drainage works have progressed well this week, along with the commencement of the last two retaining walls which will then form the car park along the front of the flats. Wednesday, 13 March 2013. Monday, 4 March 2013. First fix bo...

http://wates-burgh-mill-gardens.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR WATES-BURGH-MILL-GARDENS.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

September

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Sunday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 3.3 out of 5 with 12 reviews
5 star
1
4 star
5
3 star
4
2 star
0
1 star
2

Hey there! Start your review of wates-burgh-mill-gardens.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

1.1 seconds

FAVICON PREVIEW

  • wates-burgh-mill-gardens.blogspot.com

    16x16

  • wates-burgh-mill-gardens.blogspot.com

    32x32

  • wates-burgh-mill-gardens.blogspot.com

    64x64

  • wates-burgh-mill-gardens.blogspot.com

    128x128

CONTACTS AT WATES-BURGH-MILL-GARDENS.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Burgh Mill Gardens | wates-burgh-mill-gardens.blogspot.com Reviews
<META>
DESCRIPTION
Monday, 22 April 2013. External groundworks are now underway with the installation of Drainage and Statutory services to the plots. Can we please ask all local residents to remind their children to not enter the site on a evenings and weekends. Thank you. Friday, 5 April 2013. Drainage works have progressed well this week, along with the commencement of the last two retaining walls which will then form the car park along the front of the flats. Wednesday, 13 March 2013. Monday, 4 March 2013. First fix bo...
<META>
KEYWORDS
1 posted by
2 wates team
3 no comments
4 email this
5 blogthis
6 share to twitter
7 share to facebook
8 share to pinterest
9 older posts
10 or e mail
CONTENT
Page content here
KEYWORDS ON
PAGE
posted by,wates team,no comments,email this,blogthis,share to twitter,share to facebook,share to pinterest,older posts,or e mail,jodiewalker@wates co uk,blog archive,october
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Burgh Mill Gardens | wates-burgh-mill-gardens.blogspot.com Reviews

https://wates-burgh-mill-gardens.blogspot.com

Monday, 22 April 2013. External groundworks are now underway with the installation of Drainage and Statutory services to the plots. Can we please ask all local residents to remind their children to not enter the site on a evenings and weekends. Thank you. Friday, 5 April 2013. Drainage works have progressed well this week, along with the commencement of the last two retaining walls which will then form the car park along the front of the flats. Wednesday, 13 March 2013. Monday, 4 March 2013. First fix bo...

INTERNAL PAGES

wates-burgh-mill-gardens.blogspot.com wates-burgh-mill-gardens.blogspot.com
1

Burgh Mill Gardens: September 2012

http://www.wates-burgh-mill-gardens.blogspot.com/2012_09_01_archive.html

Tuesday, 25 September 2012. Once the concrete is cured, the bricklayers begin to construct the retaining wall. This here is the foundations of a mass masonry wall, which will step according to the land it is retaining and will alter between a reinforced concrete and mass masonry wall. With block and reinforcement in place, the brickwork is then laid. Whilst the retaining wall is being constructed, foundation trenches to the block of flats is excavated. Retaining wall is now complete. With the trench dug ...

2

Burgh Mill Gardens: February 2013

http://www.wates-burgh-mill-gardens.blogspot.com/2013_02_01_archive.html

Thursday, 7 February 2013. Timber staircases installed into position. With the timber frame structure fully erected and all flats enclosed the internal works can now commence. Below we have a ground floor flat where the party walls and ceilings have been insulated, with a vapour barrier then fixed over the insulated party wall. 65279; The party walls to the upper floor flats are insulated, with a vapour barrier then fixed over them, the loft insulation will be fixed once the ceiling is boarded.

3

Burgh Mill Gardens

http://www.wates-burgh-mill-gardens.blogspot.com/2013/03/the-external-fabric-of-dwellings-is-now.html

Wednesday, 13 March 2013. The external fabric of the dwellings is now complete, and the scaffold is due to be dismantled from Thursday 14th March. Note: only a member of this blog may post a comment. Subscribe to: Post Comments (Atom). Click above for more information on Wates Group Limited. Click above for more information on Kirklees Excellent Homes for Life. Our sites are registered with the Considerate Constructors Scheme. Click above for more information on the scheme.

4

Burgh Mill Gardens: January 2013

http://www.wates-burgh-mill-gardens.blogspot.com/2013_01_01_archive.html

Tuesday, 22 January 2013. With the roofs complete, each section is then lifted down allowing the timber frame joiners to erect and fix the first floor timber wall panels. Once complete the roof is then lifted and fixed into position. With the timber frame superstructure complete, the roofers begin to lath, felt and load out the roof. 65279; The roof is tiled and windows are installed, now the internal works can commence, beginning with the plaster boarding. Subscribe to: Posts (Atom).

5

Burgh Mill Gardens

http://www.wates-burgh-mill-gardens.blogspot.com/2013/03/with-metal-stud-walls-in-place-of-walls.html

Monday, 4 March 2013. 65279; Metal Frame studs to form ceiling void. 65279; Externally ,. The doors have been installed. With the superstructure brickwork now fully complete. Note: only a member of this blog may post a comment. Subscribe to: Post Comments (Atom). Click above for more information on Wates Group Limited. Click above for more information on Kirklees Excellent Homes for Life. Our sites are registered with the Considerate Constructors Scheme. Click above for more information on the scheme.

