wates-former-fairfield-school.blogspot.com wates-former-fairfield-school.blogspot.com

WATES-FORMER-FAIRFIELD-SCHOOL.BLOGSPOT.COM

Former Fairfield School

Thursday, 10 October 2013. We have come a long way since the blog has been down. With only weeks to go before handover the internal are almost complete. As you can see with the photos, the first and second floor are complete, only leaving the main entrance corridor to decorate. We are having the final push on the externals and the temporary car park being replaced back to the original state before we arrived. Monday, 22 July 2013. Friday, 5 July 2013. Friday, 21 June 2013. The second phase of External Wo...

http://wates-former-fairfield-school.blogspot.com/

WEBSITE DETAILS
SEO
PAGES
SIMILAR SITES

TRAFFIC RANK FOR WATES-FORMER-FAIRFIELD-SCHOOL.BLOGSPOT.COM

TODAY'S RATING

>1,000,000

TRAFFIC RANK - AVERAGE PER MONTH

BEST MONTH

October

AVERAGE PER DAY Of THE WEEK

HIGHEST TRAFFIC ON

Monday

TRAFFIC BY CITY

CUSTOMER REVIEWS

Average Rating: 3.7 out of 5 with 10 reviews
5 star
4
4 star
3
3 star
1
2 star
0
1 star
2

Hey there! Start your review of wates-former-fairfield-school.blogspot.com

AVERAGE USER RATING

Write a Review

WEBSITE PREVIEW

Desktop Preview Tablet Preview Mobile Preview

LOAD TIME

1 seconds

FAVICON PREVIEW

  • wates-former-fairfield-school.blogspot.com

    16x16

  • wates-former-fairfield-school.blogspot.com

    32x32

  • wates-former-fairfield-school.blogspot.com

    64x64

  • wates-former-fairfield-school.blogspot.com

    128x128

CONTACTS AT WATES-FORMER-FAIRFIELD-SCHOOL.BLOGSPOT.COM

Login

TO VIEW CONTACTS

Remove Contacts

FOR PRIVACY ISSUES

CONTENT

SCORE

6.2

PAGE TITLE
Former Fairfield School | wates-former-fairfield-school.blogspot.com Reviews
<META>
DESCRIPTION
Thursday, 10 October 2013. We have come a long way since the blog has been down. With only weeks to go before handover the internal are almost complete. As you can see with the photos, the first and second floor are complete, only leaving the main entrance corridor to decorate. We are having the final push on the externals and the temporary car park being replaced back to the original state before we arrived. Monday, 22 July 2013. Friday, 5 July 2013. Friday, 21 June 2013. The second phase of External Wo...
<META>
KEYWORDS
1 posted by
2 wates team
3 no comments
4 email this
5 blogthis
6 share to twitter
7 share to facebook
8 share to pinterest
9 decorating is complete
10 older posts
CONTENT
Page content here
KEYWORDS ON
PAGE
posted by,wates team,no comments,email this,blogthis,share to twitter,share to facebook,share to pinterest,decorating is complete,older posts,or e mail,jodiewalker@wates co uk,blog archive,october
SERVER
GSE
CONTENT-TYPE
utf-8
GOOGLE PREVIEW

Former Fairfield School | wates-former-fairfield-school.blogspot.com Reviews

https://wates-former-fairfield-school.blogspot.com

Thursday, 10 October 2013. We have come a long way since the blog has been down. With only weeks to go before handover the internal are almost complete. As you can see with the photos, the first and second floor are complete, only leaving the main entrance corridor to decorate. We are having the final push on the externals and the temporary car park being replaced back to the original state before we arrived. Monday, 22 July 2013. Friday, 5 July 2013. Friday, 21 June 2013. The second phase of External Wo...