UPGRADE TO PREMIUM TO VIEW 11 MORE

TOTAL PAGES IN THIS WEBSITE

16

OTHER SITES

waterzuiveringsmiddel.nl waterzuiveringsmiddel.nl

JoHo : Vrijwilligerswerk, Betaald Werk, Verzekeringen, Stages & Reizen in het Buitenland

Uittreksels voor je werk. Werken in het buitenland. Lesgeven in het buitenland. Werken bij een ngo. Brief and CV voorbeeld. Profiel and cv aanmaken. Muziek and events promoten. Fair trade and kringloop. Voor lang of altijd naar het buitenland. Taal leren and communiceren. Als buitenlander naar Nederland. Bijdragen aan de World of JoHo. Gebruik maken van JoHo. Bijdrage vragen aan JoHo. Ga hier naar de nieuwste JoHo website. Jaarlijks tientallen euros besparen? Inloggen and jouw account. Logistiek manager ...

waterzwingz.com waterzwingz.com

WATERZ WINGZ | Home of the Weekend Hook Up!

The Weekend Hook Up! Water’z Wing’z Menu 2015. Welcome to Waterz Wingz! The Weekend Hookup August 14-16, 2015. Our secret baked beans! You will crave our secret baked beans! Yep you might as well get 2 orders! We got plenty napkins so you might as well get comfy! Hero theme by antthemes.

waterzz.com waterzz.com

Waterzz

Find a wide selection of high quality bottled water for your home or business. Discover water coolers and accessories. We provide the widest range of water solutions from water coolers and water fountains. Start enjoying cleaner water today! We have top brands of water filters, from under sink to industrial grade. Flavored and Enhanced Water. Replacement Countertop Water Filters. Replacement Faucet Water Filters. Replacement Pitcher Water Filters. Replacement Under-Sink Water Filters. Filmtec TW30-1812-5...

wates-belle-vue-crescent.blogspot.com wates-belle-vue-crescent.blogspot.com

Belle Vue Crescent

Monday, 23 December 2013. The Wates team and our sub-contractors would like to thank you for your continued patience whilst we have been on site at Belle Vue Crescent. Our site will close for the Christmas period on Tuesday 24 December, and will re-open in the New Year on Thursday 2 January. Can we also take this opportunity to wish you a Merry Christmas and a Happy New Year! Friday, 29 November 2013. Monday, 18 November 2013. External Finishes have now commenced with flagged paths and block paved drives.

wates-brown-royd-avenue.blogspot.com wates-brown-royd-avenue.blogspot.com

Brown Royd Avenue

Monday, 23 December 2013. The Wates team and our sub-contractors would like to thank you for your continued patience whilst we have been on site at Brown Royd Avenue. Our site will close for the Christmas period on Tuesday 24 December, and will re-open in the New Year on Thursday 2 January. Can we also take this opportunity to wish you a Merry Christmas and a Happy New Year! Thursday, 7 November 2013. Friday, 25 October 2013. The base for the cycle store has been poured so that this area can be flagged.

wates-burgh-mill-gardens.blogspot.com wates-burgh-mill-gardens.blogspot.com

Burgh Mill Gardens

Monday, 22 April 2013. External groundworks are now underway with the installation of Drainage and Statutory services to the plots. Can we please ask all local residents to remind their children to not enter the site on a evenings and weekends. Thank you. Friday, 5 April 2013. Drainage works have progressed well this week, along with the commencement of the last two retaining walls which will then form the car park along the front of the flats. Wednesday, 13 March 2013. Monday, 4 March 2013. First fix bo...

wates-centenary-way.blogspot.com wates-centenary-way.blogspot.com

Centenary Way

Monday, 23 December 2013. The Wates team and our sub-contractors would like to thank you for your continued patience whilst we have been on site at Centenary Way. Our site will close for the Christmas period on Tuesday 24 December, and will re-open in the New Year on Thursday 2 January. Can we also take this opportunity to wish you a Merry Christmas and a Happy New Year! Friday, 29 November 2013. Friday, 25 October 2013. Friday, 11 October 2013. Externally this week the bricklayers and renderers complete...

wates-field-head.blogspot.com wates-field-head.blogspot.com

Field Head

Monday, 4 March 2013. The deep drainage is now complete and the Hydro Brake cast in-situ manhole is ready to be concreted. The car parking bays have been formed and the block Pavia to this area completed. Also prepared are the cycle shed base and the bin store base. The boundary wall has been constructed just leaving the tango fencing to be fixed to it. Friday, 15 February 2013. Our first floor flats are ready to be handed over to the decorators, just got to fill the systems with water and check for leak...

wates-foldings-avenue.blogspot.com wates-foldings-avenue.blogspot.com

Foldings Avenue

Friday, 2 August 2013. Tuesday, 25 June 2013. Friday, 21 June 2013. We are only a few weeks from completion at Foldings Avenue, as you can see the internal finishes are 95% complete to both blocks, the external hard and soft landscaping is the current priority, however we a confident with a run of good weather this will be finished in the next week or so. Wednesday, 10 April 2013. Wednesday, 20 February 2013. Progress has been slow in January due to the adverse weather and cold temperatures, however Febr...

wates-former-fairfield-school.blogspot.com wates-former-fairfield-school.blogspot.com

Former Fairfield School

Thursday, 10 October 2013. We have come a long way since the blog has been down. With only weeks to go before handover the internal are almost complete. As you can see with the photos, the first and second floor are complete, only leaving the main entrance corridor to decorate. We are having the final push on the externals and the temporary car park being replaced back to the original state before we arrived. Monday, 22 July 2013. Friday, 5 July 2013. Friday, 21 June 2013. The second phase of External Wo...

wates-green-mount.blogspot.com wates-green-mount.blogspot.com

Green Mount

Tuesday, 6 August 2013. Mass concrete works have been completed to the retaining wall and the facing stonework has been laid ready for coping stones. Kerbing and hard landscaping works are progressing to the front of Block 1 and adjacent to Block 2. Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Monday, 22 April 2013. Monday, 8 April 2013. The stone ...