INTERNAL PAGES

wates-former-fairfield-school.blogspot.com wates-former-fairfield-school.blogspot.com
1

Former Fairfield School

http://www.wates-former-fairfield-school.blogspot.com/2013/06/the-second-phase-of-external-works-have.html

Friday, 21 June 2013. The second phase of External Works have now commenced to the dementia courtyard and rear of the building, internally works are still progressing as we continue to fit the kitchen and shower rooms. Note: only a member of this blog may post a comment. Subscribe to: Post Comments (Atom). Click above for more information on Wates Group Limited. Click above for more information on Kirklees Excellent Homes for Life. Call us (Freephone) on. The second phase of External Works have now comme.

2

Former Fairfield School: September 2012

http://www.wates-former-fairfield-school.blogspot.com/2012_09_01_archive.html

Friday, 28 September 2012. We are now putting down the gas membrane and floor insulation, brickwork and drainage is still progressing despite battling the heavy rain. Tuesday, 25 September 2012. We are battling the elements and still progressing works on site. Gas membrane starts tomorrow, and external drainage is progressing around the building. Monday, 17 September 2012. Subscribe to: Posts (Atom). Click above for more information on Wates Group Limited. Call us (Freephone) on.

3

Former Fairfield School: Decorating is complete

http://www.wates-former-fairfield-school.blogspot.com/2013/07/decorating-is-complete.html

Friday, 5 July 2013. All the flats have now been decorated and are getting locked down for snagging to Area A. The commercial kitchen (as seen in the photo) has begun and will be fully supplied and fitted by one sub-contractor. The Scaffolding around the perimeter of the building has almost been dismantled allowing the external works to commence. Note: only a member of this blog may post a comment. Subscribe to: Post Comments (Atom). Click above for more information on Wates Group Limited.

4

Former Fairfield School: January 2013

http://www.wates-former-fairfield-school.blogspot.com/2013_01_01_archive.html

Friday, 25 January 2013. Progress has been limited this week due to the inclement weather. The timber frame has been progressing slowly whilst the dry lining contractor has been carrying out works in selected plots which have not been affected by the snow. Looking forward into next week, we hope the snow clears up and allows. A big push in production for numerous trades. Friday, 18 January 2013. Friday, 11 January 2013. December. Render to the gable ends of area A has begun and will continue in to ne...

5

Former Fairfield School: August 2012

http://www.wates-former-fairfield-school.blogspot.com/2012_08_01_archive.html

Friday, 31 August 2012. The foundations are nearly complete, and we are well on the way with substructure masonry works. The precast concrete lift shaft has also been delivered to site which we are hoping to have installed week commencing 3rd September 2012. Friday, 17 August 2012. Foundations are ongoing to area B and C. Sub-structure block work has started to lower area of A, and completion of the bulk excavation ! Friday, 3 August 2012. Subscribe to: Posts (Atom). Call us (Freephone) on.

UPGRADE TO PREMIUM TO VIEW 14 MORE

TOTAL PAGES IN THIS WEBSITE

19

OTHER SITES

wates-brown-royd-avenue.blogspot.com wates-brown-royd-avenue.blogspot.com

Brown Royd Avenue

Monday, 23 December 2013. The Wates team and our sub-contractors would like to thank you for your continued patience whilst we have been on site at Brown Royd Avenue. Our site will close for the Christmas period on Tuesday 24 December, and will re-open in the New Year on Thursday 2 January. Can we also take this opportunity to wish you a Merry Christmas and a Happy New Year! Thursday, 7 November 2013. Friday, 25 October 2013. The base for the cycle store has been poured so that this area can be flagged.

wates-burgh-mill-gardens.blogspot.com wates-burgh-mill-gardens.blogspot.com

Burgh Mill Gardens

Monday, 22 April 2013. External groundworks are now underway with the installation of Drainage and Statutory services to the plots. Can we please ask all local residents to remind their children to not enter the site on a evenings and weekends. Thank you. Friday, 5 April 2013. Drainage works have progressed well this week, along with the commencement of the last two retaining walls which will then form the car park along the front of the flats. Wednesday, 13 March 2013. Monday, 4 March 2013. First fix bo...

wates-centenary-way.blogspot.com wates-centenary-way.blogspot.com

Centenary Way

Monday, 23 December 2013. The Wates team and our sub-contractors would like to thank you for your continued patience whilst we have been on site at Centenary Way. Our site will close for the Christmas period on Tuesday 24 December, and will re-open in the New Year on Thursday 2 January. Can we also take this opportunity to wish you a Merry Christmas and a Happy New Year! Friday, 29 November 2013. Friday, 25 October 2013. Friday, 11 October 2013. Externally this week the bricklayers and renderers complete...

wates-field-head.blogspot.com wates-field-head.blogspot.com

Field Head

Monday, 4 March 2013. The deep drainage is now complete and the Hydro Brake cast in-situ manhole is ready to be concreted. The car parking bays have been formed and the block Pavia to this area completed. Also prepared are the cycle shed base and the bin store base. The boundary wall has been constructed just leaving the tango fencing to be fixed to it. Friday, 15 February 2013. Our first floor flats are ready to be handed over to the decorators, just got to fill the systems with water and check for leak...

wates-foldings-avenue.blogspot.com wates-foldings-avenue.blogspot.com

Foldings Avenue

Friday, 2 August 2013. Tuesday, 25 June 2013. Friday, 21 June 2013. We are only a few weeks from completion at Foldings Avenue, as you can see the internal finishes are 95% complete to both blocks, the external hard and soft landscaping is the current priority, however we a confident with a run of good weather this will be finished in the next week or so. Wednesday, 10 April 2013. Wednesday, 20 February 2013. Progress has been slow in January due to the adverse weather and cold temperatures, however Febr...

wates-former-fairfield-school.blogspot.com wates-former-fairfield-school.blogspot.com

Former Fairfield School

Thursday, 10 October 2013. We have come a long way since the blog has been down. With only weeks to go before handover the internal are almost complete. As you can see with the photos, the first and second floor are complete, only leaving the main entrance corridor to decorate. We are having the final push on the externals and the temporary car park being replaced back to the original state before we arrived. Monday, 22 July 2013. Friday, 5 July 2013. Friday, 21 June 2013. The second phase of External Wo...

wates-green-mount.blogspot.com wates-green-mount.blogspot.com

Green Mount

Tuesday, 6 August 2013. Mass concrete works have been completed to the retaining wall and the facing stonework has been laid ready for coping stones. Kerbing and hard landscaping works are progressing to the front of Block 1 and adjacent to Block 2. Friday, 21 June 2013. Excavations ,steel fixing and concrete pour for the retaining wall are now completed. The g. As trench is now excavated and g. As, water and electric are now connected to all plots. Monday, 22 April 2013. Monday, 8 April 2013. The stone ...

wates-hare-park-grange.blogspot.com wates-hare-park-grange.blogspot.com

Hare Park Grange

Friday, 8 February 2013. The project is now complete after a seamless handover to Kirklees council on Thursday 7th February. The project was completed to a high quality standard both internally and externally with complimentary remarks from the client and clients representative. Another excellent project delivered from the Wates Kirklees Team. A big thankyou to all involved. Tuesday, 5 February 2013. Internally, we have nearly completed the snagging list produced by Kirklees Council. After the Christmas ...

wates-online.blogspot.com wates-online.blogspot.com

WATES-ONLINE (BLOGnya CAK IMAM)

Recomment to Your Friends.

wates-project-house.blogspot.com wates-project-house.blogspot.com

Project House

Wednesday, 18 September 2013. Friday, 23 August 2013. Externally British Gas laid the mains and fitted the meters. Northern power grid have commenced on site pulling the mains cable and next week will connect onto the existing services. Internally much the same as last week 2nd fix electrics fitting lights and sockets. Plumbers are connecting the sinks and fitting the showers in blocks 2 and 3, giving the plots a feel of completion with only the final decoration to do. Friday, 16 August 2013. On Block 1 ...